Which tool should be used to set the coordinate system of a raster dataset that is currently unknown?
In ArcGIS Pro, which type of unit of measure is always used for a vertical coordinate system?
A GIS technician wants to perform spatial analysis for an area of interest extending in an east-to-west orientation. The technician needs to preserve the shape of the data.
Which projection should the technician use to minimize distortion?
A cartographer wants to create a printable map using a predefined layout that meets their organization's branding guidelines.
Which method is the most efficient for the cartographer's needs?
A GIS analyst has over 100 rasters of the same resolution and dimension. The analyst needs to combine all rasters into one raster so that it is easier to share with other analysts who need to perform analysis on the raster(s).
What should the analyst do?
A GIS intern is examining two feature classes to determine whether there are any differences in the geometry, attributes, and spatial reference.
Which geoprocessing tool should the intern use?
A GIS analyst works for a small city's GIS department, which uses the same projected coordinate system for all data. The analyst's common workflows often require geoprocessing tools that create new outputs of data on disk.
Which workflow will produce geoprocessing outputs with the desired coordinate system?
An organization that manages vector data as shapefiles wants to use topology rules for editing data.
What should be the initial steps to implement topology?
A GIS technician working with 3D building data wants to interactively view only specific floors of a building at a time.
Which layer property allows for this type of visualization?
A GIS analyst is reviewing the work of an intern and realizes that the intern added feature attribute information directly to the attribute table. Many of the features have no geometry and do not display on the map. The analyst uses Check Geometry to identify all features with null geometries.
Which method should the analyst use to allow adding the geometry to existing features so that they can be visualized in the map?
A GIS specialist is adding fields to an existing table using the Add Field geoprocessing tool to conduct analysis. The type of analysis requires numeric data that stores information to 4 decimal points.
Which field type and associated precision and scale meets these requirements?
In ArcGIS Pro, which tool should be used to change the coordinate system of a dataset to a different coordinate system?
A GIS analyst has various datasets, maps, database connections, and toolboxes. The analyst plans on sharing this to their ArcGIS Online organization for easy access by coworkers.
Which package should be shared to the analyst's ArcGIS Online organization to facilitate collaboration by a coworker?
A GIS administrator receives reports from editors regarding schema locks on regularly updated enterprise data. Editors need to take turns editing, and project timelines are prolonged.
Which geodatabase capability will resolve this issue?
A GIS specialist is spending too much time editing text (for example, formatting and placement) associated with specific dynamic features in a series of maps they create regularly. The specialist wants to have fine-grain control of each feature's associated text.
Which method is most efficient?
A land surveyor downloads an Excel sheet from the city website that contains the updated land cover codes with over 30 classes.
Which tool will help the surveyor update their existing land cover data to the new codes?
A GIS analyst must identify when and where bicycle accidents occur throughout a specific city within a one-year period. The data provided includes bicycle accidents for the entire state and spans a three-year period. The analyst wants to limit visibility and geoprocessing to the features of interest.
Which workflow should the analyst follow?
A GIS analyst has a buildings feature class. The analyst needs to show the type of building, such as commercial or residential, and extrude the buildings based on height.
Which symbology type should the analyst use to produce the required output?