Pre-Winter Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

BIM_MGT_101 Autodesk Certified Professional in BIM Management for Building Design Questions and Answers

Questions 4

A regional user group raised awareness about a third-party add-on tool that enables a team to establish thresholds for model warnings. In addition, it automates suppressing warnings deemed negligible to a specific project.

Which two data points should a BIM manager gather to build a business case to have the tool approved for use across the firm? (Select two.)

Options:

A.

The cost per user multiplied by the number of entire office staff, including the cost of time to implement and train on the tool.

B.

How many of the firm’s competitors are already using the tool.

C.

The language that available training materials on the tool are in.

D.

The reliability of the tool creator and the time to install, test, and create training materials on the tool.

E.

The relevant user group, the projected cost to supply the group, and the anticipated time savings and/or risk mitigation that the tool would provide.

Buy Now
Questions 5

A project team has been ignoring their model warnings, and from talking with the team, it is apparent that they are intimidated by the number of warnings and unwilling to tackle resolving them.

What steps can the BIM manager take to educate the team and alleviate their reluctance to address these issues?

Options:

A.

Show the team how warnings are sorted by type and advise them on how to research and resolve them.

B.

Advise the team to export the warnings list, then bulk delete the elements creating the warnings.

C.

Install a third-party add-in that allows the team to mark all warnings with “ignore.”

D.

Create Autodesk Forma issues for each warning and assign them to specific team members.

Buy Now
Questions 6

A project model, which includes multidisciplinary and DWG links, has been exhibiting problematic behavior. It takes a long time to save and synchronize, or crashes unexpectedly. Even though there are no imported DWGs, a scan of the model reveals a large number of IMPORT line patterns that typically come from DWG imports and links and are a possible cause of model-performance loss.

To remedy and prevent a repetition of this situation, the BIM manager is attempting to mentor the team on best practices for preparing DWGs for linking to a Revit model.

Which workflow steps will optimize the DWG files and prevent inefficiencies and loss of productive time due to repeated poor DWG-linking practices?

Options:

A.

Delete all XREFs; change all fonts to Arial.

B.

Delete all text; explode all geometry.

C.

PROXYGRAPHICS=0, PURGE, AUDIT, OVERKILL.

D.

PROXYGRAPHICS=1, PURGE ALL, AUDIT, OVERKILL.

Buy Now
Questions 7

During early coordination on a hospital project, the BIM manager runs a general clash detection between all models and generates over 3,000 clash results. Many are low-priority issues, such as wall-grid overlaps and minor duct-ceiling intersections. The project’s clash matrix outlines only high-impact clashes between structural, MEP, and architecture in specific zones.

For the BIM manager, what is the most appropriate next step to align clash reporting with the project’s coordination strategy?

Options:

A.

Share the full clash report with all project teams and instruct them to determine and resolve the issues they consider most important.

B.

Export the entire clash list into spreadsheet format so project managers can manually sort, review, and prioritize the items by trade.

C.

Disable or relax selected non-critical clash rules within the detection software to temporarily reduce the total number of reported issues.

D.

Apply the clash matrix to filter out low-priority clashes, adjust detection tolerances where appropriate, and produce reports for each discipline’s scope.

Buy Now
Questions 8

A museum project anticipating generative iterations is being designed by a team working across multiple time zones under a tight schedule. The client hosts weekly meetings to review various façade options, document sustainability goals, and evaluate numerous energy analyses.

What project-specific training should the design technology team provide to prepare the team for client meetings and ensure successful project execution?

Options:

A.

AutoCAD, Autodesk Forma, generative design.

B.

Generative design, AutoCAD, Civil 3D.

C.

Forma Site Design, generative design, Autodesk Forma.

D.

Sustainability certification, Revit, Forma Site Design.

Buy Now
Questions 9

A client’s project schedule requires a rigorous milestone/gateway review process, defined in the BIM Execution Plan. The design firm has its own internal checklist.

What should a BIM manager do to ensure the team is complying with the client’s requirements?

Options:

A.

Add the client as a member on Autodesk Forma and allow them access to the published model.

B.

Import the client requirements as a PDF on the Revit opening view.

C.

Remap the phase of the model to match the client phase most aligned to Design Development.

D.

Review BEP requirements against the checklist and create Issues in Autodesk Forma for non-standard requirements.

Buy Now
Questions 10

A firm-wide Revit template has an advanced setup of views preset on sheets. A renovation project has a linked as-built model with levels that do not align with levels from the model template.

What method should a BIM manager use to update the levels and create grids in sync with the resource model, without requiring extensive reworking of the preset sheets?

Options:

A.

Align model levels to the linked levels and use Copy/Monitor to duplicate the linked grids.

B.

Create a Scope Box around the linked model and assign it to the template levels and grids.

C.

Delete the template’s levels and use Copy/Monitor to duplicate the linked levels and grids.

D.

Customize a View Template to hide the template levels and only show the linked levels.

Buy Now
Questions 11

Which of the following would typically be included in an AECO BIM data handover package at project closeout?

Options:

A.

Internal meeting notes from model coordination sessions.

B.

Federated design models used during clash detection.

C.

3D views used for clash detection during model coordination.

D.

Record models with the required asset data embedded.

Buy Now
Questions 12

During an initial coordination meeting, the team agreed that the contractor will be able to mark up the latest model and sheets in Autodesk Forma every week.

Which two actions should the BIM Manager take to ensure this is implemented correctly? (Select two.)

Options:

A.

Email PDFs to the contractor every week.

B.

Update Publish Settings to include sheets.

C.

Create blank sheets for all disciplines.

D.

Enable Model Coordination.

E.

Schedule Publishes in Design Collaboration.

Buy Now
Questions 13

A contractor has requested the Architectural Revit model for a design-bid-build project to help with their fabrication drawings. The contractor understands and agrees that construction documents will govern in case of discrepancies.

How should the BIM Manager proceed?

Options:

A.

Add the contractor to the Autodesk Forma project for model access given their understanding.

B.

Copy the model file and send it as soon as possible.

C.

Verify that the contractor has signed a digital content release form before sending the model.

D.

Export the sheets to DWG format and send those files.

Buy Now
Questions 14

A government facility project requires unique data formatting and export requirements that comply with a global data-management initiative. A workflow utilizing a newly released add-on tool is developed to perform this task.

How should a BIM manager define training and ensure the appropriate staff receive it?

Options:

A.

Create training tutorials for the unique tasks and assign them to the members whose roles are responsible for the tasks.

B.

Develop a full training curriculum and assign all members of the project team, regardless of role.

C.

Assign the task to the team and provide training to any user whose Journal reveals a crash.

D.

Review each project model at milestone deliveries and assign the team training on items that fail the quality-control review.

Buy Now
Questions 15

What setting should be defined in the Family Template for Mechanical Equipment families intended for use in projects in specific countries?

Options:

A.

Object Styles set to the country’s official language.

B.

All parameters set to Instance.

C.

Project Location set to the intended country.

D.

Units set to the intended country’s standard format.

Buy Now
Questions 16

The BIM manager on a large mixed-use development is leading the development of the project’s information-delivery strategy. The client has strict handover requirements for both asset data and spatial coordination. The design schedule includes overlapping packages, and some task teams are unfamiliar with structured data exchanges.

What is the most appropriate approach to establish the project’s information-delivery plans?

Options:

A.

Rely on each task team to define its own data requirements and delivery formats, then consolidate them into a mixed-use matrix mid-project.

B.

Assign each discipline a default set of file-naming conventions and assume its internal processes will align with delivery needs.

C.

Develop a task and information-delivery plan to coordinate when, how, and by whom specific project information will be delivered.

D.

Focus first on model-coordination planning, then address information delivery later in the construction phase.

Buy Now
Questions 17

The BIM manager is launching a civic center project with strict sustainability and lifecycle data goals. During early planning, each discipline proposes different modelling approaches, and there is concern that downstream data handoff may be inconsistent.

To establish BIM goals and uses that ensure alignment from design through operations, what should the BIM manager do first?

Note: In the context of this exam, the term Level of Development (LOD) is used interchangeably with level of information need.

Options:

A.

Ask each team to submit its standard BEPs for review and consolidate them into one reference document.

B.

Finalize the LOD matrix and data drops based on similar past projects, updating it during the design process as needed.

C.

Begin developing the internal BIM templates and content, assuming they will be applicable to this project.

D.

Host a stakeholder session to review the project-specific requirements and BIM uses, and establish mobilization needs and modelling requirements.

Buy Now
Exam Code: BIM_MGT_101
Exam Name: Autodesk Certified Professional in BIM Management for Building Design
Last Update: Sep 8, 2026
Questions: 57
BIM_MGT_101 pdf

BIM_MGT_101 PDF

$25.5  $84.99
BIM_MGT_101 Engine

BIM_MGT_101 Testing Engine

$30  $99.99
BIM_MGT_101 PDF + Engine

BIM_MGT_101 PDF + Testing Engine

$40.5  $134.99