PSM-I Professional Scrum Master I Questions and Answers

Questions 4

(What are two effective ways for a Scrum Team to ensure security concerns are satisfied?

Choose the best two answers.)

Options:

A.

Delegate the work to the security department.

B.

Have the Scrum Team create Product Backlog items for each concern.

C.

Add security concerns to the Definition of Done.

D.

Postpone the work until a specialist can perform a security audit and create a list of security-related Product Backlog items.

E.

Add a Sprint to specifically resolve all security concerns.

Buy Now
Questions 5

Who determines how work is performed during the Sprint?

Options:

A.

Architects.

B.

The Development Team.

C.

The Scrum Master.

D.

Subject matter experts.

E.

Development Team managers.

Buy Now
Questions 6

Marian is the Product Owner envisioning a project for a new release of her product. She made a projection of a release date based upon a sustained velocity of 17 completed units of work per Sprint. Over the first 3 Sprints, the average velocity was 13 for work that the Development Team estimated as 90% done. The Development Teams, feeling the need to meet the plan, figured that a velocity of 17 was within their reach.

A good way to continue is:

Options:

A.

The Development Team makes sure that all of the selected scope per Sprint is as “Done” as possible. The undone work is estimated and added to the Sprint Backlog of the next Sprint, so it doesn’t mess up the Product Backlog.

B.

Add enough people to the Development Team for the deadline to be made.

C.

The opportunity to inspect and adapt is lost. Opaqueness has replaced transparency. Predictability has dropped below zero. The produced software is not usable. As the rules of Scrum have not been respected, it is the Scrum Master’s duty to assess whether repair is possible, or a restart with a more reliable team. If not, the Scrum Master should cancel the project.

D.

The Development Team should remind Marian to find funding for enough Release Sprints in which the remaining work can be done.

Buy Now
Questions 7

During a Sprint Retrospective, the Development Team proposes moving the Daily Scrum to only occur on Tuesdays and Thursdays. Which two are the most appropriate responses for the Scrum Master? (Choose two.)

Options:

A.

Consider the request and decide on which days the Daily Scrum should occur.

B.

Coach the team on why the Daily Scrum is important as an opportunity to update the plan.

C.

Have the developers vote.

D.

Learn why the Development Team wants this and work with them to improve the outcome of the Daily Scrum.

E.

Acknowledge and support the self-organizing team’s decision.

Buy Now
Questions 8

Which three purposes does the definition of “Done” serve? (Choose three.)

Options:

A.

Guide the Development Team on how many Product Backlog items to select for the Sprint.

B.

Create a shared understanding of when work is complete.

C.

Describe the purpose, objecti ve, and time-box of each Scrum event.

D.

Describe the work that must be done before the Sprint is allowed to end.

E.

Increase transparency.

Buy Now
Questions 9

Which two things should the Scrum Team do during the first Sprint?

(choose the best two answers)

Options:

A.

Define the major product features and a release plan architecture.

B.

Build at least one piece of valuable functionality.

C.

Create at least one valuable, useful Increment

D.

Make up a plan tor the rest of the project

E.

Analyze, describe, and document the requirements for the subsequent Sprints.

Buy Now
Questions 10

A Development Team selects a set of Product Backlog items for a Sprint Backlog with the intent to get the selected items “Done” by the end of the Sprint. Which three phrases best describe the purpose of a definition of “Done”? (Choose three.)

Options:

A.

It controls whether the developers have performed their tasks.

B.

It provides a template for elements that need to be included in the technical documentation.

C.

It creates transparency over the work inspected at the Sprint Review.

D.

It trucks the percent completeness of a Product Backlog item.

E.

It guides the Development Team is creating a forecast at the Sprint Planning.

F.

It defines what it takes for an Increment to be ready for release.

Buy Now
Questions 11

Which of the following best describes an increment of working software?

Options:

A.

A decomposition of all Product Backlog items into tasks for future Sprint Backlog lists.

B.

Additional features in a usable state that complement those delivered in previous iterations.

C.

A new user interface design for functionality delivered in previous iterations.

D.

An automated test suite to verify functionality delivered in previous iterations.

E.

UML diagrams that describe how to deliver functionality in future iterations.

Buy Now
Questions 12

Which of the following is an example of an Increment? (Choose the best answer.)

Options:

A.

A plan for the overall product release.

B.

A mock-up of the product marketing materials.

C.

A design for the product.

D.

A product roll-out plan.

E.

A valuable, useful set of products featured.

F.

All of the above.

Buy Now
Questions 13

What are two ways that architecture and infrastructure are handled in Scrum? (Choose two.)

Options:

A.

They are discussed, determined, and documented before the actual feature development Sprints.

B.

They are implemented along with functional development of the product.

C.

They are added to the Product Backlog and addressed in early Sprints, while always requiring at least some business functionality, no matter how small.

D.

They are built by a separate team through the creation of an architectural runway.

Buy Now
Questions 14

(A new Developer is having continuing conflicts with existing members of the Scrum Team, which is impacting the delivery of the Increment. If necessary, who is responsible for removing the Developer from the Scrum Team?

Choose the best answer.)

Options:

A.

The Scrum Master is responsible, they remove impediments.

B.

The Product Owner is responsible, they control the return on investment (ROI).

C.

The hiring manager is responsible, they hired the Developer.

D.

The Scrum Team is responsible.

Buy Now
Questions 15

Cross-functional teams are optimized to work on one technical layer of a system only (e.g. GUI, database, middle tier, interfaces).

Options:

A.

True

B.

False

Buy Now
Questions 16

True or False: The purpose of a Sprint Is lo produce a valuable useful Inclement.

Options:

A.

True

B.

False

Buy Now
Questions 17

Which of these may a Development Team deliver at the end of a Sprint?

Options:

A.

Failing unit tests, to identify acceptance tests for the next Sprint.

B.

An increment of software with minor known bugs in it.

C.

An increment of working software that is “done”.

D.

A single document, if that is what the Scrum Master asked for.

Buy Now
Questions 18

True or False: Multiple scrum Teams working on the same product must have the same Sprint start date.

Options:

A.

True

B.

False

Buy Now
Questions 19

What is a Development Team responsible for? (Choose two.)

Options:

A.

Resolving internal team conflicts.

B.

Reporting productivity.

C.

Selecting the Product Owner.

D.

Organizing the work required to meet the Sprint Goal.

Buy Now
Questions 20

The Product Owner determines how many Product Backlog items the Development Team selects for a Sprint.

Options:

A.

False.

B.

True, accordingly to what was committed to the stakeholders.

C.

True, but only after confirmation by the resource manager that the Team has enough capacity.

D.

True.

E.

False, the Scrum Master does that.

F.

False, capacity and commitment are the Project manager’s responsibility.

Buy Now
Questions 21

True or False: An increment must be released to customers or users at the end of each sprint.

Options:

A.

True

B.

False

Buy Now
Questions 22

(Why do the Developers need a Sprint Goal?

Choose the best answer.)

Options:

A.

A Sprint Goal only gives purpose to Sprint 0.

B.

Sprint Goals are not valuable. Everything is known from the Product Backlog.

C.

A Sprint Goal ensures that all of the Product Backlog items selected for the Sprint are implemented.

D.

The Developers are more focused with a common yet specific goal.

Buy Now
Questions 23

Which two things should the Development Team do during the first Sprint? (Choose two.)

Options:

A.

Make up a plan for the rest of the project.

B.

Analyze, describe, and document the requirements for the subsequent Sprints.

C.

Develop at least one piece of functionality.

D.

Analyze, design, and describe the complete architecture and infrastructure.

E.

Create an increment of potentially releasable software.

Buy Now
Questions 24

How should a Scrum Team deal with non-functional requirements?

(choose the best answer)

Options:

A.

Manage them during the Integration Sprint prior to the Release Sprint.

B.

Assign them to the lead developers on the team.

C.

Ensure every Increment meets them.

D.

Make sure the release department understands these requirements, but it is not the

Scrum Team ' s responsibility.

Buy Now
Questions 25

What enhances the transparency of an increment?

Options:

A.

Doing all work needed to meet the definition of “Done”

B.

Reporting Sprint progress to the stakeholders daily

C.

Keeping track of and estimating all undone work to be completed in a separate Sprint.

D.

Updating Sprint tasks properly in the electronic tracking tool.

Buy Now
Questions 26

Who should know the most about the progress toward a business objective or a release?

Options:

A.

The Project Manager.

B.

The Scrum Master.

C.

The Development Team.

D.

The Product Owner.

Buy Now
Questions 27

Which three questions might be answered by Development Team members at the Daily Scrum? (Choose three.)

Options:

A.

How is the Sprint proceeding?

B.

What did I do yesterday that helped the Development Team meet the Sprint Goal?

C.

Why were you late?

D.

What will I do today to help the Development Team meet the Sprint Goal?

E.

How many hours did I spend on the project yesterday?

F.

What will I be working on tomorrow?

G.

Do I see any impediment that prevents me or the Development Team from meeting the Sprint Goal?

Buy Now
Questions 28

Who is responsible for managing the progress of work during a Sprint?

Options:

A.

The Scrum Master.

B.

The Development Team.

C.

The Product Owner.

D.

The most junior member of the Team.

Buy Now
Questions 29

The Product Owner must release each Increment to production.

Options:

A.

When it makes sense.

B.

To make sure the Development Team is done every Sprint.

C.

Whenever the product is free of defects.

D.

Without exception.

Buy Now
Questions 30

Which does a self-organizing Development Team choose?

Options:

A.

Sprint length.

B.

How to best accomplish its work.

C.

Stakeholders for the Sprint Review.

D.

When to release, based on its progress.

E.

Product Backlog ordering.

Buy Now
Questions 31

Which of the following is required by Scrum? (Choose all that apply.)

Options:

A.

Sprint Retrospective.

B.

Members must be stand up at the Daily Scrum.

C.

Sprint Burndown Chart.

D.

Release planning.

E.

All of the above.

Buy Now
Questions 32

In accordance with Scrum theory, how should a group of 100 people be divided into multiple Development Teams?

Options:

A.

Understanding the product, the product vision and the rules of the Scrum framework, the group divides itself into teams.

B.

It doesn’t really matter because you can rotate the teams every Sprint to spread knowledge.

C.

Check with the allocation department to see who has worked together before and make these the first teams.

D.

Create a matrix of skills, seniority, and level of experience to assign people to teams.

Buy Now
Questions 33

Which outcome is expected as Scrum Teams mature?

Options:

A.

They will improve their definition of “Done” to include more stringent criteria.

B.

The Sprint Retrospectives will grow to be longer than 4 hours.

C.

There is no need for a time-boxed Sprint, since time-boxes are only for new Scrum Teams.

D.

Sprint Reviews will no longer be needed.

E.

A Scrum Master is no longer needed since they are a mature team now.

Buy Now
Questions 34

When is a Sprint over?

Options:

A.

When the Product Owner says it is done.

B.

When all Product Backlog items meet their definition of “Done”.

C.

When all the tasks are completed.

D.

When the time-box expires.

Buy Now
Questions 35

When should a Sprint Goal be created?

Options:

A.

It should have been created in the previous Sprint during Product Backlog refinement.

B.

It must be established before Sprint Planning in order to begin planning.

C.

A Sprint Goal is not mandatory in Scrum.

D.

At any time during the Sprint.

E.

During Sprint Planning.

Buy Now
Questions 36

What are three benefits of self-organization? (Choose three.)

Options:

A.

Increased creativity.

B.

Increased rule compliance.

C.

Increased accuracy of estimates.

D.

Increased self-accountability

E.

Increased commitment.

Buy Now
Questions 37

During the Sprint. Me Scrum Master ' s role is to do which two of the following: (choose the best two answers)

Options:

A.

Facilitate inspection and adaptation opportunities as requested or needed

B.

Coaching the team members in self-management

C.

Ensure the Product Owner attends all scrum events.

D.

Escalate team conflicts to functional line managers

E.

Monitor the progress of the Developers

F.

Assign tasks with the Scrum team.

Buy Now
Questions 38

Which of the following are true about the Product Owner role? (Choose two.)

Options:

A.

The Product Owner is one person.

B.

The Product Owner is accountable for ordering the Product Backlog.

C.

Multiple people can share the Product Owner role on a Scrum Team.

D.

The Product Owner role can be played by a committee or a team of people.

Buy Now
Questions 39

During a Sprint, when is new work or further decomposition of work added to the Sprint Backlog?

Options:

A.

When the Product Owner identifies new work.

B.

As soon as possible after they are identified.

C.

When the Scrum Master has time to enter them.

D.

During the Daily Scrum after the Development Team approves them.

Buy Now
Questions 40

A Scrum Team is experiencing a growing list of impediments. Which techniques would be most

helpful in this situation?

(choose the best two answers)

Options:

A.

As a Scrum Team, prioritize the list and work on them in order.

B.

The Scrum Master discusses the impediments with the Scrum Team.

C.

The Product Owner should add the open impediments to the Product Backlog.

D.

Arrange a triage meeting with management.

Buy Now
Questions 41

(You have just been hired by a company new to Scrum. Management has assigned you to be the Scrum Master of six new Scrum Teams. These teams will build one product. Select two conditions you should strive for in this scenario.

Choose the best two answers.)

Options:

A.

There should be only one Product Owner.

B.

The product has one Product Backlog.

C.

Each Scrum Team should have a separate Product Backlog.

D.

There should be six Product Owners, reporting to a Chief Product Owner.

E.

There should be six Product Owners, one for each Scrum Team.

Buy Now
Questions 42

What are the two primary ways a Scrum Master keeps a Development Team working at its highest level of productivity? (Choose two.)

Options:

A.

By ensuring the meetings start and end at the proper time.

B.

By removing impediments that hinder the Development Team.

C.

By facilitating Development Team decisions.

D.

By keeping high value features high in the Product Backlog.

Buy Now
Questions 43

How should a Development Team deal with non-functional requirements?

Options:

A.

Ensure every Increment meets them.

B.

Make sure the release department understands these requirements, but it is not the Development Team’s responsibility.

C.

Handle them during the Integration Sprint preceding the Release Sprint.

D.

Assign them to the lead developers on the team.

Buy Now
Questions 44

Which Scrum Value is affected by a lack of trust in the Scrum Team?

Options:

A.

Focus

B.

Respect

C.

Openness

D.

Courage

E.

Commitment.

F.

All of the above

Buy Now
Questions 45

Who is responsible for clearly expressing Product Backlog items?

Options:

A.

The Scrum Master, or the Scrum Master may have the Development Team do it.

B.

The Scrum Master.

C.

The Product Owner.

D.

The business analyst who represents the Product Owner in the Development Team.

Buy Now
Questions 46

Which of the following services are appropriate for a Scrum Master in regard to the Daily Scrum?

Options:

A.

Lead the discussions of the Development Team.

B.

Make sure that all 3 questions have been answered by each member of the team.

C.

Keep track of whether each team member has a chance to speak.

D.

Teach the Development Team to keep the Daily Scrum within the 15 minute time-box.

E.

All of the above.

Buy Now
Questions 47

What are three ways Scrum promotes self-organization? (Choose three.)

Options:

A.

By not allowing documentation.

B.

By the Development Team deciding what work to do in a Sprint.

C.

By preventing stakeholders from entering the development room.

D.

By removing titles for Development Team members.

E.

By being a lightweight framework.

Buy Now
Questions 48

During Sprint Planning the Product Owner and the Developers are unable to reach an

understanding about the highest order Product Backlog items. Because of this, the Developers

are unable to determine how many Product Backlog items they can forecast for the upcoming

Sprint However, the Product Owner and the Developers are able to agree on a Sprint Goal.

Which of the following actions should the Scrum Master support?

(choose the best two answers)

Options:

A.

Cancel the Sprint Send the entire team to an advanced Scrum training and then

start a new Sprint

B.

During the next Sprint Retrospective discuss why this happened and what

changes will make it less likely to recur.

C.

Continue the Sprint Planning event past its timebox until an adequate number ot

Product Backlog items are well enough understood for the Developers to make a

complete forecast Then start the Sprint

D.

Forecast the Product Backlog items that are most likely to meet the Sprint Goal

and create the Sprint Backlog. Conclude Sprint Planning and start the

development work. Continue to analyze, decompose, and create additional

functionality during the Sprint

E.

Ask everyone to take as much time as needed to analyze the Product Backlog

first, and then reconvene another Sprint Planning meeting.

Buy Now
Questions 49

What two techniques could the Scrum Master use when the Scrum Team gets caught in an internal disagreement about which development techniques to apply? (Choose two.)

Options:

A.

Involve the complete Development Team.

B.

Use coaching techniques; such as open questions and active listening.

C.

Ask an external technical specialist to make the decision.

D.

Send every team member to the company’s HR department to express their concerns.

Buy Now
Questions 50

During a Sprint Retrospective, for what is the Product Owner responsible?

Options:

A.

Participating as a Scrum Team member.

B.

Summarizing and reporting the discussions to the stakeholders that he/she represents in the Scrum Team.

C.

Capturing requirements for the Product Backlog.

D.

The Product Owner should not take part in Sprint Retrospectives.

Buy Now
Questions 51

(Who must attend the Daily Scrum?

Choose the best answer.)

Options:

A.

The Scrum Master and Product Owner.

B.

The Developers and Scrum Master.

C.

The Developers.

D.

The Developers and Product Owner.

E.

The Scrum Team.

Buy Now
Questions 52

Which best describes the Product Backlog?

Options:

A.

It is allowed to grow and change as more is learned about the product and its customers.

B.

It provides just enough information to enable a Scrum team to start the design phase of a product.

C.

It contains all foreseeable tasks and requirements from which the Scrum team can develop and maintain a complete project plan.

D.

It is baselined to follow change management processes.

Buy Now
Questions 53

(What are the two primary ways a Scrum Master helps a Scrum Team work at its highest level of productivity?

Choose the best two answers.)

Options:

A.

By keeping high-value features high in the Product Backlog.

B.

By facilitating Scrum Team decisions.

C.

By ensuring the meetings start and end at the proper time.

D.

By removing impediments that hinder the Scrum Team.

Buy Now
Questions 54

A Product Owner wants advice from the Scrum Master about estimating work in Scrum. Which of these is the guideline that a Scrum Master should give? (Choose the best answer.)

Options:

A.

Product Backlog items must be estimated in story points.

B.

Estimates are made by the people doing the work.

C.

Estimates must be in relative units.

D.

Scrum forbids estimating.

E.

Estimates are made by the Product Owner, but are best checked with the Development Team.

Buy Now
Questions 55

Who determines how many Product Backlog items the Developers select tor a sprint? (choose the best answer)

Options:

A.

The Scrum Master

B.

The Scrum Team

C.

The Developers

D.

The stakeholders attending Sprint Planning

E.

The Product Owner

Buy Now
Questions 56

A properly functioning Scrum Team will have at least one Release Sprint and may well have several.

Options:

A.

True

B.

False

Buy Now
Questions 57

In order to achieve the benefits of Scrum, it is important to enact the value of commitment. What two actions demonstrate the commitment of Scrum Team members? (Choose two.)

Options:

A.

Always deliver the items in the Sprint forecast.

B.

Help the other Scrum Team members.

C.

Do your best

D.

Send out a daily status report.

E.

Work late.

Buy Now
Questions 58

When a Development Team is having trouble delivering a working Increment because they don’t understand a functional requirement, what should they do?

Options:

A.

Add a specialist to the Development Team.

B.

Partially complete the functionality, and discuss the remaining work at the Sprint Review.

C.

Collaborate with the Product Owner to determine what is possible and acceptable.

D.

Defer the work to a more appropriate Sprint.

Buy Now
Questions 59

(True or False: Cross-functional teams are optimized to work on one component or layer of a system only.)

Options:

A.

True

B.

False

Buy Now
Questions 60

What activities would a Product Owner typically undertake in the phase between the end of the current Sprint and the start of the next Sprint?

Options:

A.

There are no such activities. The next Sprint starts immediately after the current Sprint.

B.

Refine the Product Backlog.

C.

Work with the Quality Assurance departments on the Increment of the current Sprint.

D.

Update the project plan with stakeholders.

Buy Now
Questions 61

If burndown charts are used to visualize progress, what does a trend line through a release burndown chart indicate?

Options:

A.

The evolution of the cost spent on the project.

B.

When all work will be completed to the Scrum Team can be released for other work.

C.

When the work remaining will likely be completed if nothing changes on the Product Backlog or the Development Team.

D.

When the project will be over if the Product Owner removes work that is equal in effort to any new work that is added.

Buy Now
Questions 62

In the Sprint Planning meeting, the Product Owner and the Development Team were unable to reach a clear understanding about the highest order Product Backlog items. Because of this, the Development Team couldn’t figure out how many Product Backlog items it could forecast for the upcoming Sprint. They were able to agree on a Sprint Goal, however.

Which of the following two actions should the Scrum Master support? (Choose two.)

Options:

A.

Cancel the Sprint. Send the entire team to an advanced Scrum training and then start a new Sprint.

B.

Forecast the most likely Product Backlog items to meet the goal and create a Sprint Backlog based on a likely initial design and plan. Once the time-box for the Sprint Planning meeting is over, start the Sprint and continue to analyze, decompose, and create additional functionality during the Sprint.

C.

Continue the Sprint Planning meeting past its time-box until an adequate number of Product Backlog items are well enough understood for the Development Team to make a complete forecast. Then start the Sprint.

D.

Discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.

E.

Ask everyone to take as much time as needed to analyze the Product Backlog first, and then reconvene another Sprint Planning meeting.

Buy Now
Questions 63

What is the timebox for a Sprint Planning event? (choose the best answer)

Options:

A.

Monthly.

B.

8 hours for a one-month Sprint

C.

Whenever ills done

D.

4 hours for a one-month Sprint

Buy Now
Questions 64

Which are characteristics of the Daily Scrum?

(choose the best two answers)

Options:

A.

Its location and time remain constant

B.

Its purpose is to inspect progress toward the Sprint Goal and adapt the Sprint

Backlog.

C.

It is tree form and designed to promote conversatiom

D.

It is facilitated by the team lead.

E.

It is held first thing in the morning.

F.

It consists of the Scrum Master asking the team tor status.

Buy Now
Questions 65

When is it most appropriate for a Scrum Team to change the Definition of Done?

(choose the best answer)

Options:

A.

During Product Backlog refinement.

B.

During the Sprint Retrospective.

C.

During Sprint Planning.

D.

Prior to starting a new project.

Buy Now
Questions 66

What does it mean to say that an event has a time-box?

Options:

A.

The event must happen at a set time.

B.

The event must happen by a given time.

C.

The event must take at least a minimum amount of time.

D.

The event can take no more than a maximum amount of time.

Buy Now
Questions 67

The IT manager asks a Development Team for a status report describing the progress throughout the Sprint.

The Development Team asks the Scrum Master for advice. The Scrum Master should:

(Choose the best answer.)

Options:

A.

Talk to the IT manager and explain that progress in Scrum comes from inspecting an Increment at the Sprint Review.

B.

Tell the Development Team to figure it out themselves.

C.

Tell the Development Team to fit the report into the Sprint Backlog.

D.

Create and deliver the report to the manager herself.

E.

Ask the Product Owner to send the manager the report.

Buy Now
Questions 68

(The Definition of Done serves which three purposes?

Choose the best three answers.)

Options:

A.

Guide the Developers on how many Product Backlog items to select for the Sprint.

B.

Describe the work that must be mostly done before the Sprint is allowed to end.

C.

Increase transparency.

D.

Describe the purpose, objective, and timebox of each Scrum event.

E.

Create a shared understanding of when work is complete.

Buy Now
Questions 69

When do Development Team members take ownership of a Sprint Backlog item?

Options:

A.

At the Sprint planning meeting.

B.

During the Daily Scrum.

C.

Never. All Sprint Backlog Items are “owned” by the entire Development Team, even though each one may be done by an individual Development Team member.

D.

Whenever a team member can accommodate more work.

Buy Now
Questions 70

Which are appropriate topics for discussion in a Sprint Retrospective? (Choose the best three answers.)

Options:

A.

Arranging the Sprint Backlog for the next Sprint.

B.

The value of work currently represented in the Product Backlog.

C.

Team relations

D.

Definition of Done.

E.

How the Scrum Team does its work.

Buy Now
Questions 71

Who starts the Daily Scrum?

Options:

A.

The person coming in last. This encourages people to be on time and helps to stay within the time-box.

B.

Whoever the Development Team decides should start.

C.

The person who has the token.

D.

The Scrum Master. This ensures that the Development Team has the meeting and stays within the time-box.

E.

The person who last broke the build.

Buy Now
Questions 72

A Sprint Retrospective should be held:

Options:

A.

At the end of each Sprint.

B.

At the beginning of each Sprint.

C.

Only when the Scrum Team determines it needs one.

D.

At the end of the last Sprint in a project or a release.

Buy Now
Questions 73

Which of the following is a Developer accountable for? (Choose the best two answers.)

Options:

A.

Selecting the Product Owner.

B.

Reporting productivity.

C.

Creating a plan for the Sprint, the Sprint Backlog.

D.

Organizing the work required to meet the Sprint Goal.

Buy Now
Questions 74

When is a Product Backlog item considered complete? (choose the best answer)

Options:

A.

When the item passes ail acceptance criteria

B.

When the item has gamed product sponsor approval

C.

At the end of the Sprint

D.

When the item meets the Definition of Done

Buy Now
Questions 75

A new Developer is having continuing conflicts with existing members or the scrum Team, which is impacting the delivery of the Increment It necessary, who is responsible for removing the Developer from the Scrum Team?

(choose the best answer)

Options:

A.

The Scrum Master is responsible, they remove impediments

B.

The Product Owner is responsible, they control the return on investment (ROI)

C.

The hiring manager is responsible, they hired the Developer

D.

The Scrum Team is responsible

Buy Now
Questions 76

Which of the following is an accountability of a Tester on a Scrum Team?

(choose the best answer)

Options:

A.

Executing tests, finding defects, and reporting them to the Developers.

B.

Refreshing and communicating the Definition of Done to the Product Owner.

C.

Scrum has no Tester accountability. The Developers are accountable for quality.

D.

Verifying the work of the Developers.

E.

Tracking defect rates to ensure they improve each Sprint.

Buy Now
Questions 77

When multiple Scrum Teams are working on a single product, what best describes the Definition of Done?

(choose the best answer)

Options:

A.

Each Scrum Team uses its own, but must make their definition clear to all other teams so the differences are known.

B.

The Scrum Masters from each Scrum Team define a common Definition of Done.

C.

When multiple Scrum Teams are working together on a product, they must mutually define and comply with the same Definition Of Done.

D.

Each Scrum Team defines and uses its own. The differences are discussed and reconciled during a hardening Sprint.

Buy Now
Questions 78

What are two good ways for a Scrum Team to ensure security concerns are satisfied? (Choose two.)

Options:

A.

Postpone the work until a specialist can perform a security audit and create a list of security-related Product Backlog items.

B.

Add security concerns to the definition of “Done”.

C.

Add a Sprint to specifically resolve all security concerns.

D.

Delegate the work to the concerned department.

E.

Have the Scrum Team create Product Backlog items for each concern.

Buy Now
Questions 79

User documentation is part of your definition of “Done”. However, there aren ' t enough technical writers for all teams. Your Development Team doesn ' t have a technical writer. What should you do?

Options:

A.

Form a separate team of technical writers that will work on an on-demand basis for the various Product Owners. Work order will be first in, first out.

B.

Let the user documentation remain undone and accumulate until after the last development Sprint. It will then be done by any available technical writers.

C.

Wait until you have a technical writer on your Development Team to take care of this.

D.

Your Development Team is still responsible for creating user documentation. In this case, the Development Team members will write it.

Buy Now
Questions 80

Five new Scrum Teams have been created to build one product. A few of the developers on one of the Development Teams ask the Scrum Master how to coordinate their work with the order teams. What should the Scrum Master do?

Options:

A.

Teach the Product Owner to work with the lead developers on ordering Product Backlog in a way to avoid too much technical and development overlap during a Sprint.

B.

Teach them that it is their responsibility to work with the other teams to create an integrated Increment.

C.

Collect the Sprint tasks from the teams at the end of their Sprint Planning and merge that into a consolidated plan for the entire Sprint.

D.

Visit the five teams each day to inspect that their Sprint Backlogs are aligned.

Buy Now
Questions 81

Which approach is best for Scrum Teams in order to produce valuable Increments? (Choose the best answer.)

Options:

A.

Each Developer works on the component where they feel that they can contribute.

B.

Each Scrum Team is accountable for developing functionality from beginning to end.

C.

Each Scrum Team works on an independent set of components.

D.

Each Scrum Member works only as an independent layer of the system.

Buy Now
Questions 82

A Development Team is required to deliver a done Increment by the end of a Sprint. Select two statements that explain what “Done” means. (Choose two.)

Options:

A.

All work the Development Team is willing to do.

B.

Ready for integration.

C.

No work left from the definition of “Done”.

D.

Whatever the Product Owner defines as quality.

E.

All work to create software that is ready to be released to end users.

Buy Now
Questions 83

A Scrum Master is keeping a list of open impediments, but it is growing and they have been able to resolve only a small portion of the impediments. Which two techniques would be most helpful in this situation?

(Choose two.)

Options:

A.

Discuss the impediments with the Development Team.

B.

Prioritize the list and work on them in order.

C.

Arrange a triage meeting with all project managers.

D.

Add each open impediment to the Product Backlog.

Buy Now
Questions 84

Who is accountable for tracking the remaining work toward the Sprint Goal? (Choose the best answer.)

Options:

A.

The Developers.

B.

The Scrum Master.

C.

The Product Owner.

D.

The Project Manager.

Buy Now
Questions 85

What factor should be considered when establishing the Sprint length?

(choose the best answer)

Options:

A.

The organization has mandated similar length sprints.

B.

The need for the team to learn based on doing work and measuring results.

C.

The frequency at which team formation can be changed.

D.

The organization ' s release schedule.

Buy Now
Questions 86

Who determines when it is appropriate to update the Sprint Backlog during a Sprint?

Options:

A.

The Scrum Team.

B.

The Product Owner.

C.

The Developers.

D.

The Project Manager.

Buy Now
Questions 87

What are two responsibilities of testers in a Scrum Team?

(choose the best two answers)

Options:

A.

Finding bugs.

B.

Tracking quality metrics.

C.

Verifying the work of programmers.

D.

Scrum has no " tester " role.

E.

The Developers are responsible for quality.

Buy Now
Questions 88

What happens if the Scrum Team cannot complete its work by the end of the Sprint?

(choose the best answer)

Options:

A.

The Sprint is extended and future Sprints use this new duration.

B.

The Sprint length is unchanged and the Scrum Team continuously learns and adapts.

C.

The Sprint is extended temporarily. Lessons are taken to ensure it does not happen again.

Buy Now
Questions 89

True or False Developers do not meet with stakeholders: only the Product Owner meets with stakeholders

Options:

A.

True

B.

False

Buy Now
Exam Code: PSM-I
Exam Name: Professional Scrum Master I
Last Update: Apr 7, 2026