Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

HQT-4180 Hitachi Vantara Qualified Professional - VSP Midrange Family Installation Questions and Answers

Questions 4

Which manual should be used when performing maintenance actions on VSP midrange storage systems?

Options:

A.

Administrator Guide

B.

Product Documentation Library

C.

Maintenance Manual

D.

Service Guide

Buy Now
Questions 5

What are two consequences when a “New Installation” procedure is performed on a VSP Midrange system? (Choose two.)

Options:

A.

The SVP drive is formatted.

B.

The MPC software is updated.

C.

All the data on RAID groups is lost.

D.

The license keys are deleted.

Buy Now
Questions 6

The SVP of a VSP G900 system failed and you have been asked to replace it.

Which two items must be available to perform the replacement? (Choose two.)

Options:

A.

the iso file with the correct version of Hitachi Ops Center

B.

the iso file with the correct version of the Windows operating system

C.

the microcode iso file with the correct software versions

D.

the Hitachi Remote Ops Monitor Agent iso file

Buy Now
Questions 7

Which tool do you use to install license keys on a VSP G370 system?

Options:

A.

HSA Embedded

B.

MPC Software

C.

Storage Navigator

D.

Maintenance Utility

Buy Now
Questions 8

You need to replace a broken fan in a VSP E1090.

What is the correct procedure?

Options:

A.

Use the MPC for blocking the fan, then replace it.

B.

Use the Maintenance Utility for stopping the fan, then replace it.

C.

Remove the broken fan, then replace it.

D.

Use Storage Navigator for blocking the fan, then replace it.

Buy Now
Questions 9

You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.

What are two requirements? (Choose two.)

Options:

A.

The CHBs must be updated first.

B.

The Microprocessor utilization should be below 50%.

C.

The Cache Write Pending rate should be below 30%.

D.

There should be no sparing processes running in the background.

Buy Now
Questions 10

A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.

What needs to be performed next?

Options:

A.

The RAID level must be changed in Storage Navigator.

B.

The RAID level must be changed in the SVP Maintenance window.

C.

The RAID 5 Group must be put into DRU mode in Storage Navigator.

D.

The RAID Group must be deleted.

Buy Now
Exam Code: HQT-4180
Exam Name: Hitachi Vantara Qualified Professional - VSP Midrange Family Installation
Last Update: Sep 10, 2025
Questions: 35
HQT-4180 pdf

HQT-4180 PDF

$29.75  $84.99
HQT-4180 Engine

HQT-4180 Testing Engine

$35  $99.99
HQT-4180 PDF + Engine

HQT-4180 PDF + Testing Engine

$47.25  $134.99