Prior to circulating the service specification to a tendering supplier, it is good practice for the purchasing organisation to request completion of a non-disclosure agreement. Is this statement correct?

Options:

A.

No, because the non-disclosure agreement has no legal standing

B.

Yes, because the non-disclosure agreement protects intellectual property

C.

Yes, because the non-disclosure agreement encourages transparent bidding

D.

No, because the non-disclosure agreement only applies after contracting

Buy Now
Questions 5

Which of the following statements is FALSE on contracts for the leasing of assets?

Options:

A.

The party responsible for maintenance, insurance and taxes is subject to negotiation

B.

In lease agreement, the possession and right of use of an asset are transferred to the lessee

C.

The ownership of leased asset is transferred to the lessee at the end of the period

D.

The lessee may bear some risks of ownership, such as the liability to insure the asset

Buy Now
Questions 6

Which of the following are reasons why a buying organisation adopts a model contract?

1. Extremely advantageous terms for buyer

2. Correct legal terminology

3. Supplier cannot make variation to the model form

4. Specific to industry

Options:

A.

1 and 2 only

B.

2 and 4 only

C.

2 and 3 only

D.

1 and 4 only

Buy Now
Questions 7

A buyer is procuring innovative new IT systems and has issued a performance specification as part of the invitation to tender. Is this a suitable approach?

Options:

A.

No, because the bidder may use it to inflate costs

B.

Yes, because it allows the bidder to present solutions and further inform the requirement

C.

No, because the Procurement Team should only include outputs in specifications

D.

Yes, because it will improve relationships and collaboration between both parties

Buy Now
Questions 8

Esther Francis has recently changed job from a supply role at Shine Cleaning Services (SCS) to a purchasing role at Southern Commercial Property (SCP).

Esther requires industry technical input to develop a cleaning services requirements specification for her new employer. Esther Francis wants to include her former employer SCS, in a market engagement exercise to inform the specification. Which of the following would be the most appropriate way to deal with the conflict of interest?

Options:

A.

Conduct the market engagement with SCS off the record

B.

Declare the potential conflict of interest to a senior manager of SCS

C.

Ask a colleague to conduct the market engagement with SCS

D.

Conduct market engagement with several capable suppliers, including SCS

Buy Now
Questions 9

Maximum Score 1

A construction company wishes to place the contract for the building of a new hotel to a principal contractor using a model form contract. Which of these is an advantage of using a ‘model form contract’?

Options:

A.

It avoids the requirement to create complex contracts each time but can be adapted to suit particular circumstances

B.

Formulae or indices can be included to assess any additional supplier’s claims for contract price adjustment

C.

Incentive payment terms can be included to reward the supplier for attainment of cost savings

D.

Legal advice is still required if significant amendments or variations are to be made to the contract

Buy Now
Questions 10

SFO procurement manager sent a request for quotation to Vogon International in which he determined the contract terms and specification. In SFO's standard terms and conditions, it is stated that 'Goods shall be delivered and Services performed by the applicable Delivery Date. Supplier must notify Buyer 3 days prior to the Delivery Date if Supplier is likely to be unable to meet a Delivery Date.'

Vogon replied with a quotation without any amendment to SFO's terms & conditions. The SFO procurement manager found the prices were reasonable and submitted to senior management. Senior management team accepted that quotation and sent a notification to Vogon. On the Delivery Date, Vogon said they had no capacity to supply the product as the quotation due to a workers' strike. Did Vogon breach any agreement with SFO?

Options:

A.

No, because Vogon had no intention to be bound by the quotation, therefore, it didn’t constitute a contract

B.

No, because the strike is a force majeur event, so Vogon did not breach any contract with SFO

C.

Yes, because the contract was formed since Vogon had sent the quotation as an acceptance to SFO’s offer

D.

Yes, because the contract had been formed between SFO and Vogon with the quotation as an offer and the notification as an acceptance

Buy Now
Questions 11

MWB operates serviced offices in central London. Rock entered a contractual licence with MWB to occupy office space in Marble Arch and had accumulated licence fees in arrears. The original licence agreement contained a ‘No Oral Modification’ clause that said: 'All variations to this licence must be agreed, set out in writing and signed on behalf of both parties before they take effect'.

After 6 months, Rock director re-negotiated to extend payment period over phone call and MWB credit controller agreed his proposal. Is this agreement considered as an effective variation to the original licence agreement?

Options:

A.

Yes, because parties who agree to altering the original contract orally despite a ‘No Oral.

B.

Modification’ clause, must have intended to dispense with the clause

C.

No, because the mechanism for variation has been set out in the original contract

D.

Yes, because the credit controller had agreed with Rock director’s proposal

E.

No, because Rock director assumed that the variation was effective and convinced credit controller to believe it

Buy Now
Questions 12

As a result of a global pandemic, a local hospital is facing significant patient capacity pressures and would like the construction of a new 50-bed ward to be prioritised and fully operational at the earliest opportunity. Which of the following pricing arrangements would support this aspiration?

Options:

A.

Incentivised contract pricing

B.

Fixed price economic adjustment pricing

C.

Time and materials arrangement pricing

D.

Penetration contract pricing

Buy Now
Questions 13

A procurement professional is preparing a sale & purchase contract of a machinery. Which of the following clauses should be added to the contract? Select TWO that apply

Options:

A.

Supplier selection mechanism

B.

Insurance requirements

C.

Period of hire

D.

Ratio decidendi

E.

Guarantees

Buy Now
Questions 14

Which of the following are the conditions for revocation of offer to be valid?

1. The offeree has not received the offer yet

2. Revocation of offer must be communicated with the offeree

3. Revocation of offer must be sent via email

4. Offeree has not accepted the offer yet

Options:

A.

2 and 4 only

B.

1 and 4 only

C.

1 and 3 only

D.

2 and 3 only

Buy Now
Questions 15

Consequences and actions that arise from certain KPI scores must be...? Select TWO that apply.

Options:

A.

Mutually agreed

B.

Deliberately omitted

C.

Documented

D.

Unilaterally imposed by the purchaser

E.

Terminated

Buy Now
Questions 16

Which of the following is an invitation to treat?

Options:

A.

Purchase order

B.

Invoice

C.

Price list

D.

Tender bid

Buy Now
Questions 17

Which of the following are likely to be express terms in a contract?

1. Legislation

2. Custom and practice

3. Contract particulars

4. Terms and conditions

Options:

A.

2 and 3 only

B.

1 and 4 only

C.

3 and 4 only

D.

1 and 2 only

Buy Now
Questions 18

Northern Province Authority (NPA) seeks to use market dialogue to improve the contract specification for a new procurement tender of a domestic waste collection contract. Which of the following topics would be appropriate for dialogue with potential suppliers?

Options:

A.

Human resourcing

B.

Contract terms

C.

Pricing proposals

D.

Service innovation

Buy Now
Questions 19

Which of the following key performance indicators are most likely to use numerical data as the main source of information?

The critical evaluation of project deliverables

The subjective responses of a satisfaction survey regarding a service

The instances of late deliveries within a given month

The occurrence of accidents and near misses in a year

Options:

A.

1 and 3 only

B.

2 and 4 only

C.

3 and 4 only

D.

1 and 2 only

Buy Now
Questions 20

Which of the following is the best definition of “ultra vires”?

Options:

A.

Beyond powers

B.

In good faith

C.

From one party

D.

Let the buyer beware

Buy Now
Questions 21

A procurement manager is setting KPIs measurement for user satisfaction. He also wants to encourage users to share the reason why they feel the way they do. Which of the following types of KPI should the procurement manager apply?

Options:

A.

Quantitative measure

B.

Numerical measure

C.

Binary measure

D.

Qualitative assessment

Buy Now
Questions 22

Misrepresentation can be defined as a false statement of material fact made by one of the contracting parties which was intended to (and did) induce the other party to make the contract. What remedies are available in this instance to the innocent party?

Options:

A.

Contract is voidable and damages can be claimed

B.

Contract is not voidable but damages can still be claimed

C.

Contract is voidable and must be amended and performed

D.

Contract is not voidable and it is too late to take any action

Buy Now
Questions 23

Which of the following are the 'fundamental' labour standards laid down by the International Labour Organisation?

1. Elimination of child labour

2. Payment of a minimum wage

3. The right to collective bargaining

4. Abolition of forced labor

Options:

A.

1, 2 and 4 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 3 only

Buy Now
Questions 24

Which of the following would be useful tools to incentivise supplier innovation over the duration of the contract?

1. Gainshare arrangement

2. Liquidated damages

3. Service credits

4. Fixed bonus payments

Options:

A.

3 and 4 only

B.

2 and 4 only

C.

1 and 4 only

D.

1 and 3 only

Buy Now
Questions 25

ABC Ltd is a UK based company. It plans to enter into a contract with XYZ Ltd which is based in Singapore. Which of the following are the mandatory elements for the contract between ABC Ltd and XYZ Ltd to be legally binding? Select THREE that apply.

Options:

A.

All parties must have capacity to contract

B.

The two parties must have intention to be bound

C.

The invitation to tender must be sent by the agreed deadline

D.

There must be an offer and an acceptance

E.

An amount of money must be paid upfront

F.

There must be an invitation to treat

Buy Now
Questions 26

Which of the following is a true statement on express and implied terms?

Options:

A.

Express terms always take precedent over implied terms

B.

Implied terms may derive from oral negotiations

C.

Express terms must always be in writing

D.

Express terms must be prepared by the party with expert knowledge

Buy Now
Questions 27

Maximum Score 1

The Bravo Engineering Company is negotiating a maintenance contract with Express Deliveries Ltd. This large logistics company uses modern robotic storage and picking warehouse machinery to identify, sort, and facilitate over 200,000 orders each day. The volatile nature of the business means that the parties should build maximum flexibility into the performance management aspects of the contract.

Which of the following would be most appropriate to set out the parties’ obligations under the maintenance contract?

Options:

A.

A formal appendix to the maintenance contract

B.

A non-binding side-agreement to the maintenance contract

C.

A Service Level Agreement issued after the maintenance contract

D.

A clause that disclaims all accountability for the contract for the buyer

Buy Now
Questions 28

What are five essential elements of a legally binding contract?

Options:

A.

Offer, acceptance, compensation, ability, correct form

B.

Offer, agreement, consensus, capacity, correct form

C.

Offer, acceptance, consideration, capacity, correct form

D.

Offer, acceptance, mediation, capacity, contract

Buy Now
Questions 29

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT for designing, building and managing the new CRM system. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Cleveland brought the case to the court and sought rescission of contract with Digital. Is Cleveland’s claim appropriate in this case?

Options:

A.

Yes, because Cleveland needs to seek rescission first before claiming for damages

B.

Yes, because both parties agreed with rescission of their contract

C.

No, because the work had been carried out which could not be returned

D.

No, because the contract does not include any provision on rescission

Buy Now
Questions 30

XYZ Ltd is negotiating a long-term supply contract of important parts with a supplier. Dave, procurement manager teams up with Alla, legal manager to construct a service level agreement. Dave is concerned that poor performance of supplier may cause damages to the operations of the organisation. Which of the following can be used in conjunction with SLA to compensate the buying organisation in case of supplier's poor performance?

1. Warranties

2. Force majeure clauses

3. Penalty clauses

4. Service credits

Options:

A.

1 and 3 only

B.

3 and 4 only

C.

1 and 2 only

D.

4 and 2 only

Buy Now
Questions 31

Which of the following is the contract provision that relieves the parties from performing their contractual obligations when certain circumstances like natural disasters, terrorist attacks, etc arise?

Options:

A.

Indemnity clause

B.

Liquidated damage clause

C.

Insurance clause

D.

Exclusion clause

Buy Now
Questions 32

Which of the following are among five 'pillars' of information assurance?

1. Recovery plan

2. Availability

3. Non-repudiation

4. Governance

Options:

A.

2 and 3 only

B.

1 and 2 only

C.

1 and 4 only

D.

3 and 4 only

Buy Now
Questions 33

A company needs to source a product from oversea. It wants to overcome technical barrier to cross-border trade by using standards in the specification. Which of the following is most likely to be incorporated into that specification?

Options:

A.

National standards

B.

Company standards

C.

Brands

D.

International standards

Buy Now
Questions 34

Which of the following are express terms?

Sale by description

Fitness for purpose

Passing of risk

Passing of title

Options:

A.

1 and 2 only

B.

2 and 3 only

C.

2 and 4 only

D.

3 and 4 only

Buy Now
Questions 35

Bandpro is a reseller of branded computer products to the private and public sector. The procurement team must purchase 500 items each day solely by multiple phone calls and emails to suppliers. Due to this practice, it takes a lot of time to track and collect relevant documents.Some important documents even get lost, which makes procurement audit more burdensome. Which of the following would increase the robustness of audit trails in procurement activities?

Options:

A.

Every evidence must be recorded by paper

B.

Adopt e-procurement

C.

Spend less time on auditing procurement procedures

D.

Rectify non-compliant activities

Buy Now
Questions 36

Key performance indicators (KPIs) are used to measure supplier performance. Which of the following are KPIs that may be used? Select THREE that apply.

Options:

A.

Employee attendance

B.

Cost management

C.

Contract standardisation

D.

Quality conformance

E.

Timeliness of delivery

F.

Style of negotiation

Buy Now
Questions 37

Buyer D agrees a contract with Supplier C which includes the words 'to be agreed' in relation to the date for delivery of the goods. At the time of the contract, Buyer D is aware that the goods take two days to produce and one day to deliver. Buyer D contacts the supplier one week later, requesting the goods be delivered the following day. Supplier C is unable to deliver the next day but rather delivers the goods three days later. Is it the case that Buyer D can legally refuse to pay for the goods because Supplier C is in breach of contract?

Options:

A.

Yes, because the delivery date is an express term within the contract

B.

Yes, because the goods should have been delivered within three days

C.

No, because the goods were delivered within a reasonable time

D.

No, because there is a contract in place and the delivery date does not matter

Buy Now
Questions 38

The pricing arrangement in which markup is added into cost base to calculate the final price is known as...?

Options:

A.

Fixed Price approach

B.

Market based approach

C.

Price indices

D.

Cost plus pricing

Buy Now
Questions 39

A senior buyer is preparing specification for the next purchase. He intends to embed social and environmental criteria that align with his organisation's overarching strategy. Which of the following provides the social and environmental objectives that an organisation pursues?

Options:

A.

Economic performance

B.

Procurement Systems and Technology

C.

Economy of scale

D.

Organisation’s CSR policies

Buy Now
Questions 40

A buyer and a supplier plan to sign a contract with cost-plus arrangement. If the cost base is $350 and the markup component is 11% then the invoice price will be...

Options:

A.

393.26

B.

388.5

C.

368.5

D.

362

Buy Now
Questions 41

Maximum Score 1

Denny is putting together the final version of a contract to send out to a supplier. He places certain documentation into additional contract schedules at the end of the main contract.

Which of the following would be suitable inclusions to the additional schedules? Select TWO that apply.

Options:

A.

Financial statements

B.

Health and safety commitments

C.

Suppliers references

D.

Non-disclosure agreement

E.

A blank RFQ form

Buy Now
Questions 42

Which of the following could be the last document in a 'battle of the forms'?

Options:

A.

Quotation

B.

Order acknowledgement

C.

Purchase order

D.

Invitation to Tender (ITT)

Buy Now
Questions 43

Sally places a purchase order to the supplier for some components that her company requires. The supplier delivers the goods as she asks, but the quality assurance team finds that these components are defective and unfit for the company's operations. Which document is the ground to decide whether the goods received are fit for purpose?

Options:

A.

CSR policies

B.

Pre-qualification questionnaire

C.

Code of conduct

D.

Specification

Buy Now
Questions 44

Electro Systems PLC is a public sector manufacturer of highly technical solutions for the telecommunications industry. The market in which it operates is fast-paced and ever-changing because of the latest inventions and developments. The products it procures are high-cost and can be subject to lengthy lead times. Michael Jones, the procurement director, believes that establishing framework agreements would be beneficial to the tendering process. How could this assist them?

Options:

A.

Improve supplier lead times

B.

Enable the use of mini-competitions

C.

Improve supplier product quality

D.

Enable the use of e-tendering

Buy Now
Questions 45

Company A sends a purchase order complete with a set of conditions of contract for the provision of professional services to Company B. Company B responds with an invoice complete with a set of its own conditions of contract. Company A pays the invoice. Whichconditions of contract take legal precedence?

Options:

A.

Company A's

B.

Company B's

C.

Neither Company A's nor Company B's

D.

Both Company A's and Company B's

Buy Now
Questions 46

Which of the following sections would typically be included in a specification for services? Select THREE that apply.

Options:

A.

A description of the service requirements

B.

The tender evaluation methodology

C.

The fault rectification timeframes

D.

The service start and end dates

E.

The terms and conditions of the contract

F.

Questions relating to methods

Buy Now
Questions 47

Which of the following statement is true about insurance?

Options:

A.

An insurance policy can be mechanism of substance to back up indemnity

B.

The supplier must always pay the insurance premium for goods-in-transit

C.

An insurance policy transfers the legal liabilities from the insured to the insurer

D.

Professional indemnity insurance provides the insured business with financial protection against the liabilities caused by or arising out of the products supplied

Buy Now
Questions 48

Which of the following should be specially noticed in market dialogue with suppliers in specification development?

Options:

A.

Both parties must respect confidentiality

B.

The buying organisation must avoid social media at all cost

C.

Market dialogue is banned in the public sector

D.

Market dialogue should only be conducted with well-known supplier

Buy Now
Questions 49

A procurement manager is preparing a long-term contract with a major supplier. She decides to use the variable pricing arrangement using price indices. The payment terms describe the circumstances and mechanism where the price is allowed to change. In order to successfully manage this type of contract, the buying organisation should have...?

Options:

A.

Good market knowledge

B.

Selection of base year

C.

Value for money

D.

Economy of scale

Buy Now
Questions 50

Which of the following is an example of liquidated damages clause?

1. "In the event of a delay to the Offshore Installation Completion Date as per the Contract Schedule for which Contractor is solely responsible, Contractor shall pay to Company 0.25% per day of delay, subject to a maximum of 10% of the Initial Contract Price."

2. “If Seller breaches its obligation to deliver goods in accordance with the schedule provided for in this contract, Seller shall pay Buyer $x per day for each day of delay"

3. "The Contractor shall defend and hold the Buyer, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with the performance of this Agreement, except for injuries and damages caused by the sole negligence of the Buyer."

4. "The contract is subjected to delay remedies. The amount will be agreed by both parties during the delivery"

Options:

A.

2 and 4 only

B.

1 and 3 only

C.

3 and 4 only

D.

1 and 2 only

Buy Now
Questions 51

Which of the following statements is true about model form of contract?

Options:

A.

When model contracts are employed, there are no requirements for legal advice and input

B.

Model contract form's standard clauses often contain correct legal terminology without recourse to third party experts.

C.

The standard clauses of model contract forms give the offeror legal advantages over the offeree

D.

Only the publishers of model forms of contract can edit the clauses of these forms

Buy Now
Questions 52

Which of the following are implied terms in sales contracts? Select THREE that apply.

Options:

A.

Payment method

B.

Customer satisfaction

C.

Transfer of ownership

D.

Risk transfer

E.

Fitness for purpose

F.

Mode of transportation

Buy Now
Questions 53

A school has a contract for the supply of fruit for break time. The school needs the fruit delivered by 10am every morning to be served at 10:30am. How would this best be covered in a commercial agreement?

Options:

A.

Note on each purchase order

B.

Pricing schedule

C.

Sales of Goods Act 1974

D.

Contractual term

Buy Now
Questions 54

Which of the following might be considered as advantages, to the supplier, of key performance indicators (KPIs)? Select TWO that apply.

Options:

A.

They help the supplier to focus on specific critical success factors and maximise on effectiveness

B.

They help the supplier to achieve higher productivity by cutting down on other aspects like quality

C.

They help the supplier to avoid confusion arising from unclear expectation from buyers

D.

They help the supplier to share their best cost-saving systems with their competitors

E.

They help the supplier to ensure that they do not exceed the target performance levels

Buy Now
Questions 55

Which of the following are advantages of using a model form contract in negotiations between buyer and seller?

These contracts can save time in negotiations

Each contract is approved by the courts

These contracts are appropriate for all complexities

The contracts are well-known to both parties

Options:

A.

1 and 2

B.

2 and 3

C.

3 and 4

D.

1 and 4

Buy Now
Questions 56

In the UK, Unfair Contract Terms Act 1977 regulates which of the following?

Options:

A.

Validity of a contract when it is formed on the basis of misrepresentation

B.

Rules regarding battle of the forms

C.

Effectiveness of contract terms in the standard terms and conditions

D.

Rule of offer and acceptance

Buy Now
Questions 57

Which of the following are typically included in an SLA? Select TWO that apply:

Options:

A.

Requirements for packaging

B.

Service definition

C.

KPI detailsCorrect)

D.

Code of conduct

E.

Product's lifespan

Buy Now
Questions 58

When writing an implementation section for an IT requirements specification, which factors would be appropriate for inclusion? Select TWO that apply.

Options:

A.

Required response timeframes for service requests

B.

Mandatory training required for supplier’s staff

C.

Details of applicable legal and regulatory standards

D.

Integrations required with existing systems

E.

Lists of technical terms and abbreviations

Buy Now
Questions 59

Which of the following will be always automatically deemed as a consideration?

Options:

A.

Promise to perform over and above an existing obligation

B.

Promise given to a third party

C.

Implied consideration

D.

Past consideration

Buy Now
Questions 60

Streaming Ltd is a music streaming provider based in the UK. The company is looking for extending its presence in the US. To achieve this, the company needs to outsource the data centre service to a local company. To monitor the performance, the procurement manager would like to introduce a service level agreement (SLA) to the data centre service provider. Which of the following should be included in the SLA?

1. System availability

2. The mean time to recover from system failure

3. The actual number of on-time service delivery

4. Dispute resolution procedure

Options:

A.

1, 3 and 4 only

B.

1, 2 and 4 only

C.

1, 2 and 3 only

D.

2, 3 and 4 only

Buy Now
Questions 61

An example of a qualitative performance measure could be one that relates to opinions about the service quality of the supplier. Is this correct?

Options:

A.

Yes, this is often how satisfaction is measured

B.

No, this will relate to how much prices have increased by

C.

No, this type of measure will relate to the number of incomplete deliveries

D.

Yes, this will relate to the actual number of complaints received

Buy Now
Questions 62

Under English law's general legal principles of contract formation, which of the following are likely to be offers? Select TWO that apply.

Options:

A.

Invitation to tender

B.

Quotation

C.

Purchase order

D.

Advertisement

E.

Catalogue

Buy Now
Questions 63

You are to do the KPIs and targets for international supplier and the following was done

1. Delivery in an hour

2. Return orders in an hour

Is that a good thing or not?

Options:

A.

Yes, because these targets will propel the suppliers to continuous improvement

B.

No, the local suppliers are always the best choice

C.

No, because the KPIs are not a realistic and justified

D.

Yes, the higher the targets are, the better the outcomes will be

Buy Now
Questions 64

In order to monitor supplier’s performance, an organization decides to draft performance management frameworks. Which of the following are the components of a performance management framework? Select THREE that apply:

Options:

A.

Targets

B.

KPIs

C.

Consequences

D.

Indemnity

E.

Force majeure

F.

Justification

Buy Now
Questions 65

Which of the following are reasons why a purchaser wants to embed a subcontracting clause into the main contract? Select TWO that apply:

Options:

A.

To induce the conflicts between the main contractor and subcontractors

B.

To improve supply chain transparency

C.

To reduce the main contract complexity

D.

To keep main contractor liable

E.

To condemn whole liabilities to subcontractors

Buy Now
Questions 66

A construction company is undertaking a housing development project. They need lots of bricks and other building materials, but the construction site doesn't have large area for storage of materials.Therefore, the company's suppliers must deliver the building materials with fixed quantity and at fixed time intervals. What type of contract is used between the construction company and its suppliers?

Options:

A.

Framework agreement

B.

Spot transaction

C.

One off contract

D.

Call off contract

Buy Now
Questions 67

Which of the following best defines an ‘express’ term in general contract arrangements?

Options:

A.

It is a standard set of terms and conditions published by CIPS

B.

It is not necessarily discussed by the parties, but nonetheless forms part of the contract

C.

It is the term that is added to the contract by the law or based upon the facts of the case.

D.

It is clearly agreed between the parties, and is virtually always written down in the contract

Buy Now
Questions 68

A large company supplies a lot of products. Their shipments are often delayed and customers are not satisfied. Which of the following KPIs is most likely to be applied to this situation?

Options:

A.

Technical support

B.

OTIF delivery

C.

Delay damages

D.

Consignment stock availability

Buy Now
Questions 69

A buyer is in the process of supporting colleagues internally in the drafting of a specification for a new product. They have limited personal knowledge of the product and of the market. They are at the very early stages of drafting the specification and are seeking to increase their knowledge, whilst at the same time, keeping their likely future needs a commercial secret at this stage. Which of the following would be the best method of achieving this?

Options:

A.

Issue a formal request for information

B.

General networking at relevant trade events

C.

Interview staff from finance

D.

Advertising on a relevant online forum

Buy Now
Exam Code: L4M3
Exam Name: Commercial Contracting
Last Update: Nov 16, 2025
Questions: 233
L4M3 pdf

L4M3 PDF

$25.5  $84.99
L4M3 Engine

L4M3 Testing Engine

$30  $99.99
L4M3 PDF + Engine

L4M3 PDF + Testing Engine

$40.5  $134.99