Questions 4

In a 3-star business hotel near the city center, which of the following elements of the building’s water use breakdown is/are likely to consume the most water?

Options:

A.

Showers in guest rooms

B.

Laundry

C.

Toilets in lobby area

D.

Faucets in guest rooms

Buy Now
Questions 5

Client has provided the specification as per the image for low flow shower heads. What is the flow rate for shower heads that should have been entered to EDGE software?

Options:

A.

4

B.

6

C.

1,315

D.

3,590

Buy Now
Questions 6

An EDGE Auditor has received initial documentation from a Client which implies that measures not selected on the downloaded PDF can be claimed. What should the Auditor do?

Options:

A.

The Auditor should ask for advice from the EDGE Partner and then take action.

B.

The Auditor should modify the self-assessment and submit the project for certification.

C.

Inform the Client to update the EDGE software and prepare a new PDF.

D.

As submission documents are correct, the Auditor should ignore the error on PDF.

Buy Now
Questions 7

In order for a project to complete the design certification stage requirements, the EDGE Client must do which of the following?

Options:

A.

Internally review the EDGE measures with their design team and third-party consultant.

B.

Access the EDGE software and begin and complete a full self-assessment of the building.

C.

Provide the EDGE Auditor access to the self-assessment and all supporting documentation.

D.

Review and sign an agreement with a local or global partner to provide EDGE certification services.

Buy Now
Questions 8

In the EDGE software, which of the following does NOT produce grey water?

Options:

A.

Shower

B.

Hand wash basin

C.

Bath tub

D.

Water closet WC

Buy Now
Questions 9

What will reduce the hot water demand in a hotel building?

Options:

A.

Solar photovoltaics (PVs)

B.

Solar water heating

C.

Low-flow shower heads

D.

Heat pumps for hot water

Buy Now
Questions 10

The Base Case for utility costs:

Options:

A.

Excludes the cost of virtual energy.

B.

Includes the cost of virtual energy.

C.

Excludes the cost of virtual energy only in homes.

D.

Includes the cost of virtual energy only in homes.

Buy Now
Questions 11

VRV / VRF System is best used for:

Options:

A.

Single zone space

B.

Single zone office space

C.

Multizone space

D.

Meeting space

Buy Now
Questions 12

Which of the following is NOT a characteristic of the EDGE standard?

Options:

A.

Fast tool with ideal measures for the best return on investment

B.

Holistic approach that takes into account wider sustainability issues

C.

Smart, as capital costs and payback period for buildings are displayed

D.

Simple, as beneath the intuitive interface is a powerful engine that understands local climate and how buildings will be used

Buy Now
Questions 13

Water consumption savings, resulting from greywater recovery, are based on which of the following?

Options:

A.

Base case water consumption

B.

Improved case water consumption

C.

Cost of water consumption at local tariff

D.

Incremental cost of installation and cost of water consumption at local tariff

Buy Now
Questions 14

In the EDGE software, the Base Case selection of external wall materials in hotels relies on information derived from:

Options:

A.

Typical building practices as well as national building performance codes, where they are in existence.

B.

Global building practices as well as international building performance codes, where they are in existence.

C.

Hotel developers' corporate standard specifications, or materials which have been accredited by the hotel industry.

D.

Local building material suppliers who subscribe to EDGE certification for their materials, or are nationally accredited by the local standards authority.

Buy Now
Questions 15

Which of the following must be included in the EDGE Auditor submission for Preliminary Certification?

Options:

A.

All of the available design data.

B.

The Chapter 5 EDGE certification protocol.

C.

Compliance documents for selected measures.

D.

The design audit site visit results verified by the EDGE Auditor.

Buy Now
Questions 16

Other than embodied carbon, the selection of wall materials has an impact on

Options:

A.

Window to Wall Ratio WWR.

B.

energy consumption.

C.

internal heat gains.

D.

solar heat gain coefficient.

Buy Now
Questions 17

Which of the following is NOT an option for insulation in materials efficiency measures?

Options:

A.

Mineral wool

B.

Polyurethane

C.

Polypropylene

D.

Polystyrene

Buy Now
Questions 18

Company A is developing a logistic center of 15,000 m² in Kenya. The project consists of 14,000 m² of warehouse space, 500 m² of office space, and 500 m² of technical areas mechanical and electrical. The company is looking for a single certification for the project. Which EDGE Building type should be selected for the certification?

Options:

A.

Office

B.

Retail

C.

Logistic

D.

Industrial

Buy Now
Questions 19

In EDGE software, which of the following is a water saving measure?

Options:

A.

Drip irrigation

B.

Hose pipe irrigation

C.

Sprinkler irrigation

D.

Water efficient landscaping

Buy Now
Questions 20

Which of the following passive design features is considered within the EDGE calculation methodology?

Options:

A.

Lighting controls

B.

External shading

C.

Renewable energy

D.

Efficient cooling system

Buy Now
Questions 21

EDGE was created for new buildings to promote:

Options:

A.

Revenue for green building champions.

B.

Few exemplary high-performance buildings.

C.

Simple and scalable platform for green buildings.

D.

Highly accurate prediction of resource consumption.

Buy Now
Questions 22

The Client informs an EDGE Auditor that a key member of the design team has resigned. The Client requests the Auditor to take the member’s place for the remainder of the project’s design development as it would provide the Auditor an opportunity to identify suitable green building measures, making audit tasks much simpler. What should the EDGE Auditor do?

Options:

A.

Resign from the audit role on the basis that its position has been compromised by this direct approach by the Client.

B.

Refer the Client to an associate within the organization who works in another department, but is qualified and available to carry out the work.

C.

Accept the additional commission on the basis that this will save the Client time and money, and would reduce the volume of work required for the audit.

D.

Refer the Client to an associate within the organization who will be working with the Auditor on the EDGE audit, since the Auditor organization has spare capacity.

Buy Now
Questions 23

Which of the following BEST describes an EDGE Expert?

Options:

A.

A consultant who can issue a preliminary EDGE certificate

B.

An individual accredited by the EDGE Certifier who can serve as a consultant

C.

An individual who can serve as both an auditor and a consultant upon EDGE Committee approval

D.

An individual accredited by the EDGE Operations and Management Team who can serve as a consultant

Buy Now
Questions 24

Implementing the green building measures claimed for EDGE certification is the responsibility of

Options:

A.

the Client.

B.

the Certifier.

C.

the EDGE Auditor.

D.

the EDGE Partner.

Buy Now
Questions 25

Which of the following wall solar reflectivity indexes would be the most energy efficient in a hot climate?

Options:

A.

0.2

B.

0.3

C.

0.4

D.

0.7

Buy Now
Questions 26

When properly designed, which of the following ventilation strategies can improve comfort by providing access to fresh air and reducing temperature without using any energy?

Options:

A.

Natural ventilation

B.

Heat recovery ventilator

C.

Energy recovery ventilator

D.

Continuously running mechanical ventilation

Buy Now
Questions 27

Ceiling fans are an efficient way to increase air movement and therefore thermal comfort. Which of the following forms part of the evidence to demonstrate compliance at the design stage?

Options:

A.

Photographs of the installed ceiling fans

B.

Computational Fluid Dynamics (CFD) assessment of all habitable spaces

C.

Manufacturer's data sheet of the ceiling fans

D.

Purchase receipts of the ceiling fans

Buy Now
Questions 28

In an air conditioned building with air cooled chiller, selecting insulation in the roof will influence

Options:

A.

only energy.

B.

energy and water.

C.

water and materials embodied energy.

D.

energy and materials embodied energy.

Buy Now
Questions 29

What is the application process for an architect with more than three years of professional experience to become an EDGE Auditor?

Options:

A.

Apply directly to a EDGE Certifier.

B.

Apply directly to EDGE Operations and Management Team.

C.

First become an EDGE Expert, then apply to a Certifier.

D.

First become an EDGE Expert, then apply directly to IFC.

Buy Now
Questions 30

Increasing the glazing area of an office building will NOT impact which of the following?

Options:

A.

Cooling demand

B.

Heating demand

C.

Lighting energy

D.

Hot water demand

Buy Now
Questions 31

Coefficient of Performance (COP) of the electrical chiller is defined as:

Options:

A.

Thermal output / thermal input.

B.

Thermal output / electrical input.

C.

Electrical input / thermal output.

D.

Electrical output / electrical input.

Buy Now
Questions 32

Which of the following may NOT lead to a higher adoption of green building practices?

Options:

A.

Green building regulations

B.

Lower electricity supply costs

C.

Public awareness and capacity building

D.

Clear visibility of estimated savings and cost of green measures

Buy Now
Questions 33

During a design audit, an EDGE Auditor notices that the project does not meet the EDGE standard for energy. Which of the following is an acceptable course of action for the Auditor?

Options:

A.

Ask the Client to use the EDGE tool again to identify options that will take the project comfortably over the EDGE standard.

B.

Contact the design team directly to work with them to find a solution to improve the energy efficiency performance of the project.

C.

As the project does not qualify for EDGE certification, the EDGE Auditor does not have to take any further action on the project.

D.

Based on the Auditor’s previous experience on working on similar projects, provide a list of measures that the Client could incorporate in the project that will take them comfortably over the EDGE standard.

Buy Now
Exam Code: EDGE-Expert
Exam Name: Excellence in Design for Greater Efficiencies (EDGE Expert) Exam
Last Update: Apr 6, 2026
Questions: 110
EDGE-Expert pdf

EDGE-Expert PDF

$25.5  $84.99
EDGE-Expert Engine

EDGE-Expert Testing Engine

$30  $99.99
EDGE-Expert PDF + Engine

EDGE-Expert PDF + Testing Engine

$40.5  $134.99