Which of the following can be used as a metric for training? (Select all that apply)

The X/Y/Z Corporation decides to track an activity as shown in the diagram. They interpret the results to indicate a possible deteriorating performance in one of their process safety management elements.
The chart shows a declining trend in the number of industry group meetings at which company presenters shared significant lessons learned over several years.
Which of the following RBPS elements is MOST directly reflected by this activity?
Which of the following are effective methods for verifying that an operator understood the training provided? (Select all that apply)
Secondary dust explosion consequences are often related to poor housekeeping, true or false?
Which of the following approaches can be used to prevent fires and explosions? (select all that apply)

During a field inspection of the process piping in a production unit, a section of piping is identified as containing a dead leg in which stagnant liquid is trapped. It is determined that this dead leg branch line is used very infrequently. Assume that the plant is in a location where winter temperatures drop below 20°F (-7°C) and summer temperatures can exceed 90°F (32°C). Which of the following are valid process safety reasons to remove the line? (Select all that apply)
An organization with strong Conduct of Operations is able to minimize: (select all that apply)
It is considered good Risk Based Process Safety practice to periodically review operating procedures, and this review must be done by the person who wrote the procedure.
True or False?

A chemical processor has a chlorine unloading facility shown in the sketch. The area has an ambient chlorine detector with audible alarm and a chemical operator is continually in attendance during the unloading operation. In the event of a leak, the action plan is to spray water on the leak and the contained spill to effect some dilution. Identify and discuss any negative consequences that might result from implementing this plan.
The XYZ Corporation decides to track an activity as shown in the diagram. They interpret the results to indicate a possible deteriorating performance in one of their process safety management elements.
Which of the following would be most effective as a leading metric for a Management of Change program?
A material had been oxidized many times, without incident, under an oxygen atmosphere in a small pilot plant vessel. While scaling up to a larger vessel, the plant engineers decided they could improve gas/liquid contact by using a more efficient feed dispersing system. This dispersing system filled the reactor ' s vapor space with a fine combustible mist. Several hours after startup, the vessel was ruptured by an internal mist explosion. The source of ignition was a small amount of catalyst left over from an earlier set of experiments. This was a phenomenon that the engineers had not considered. Which of the following risk based process safety elements could have helped prevent this incident? (Select all that apply)
Which of the following statements are correct regarding the flow control loop in the illustration? (Select all that apply)

A facility has implemented a program of tracking the rate of submittals of process safety related employee suggestions. Which Risk Based Process Safety element does this program demonstrate?
Development and documentation of information about the equipment and chemicals is most closely related to which risk based process safety element?
Which of the following are Hazard Identification and Risk Analysis methods? (Select all that apply)
Consider the information shown on the diagram. Which Risk Based Process Safety elements are most relevant to this situation? (select all that apply)

Which of the following Risk-Based Process Safety elements are expected to be most directly and frequently involved with the Emergency Management Element? (select all that apply)
Sources of information on previous incidents to be reviewed during a Process Hazard Analysis can include: (select all that apply)
A field operator contacted the control room about a leaking connection on a heat exchanger. The control room operator instructed the field operator to bypass the heat exchanger. However, unknown to the control room operator, additional piping had recently been installed upstream of the heat exchanger, and had not been recorded on the P & ID. When the field operator incorrectly opened a valve in the new piping, the process stream was routed to an unintended location.
Which of the following groups of Risk Based Process Safety elements, if properly implemented, could have prevented this incident?
A weak process safety culture can degrade the effectiveness of the incident investigation element, true or false?
What are some characteristics of an effective Management of Change system: (select all that apply)
Which of the following typically require piping wall thickness inspections? (Select all that apply)
CCPS |