Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

ITFAS-Level-1 Inspection and Testing of Fire Alarm Systems Level I Exam Questions and Answers

Questions 4

What is the periodic testing frequency of a control valve switch?

Options:

A.

Monthly

B.

Quarterly

C.

Semiannually

D.

Annually

Buy Now
Questions 5

What is the maximum number of attempts that a digital alarm communicator transmitter (DACT) is allowed to make before a trouble condition shall be indicated?

Options:

A.

5

B.

10

C.

12

D.

15

Buy Now
Questions 6

Load testing of the control unit's VRLA batteries reveals that they must be replaced. Which two of the following are requirements for the replacement of VRLA batteries? (Choose two.)

Options:

A.

Batteries shall be approved by the authority having jurisdiction.

B.

Batteries shall be listed by a nationally recognized testing laboratory.

C.

Batteries shall be marked with the month and year of manufacture.

D.

Batteries shall be the same make and model as those being replaced.

Buy Now
Questions 7

What is the interval of a trouble signal test for retransmission to an off-premises location?

Options:

A.

Weekly

B.

Monthly

C.

Semiannually

D.

Annually

Buy Now
Questions 8

The flash rate of visible notification appliances shall be a minimum of how many flashes per second?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Questions 9

Which activity is required at the semiannual inspection of notification appliances?

Options:

A.

Verify candela setting

B.

Verify flash rate

C.

Verify location and condition

D.

Verify synchronization of strobes

Buy Now
Questions 10

What is the testing frequency of an engine driven generator?

Options:

A.

Weekly

B.

Monthly

C.

Semiannually

D.

Annually

Buy Now
Questions 11

The fire alarm control unit shows a supervisory signal on the display. What is the possible cause?

Options:

A.

A duct smoke detector is in alarm.

B.

A manual fire alarm box has been activated.

C.

A spot smoke detector is in alarm.

D.

A waterflow alarm has been activated.

Buy Now
Questions 12

Secondary power shall automatically provide power to a protected premises system within how many seconds after the primary power fails?

Options:

A.

10

B.

30

C.

60

D.

90

Buy Now
Questions 13

The inspection phase, as opposed to the testing phase, of system control equipment should concentrate on which of the following tasks?

Options:

A.

Activation of all initiating devices

B.

Operational reliability only

C.

Proof of signals at monitoring facility

D.

Visual inspection only

Buy Now
Questions 14

How often does a technician test the manual operation of a master box on a public emergency alarm reporting system?

Options:

A.

Monthly

B.

Quarterly

C.

Semiannually

D.

Annually

Buy Now
Questions 15

At which height above the floor is the sound level measured for public and private modeaudible devices?

Options:

A.

2.5 feet (0.7 meter)

B.

5.0 feet (1.5 meters)

C.

7.5 feet (2.3 meters)

D.

8.0 feet (2.4 meters)

Buy Now
Questions 16

A single open fault, in a Class A pathway, shall result in the annunciation of which of the following signals?

Options:

A.

Alarm

B.

Pre-alarm

C.

Supervisory

D.

Trouble

Buy Now
Questions 17

Where smoke detectors are installed for protection during construction, they shall be cleaned and verified to be within the marked sensitivity range before which event?

Options:

A.

Final cleaning

B.

Final commissioning

C.

Pre-test of system

D.

Walk-through by engineer

Buy Now
Questions 18

At which interval do duct smoke detectors utilized for HVAC shutdown need to be tested?

Options:

A.

Monthly

B.

Quarterly

C.

Semiannually

D.

Annually

Buy Now
Questions 19

Verification of a DACT’s trouble signal to the fire alarm shall be received within a maximum of how many minutes when the primary telephone line is disconnected?

Options:

A.

2

B.

3

C.

4

D.

5

Buy Now
Questions 20

An off-normal signal shall be initiated during which of the following travel distances of the valve control apparatus from its normal position?

Options:

A.

1/5

B.

1/4

C.

1/3

D.

1/2

Buy Now
Questions 21

Within what time limit shall a sprinkler waterflow alarm-initiating device activate?

Options:

A.

90 seconds

B.

100 seconds

C.

120 seconds

D.

180 seconds

Buy Now
Questions 22

An inspector has been given a list of 45 devices and 1 fire alarm control unit that needs to be inspected at a job site. The inspector knows it takes on average about 2 minutes to inspect 1 device with documentation. Also, the inspector knows it takes 20 minutes to perform the required tests on the fire alarm control unit and get the system restored.

How long does the inspector tell the owner that the fire alarm system is expected to be impaired?

Options:

A.

1 hour, 5 minutes

B.

1 hour, 10 minutes

C.

1 hour, 30 minutes

D.

1 hour, 50 minutes

Buy Now
Questions 23

After 15 years from initial installation, all fixed-temperature, nonrestorable heat detectors shall be replaced or have how many detectors per 100 laboratories tested?

Options:

A.

2

B.

4

C.

6

D.

8

Buy Now
Questions 24

Which of the following is the inspection frequency of the candela rating of visible appliances?

Options:

A.

Initial acceptance and quarterly

B.

Initial acceptance and semiannually

C.

Initial acceptance and if a malfunction occurs

D.

Initial acceptance and no further inspections

Buy Now
Questions 25

In the event of power loss, how long shall a secondary power source for household fire alarm systems maintain operation?

Options:

A.

24 hours in the normal condition followed by 4 minutes of alarm

B.

24 hours in the normal condition followed by 9 minutes of alarm

C.

24 hours in the normal condition followed by 10 minutes of alarm

D.

24 hours in the normal condition followed by 60 minutes of alarm

Buy Now
Exam Code: ITFAS-Level-1
Exam Name: Inspection and Testing of Fire Alarm Systems Level I Exam
Last Update: May 9, 2025
Questions: 85
ITFAS-Level-1 pdf

ITFAS-Level-1 PDF

$29.75  $84.99
ITFAS-Level-1 Engine

ITFAS-Level-1 Testing Engine

$35  $99.99
ITFAS-Level-1 PDF + Engine

ITFAS-Level-1 PDF + Testing Engine

$47.25  $134.99