During CV/FFD, the ingress node transmits detection packets at a specific interval, and the egress node checks the number and content of these packets at an interval ( ) times the length of the detection packet transmission interval.
In the OTUk frame structure, which of the following alarms are related to section monitoring? (Choose all that apply.)
FILL BLANK
ODUk SNCP has three subtypes: _____, ______, and _____. (Enter the acronyms in uppercase letters.)
Which of the following statements about the PWE3 network reference model is false?
Select the correct on-demand OAM type based on the description for the blank area.
When a GE service is encapsulated into an OTN frame structure and an SDH frame structure, the alarms reported by client-side devices are different.
Which of the following fiber types complies with the description that the dispersion at 1310 nm is 0 and the typical dispersion coefficient around 1550 nm is 17 ps/nm.km?
Which of the following statements about OTN frame structure overheads is false?
FILL BLANK
Colored refers to ____, indicating that each add/drop port can only add or drop fixed wavelengths. (Enter only lowercase letters.)
For hybrid transmission of 100G-and-beyond and 10G signals, it is recommended that the optical power of 100G and beyond signals be higher than that of 10G signals but not higher than the single-wavelength nominal value of an OA board.
A service traverses two WDM rings, the two WDM rings are tangent, and the tangent NEs share an electrical subrack. To Implement segmented ODUk 5NCP, that is, the protection that can protect services from one fault on each ring, which of the following protection schemes must be configured?
For a 100 Gbit/s signal, the baud rate of the data is actually 25 Gbaud/s (100 ÷ 2 ÷ 2=25).
In the electrical-layer structure of OTN, which of the following Is the path layer sequence from the signal input on the WDM side to the signal output on the client side?
Generally, which of the following operations will interrupt services on live networks?
To prevent the optical power at the receive end of an OTU board from being excessively high, you must configure a fixed attenuator according to the actual optical power. The fixed attenuator is usually configured at the transmit end.
Optical power is an Important indicator of a WDM system and directly affects the transmission distance of signals. Therefore, the output optical power of a site must be as high as possible to ensure that signals can reach the peer site.
Which of the following statements about the OptiXtrans E6600/OptiX OSN 1800 system architecture Is true?
The DM function can be used to measure the delay and jitter of service packets.
After a device is powered on, what need to be checked on subrack fans? (Choose all that apply.)
Unlike ROADM, FOADM has some disadvantages. What are the disadvantages of FOAM? (Choose all that apply.)
The OA module inside an EMR8 board provides the____function. With this function, when one or more channels are added or dropped or optical signals of some channels fluctuate, the signal gain of other channels is not affected, (Enter only lowercase letters.)
The EDFA amplifies service signals and brings noise to the system. It is the main source of noise.
A VOA is configured on each wavelength path of a WSS board to adjust the____of optical signals to achieve flatness adjustment. (Enter only lowercase letters.)
Which of the following statements about a TNG2WSMD09 board aretrue? (Choose all that apply.)
The OTUk frame rate can be concluded based on OTU1, OTU2, and OTU3 frame rates. Which of the following is the correct formula for calculating the OTUk frame rate?
OTUk_DEG indicates OTUk signal degradation. Which of the following statements about the bit error detection mode are true? (Choose all that apply.)
When configuring 1+1 optical line protection, you can select RI1/TO1 or RI2/TO2 as the working channel based on our given context.
In a 1+1 OTS optical line protection scenario, when the network is normal, the input optical power of the RI1 port on the OLP board is 10 dBm and that of the RI2 port on the OLP board is 8 dBm. The initial input difference between the working and protection channels is set to the default value 0dB, and the input difference threshold of the working and protection channels is set to default value 5dB. Which of the following scenarios can trigger switching?
When light passes through a passive optical component, the optical power decreases. This decrease is called an insertion loss.
When LCK is inserted at the local ODUk PM overhead, how does the downstream site process the insertion?