Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

LEED-AP-ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Questions 4

To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

Options:

A.

10%

B.

20%

C.

30%

D.

50%

Buy Now
Questions 5

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

Options:

A.

Green Seal

B.

Manufacturer Inventory

C.

GreenScreen v1.2 Benchmark

D.

Chemical Abstract Service Registration Number (CASRN)

Buy Now
Questions 6

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Energy and Atmosphere Credit, Renewable Energy Production

C.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.

Materials and Resources Credit, Interiors life-cycle impact reduction

Buy Now
Questions 7

Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.

The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Buy Now
Questions 8

A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location. How many additional credit points are available to the project team under the Location and Transportation category?

Options:

A.

Zero additional points are available under the Location and Transportation category

B.

Two additional points are available only in Location and Transportation Reduced Parking Footprint

C.

Eight additional points are available under the Location and Transportation category

D.

18 additional points are available under the Location and Transportation category

Buy Now
Questions 9

A project team member has prepared a map and an accompanying table as documentation for Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses. The map includes the location of each use, the location of the project, and the main entrance of the building. The table includes the distance to each use, the name of each use, and the category of each use. The team lead reviews the documentation and notes an important missing item. Which of the following s the most important item to add to the documentation?

Options:

A.

A description of each use

B.

The location of parking lots near each use

C.

Walking routes from the project to each use

D.

A calculation of the expected number of project occupants who will visit each use

Buy Now
Questions 10

What strategy contributes to achievement of Materials and Resources Credit, Construction and Demolition Waste Management?

Options:

A.

Reuse existing plumbing fixtures

B.

Use on-site soil to re-grade garden

C.

Reuse furniture from the existing space

D.

Return removed carpet to the manufacturer

Buy Now
Questions 11

In a goal-setting workshop, a project team identifies that teleworking could reduce building area and therefore the required plug loads. What is a requirement for the documentation of the energy-related systems of the Integrative Process worksheet?

Options:

A.

Providing a narrative of one plug load reduction

B.

Providing calculations of only the plug load reduction

C.

Providing explanations of at least two plug load reduction strategies

D.

Providing detailed comparative energy model before completing schematic design to evaluate energy load reduction strategies

Buy Now
Questions 12

Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?

Options:

A.

Base-building chiller specifications

B.

CFC-free refrigerants in tenant cooling units

C.

Temperature monitoring of building cooling water

D.

ENERGY STAR® compliant cooling units with low CFCs

Buy Now
Questions 13

Which prerequisite and/or credits can be achieved by providing individual controls for lighting?

Options:

A.

Energy and Atmosphere Credit, Energy Use and Indoor Environmental Quality Credit, Interior Lighting

B.

Energy and Atmosphere Credit, Enhanced Commissioning and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

D.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

Buy Now
Questions 14

The site of a new open-plan office building is located near a highway. The acoustic consultant is investigating the possibility of using sound masking system to cover the noise impact from the busy road. If sound masking is found to be a feasible option, the noise design of the project can have a maximum limit up to

Options:

A.

36 dBA

B.

48 dBA

C.

62 dBA

D.

70 dBA

Buy Now
Questions 15

What must a project team inventory to determine if a project has enough reused surfaces to document Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.

Demolition waste

B.

Plumbing fixtures

C.

Salvaged furniture

D.

Existing building conditions

Buy Now
Questions 16

In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?

Options:

A.

Waste stream, total waste, diverted waste, waste to landfill

B.

Waste volume, commingled waste, wood for energy, reused items

C.

Donated waste, landfill waste, percentage of cardboard with recycled content, diverted waste

D.

Percentage of alternative daily cover (ADC) produced by the sorting facility, total of donated items, total of wood recycled, total of wood reused

Buy Now
Questions 17

Which of the following can be considered pre-consumer recycled content?

Options:

A.

Aluminum cans used to make sheet metal

B.

Plastic bottles that are used to create upholstery fabric

C.

Sawdust from a lumber mill used to make composite board

D.

Glass manufacturing scraps (culls) that are used to create new glass

Buy Now
Questions 18

Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?

Options:

A.

Thermal comfort ranges, plug and process load needs

B.

Programmatic and operational parameters, and building schedule

C.

Transportation, building features, lighting levels and building envelope attributes

D.

Occupant's well-being, building site attributes, transportation and building features

Buy Now
Questions 19

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

Options:

A.

10%

B.

15%

C.

20%

D.

25%

Buy Now
Questions 20

A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

Options:

A.

A car sharing program

B.

60 bike racks and seven shower/changing rooms

C.

Electric car charging stations in the parking garage

D.

A bus line with 30 daily rides with a bus stop within 1/2 mi. (0.80 km) of the building entrance

Buy Now
Questions 21

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Buy Now
Questions 22

Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable area. The project build-out will include all new HVAC systems. Operable windows are installed as follows:

· A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces

. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces

Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

Tabulate the total area of operable windows to indicate compliance. No mechanical outside air systems required for space HVAC design

B.

Provide MERV 13 (F7) filters on the new HVAC system air handling units. No mechanical outside air systems

required for space HVAC design

C.

Provide new mechanical outside air systems in compliance with ASHRAE 62.1-2010 and document

compliance by tabulating rates in compliance with the standard

D.

Install 25 ft2 (2.3 m2) of new operable windows within 25 ft. (7.6 m) of all spaces and tabulate the total area of operable windows to indicate compliance

Buy Now
Questions 23

Using the scale of 0 = no view and 5 = maximum view, what is the view factor in the diagram below, as defined in Indoor Environmental Quality Credit, Quality Views?

Options:

A.

View Factor 1

B.

View Factor 2

C.

View Factor 4

D.

View Factor 5

Buy Now
Questions 24

Which sentence is true about Renewable Energy Certificates (RECs)?

Options:

A.

RECs can be used to mitigate the effects of all scope two emissions.

B.

RECs can be used toward both electric and nonelectric energy use.

C.

RECs can be used to mitigate emissions from purchased electricity.

D.

RECs can be used to mitigate emissions from electricity produced on site.

Buy Now
Questions 25

Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

Options:

A.

75% Rainforest Alliance Certified flooring with a total cost of $3,000 USD

B.

10% Rainforest Alliance Certified furniture with a total cost of $30,000 USD

C.

50% Rainforest Alliance Certified wood veneer with a total cost of $5,000 USD

D.

100% Rainforest Alliance Certified wheatboard with a total cost of $2,000 USD

Buy Now
Questions 26

When developing the overall energy strategy of the project, which credit should the client consider to work synergistically with the Energy and Atmosphere Credit, Enhanced Commissioning, on an ongoing basis?

Options:

A.

Advanced Energy Metering

B.

Renewable Energy Production

C.

Green Power and Carbon Offsets

D.

Enhanced Refrigerant Management

Buy Now
Questions 27

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Buy Now
Questions 28

A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?

Options:

A.

Indoor Environmental Quality Credit, Acoustic Performance

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Optimize Energy Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Buy Now
Questions 29

A mechanical engineer needs to identify spaces that are considered densely occupied according to LEED in order to document

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting, Option 2

B.

Indoor Environmental Quality Credit, Thermal Comfort, Control Requirements

C.

Indoor Environmental Quality Credit, Indoor Air Quality Assessment, Option 2. Air Testing

D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2 C. Carbon Dioxide Monitoring

Buy Now
Questions 30

A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if

Options:

A.

the project boundary includes 75% of the construction scope and is drawn at a clear, physical barrier

B.

the project boundary includes 100% of the construction scope and is drawn at a clear, physical barrier

C.

the project boundary excludes no more than 40% of the construction scope and is drawn at a clear, physical barrier

D.

the project boundary excludes no more than 60% of the construction scope and is drawn at a clear, physical barrier

Buy Now
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: May 8, 2024
Questions: 100
LEED-AP-ID+C pdf

LEED-AP-ID+C PDF

$28  $80
LEED-AP-ID+C Engine

LEED-AP-ID+C Testing Engine

$33.25  $95
LEED-AP-ID+C PDF + Engine

LEED-AP-ID+C PDF + Testing Engine

$45.5  $130