C_TS422_2022 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions and Answers

Questions 4

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

Options:

A.

Order type

B.

Planning strategy

C.

Requirements profile

D.

Requirements type

Buy Now
Questions 5

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

Options:

A.

Fill up to the maximum stock level.

B.

Fill up to the safety stock level.

C.

Fill up based on the lot size procedure.

D.

Fill up to the reorder stock level.

Buy Now
Questions 6

What does forecasting in the demand planning cycle include?

Note: There are 3 correct answers to this question

Options:

A.

One-off events

B.

Past quotation quantities

C.

Past sales order quantities

D.

Market intelligence

E.

Past production planning quantities

Buy Now
Questions 7

How can you set up a material as a phantom assembly?

Note: There are 2 correct answers to this question

Options:

A.

Define the special procurement type inside the material master.

B.

Change the item category of the phantom assembly in the bill of material •—' (BOM)

C.

Define the special procurement type inside the BOM

D.

Change the phantom item indicator for the phantom assembly in the bill of material (BOM)

Buy Now
Questions 8

What will happen in the MRP run if you have created a new MRP-relevant material that

supports both in-house production and external procurement?

Options:

A.

The MRP run assumes external procurement.

B.

The MRP run assumes in-house production.

C.

The MRP run does NOT consider the material; it has to be planned interactivelty

D.

The MRP run plans the material only if a quotation has been maintained.

Buy Now
Questions 9

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

Options:

A.

Routing

B.

Work Center

C.

Bill of material (BOM)

D.

Material Master

Buy Now
Questions 10

What does the material type influence?

Note: There are 2 correct answers to this question.

Options:

A.

Which document types and class categories are allowed

B.

Which material master screens appear and in which sequence

C.

Whether the material is produced in-house, procured externally, or both

D.

Which plant-specific and plant-independent statuses are allowed

Buy Now
Questions 11

You are trying to create a production order and NO valid production version can be selected. What could be the reasons?

Note: There are 2 correct answers to this question.

Options:

A.

NO bills of material (BOMs) are assigned to the production versions.

B.

All production versions for the material are locked.

C.

The order lot size is NOT within the validity range of a production version.

D.

NO production lines are assigned to the production versions..

Buy Now
Questions 12

What data can you maintain in the subitems of a bill of material (BOM)?

Note: There are 2 correct answers to this question.

Options:

A.

Installation point

B.

Item type

C.

Quantity

D.

Scrap percentage

Buy Now
Questions 13

You want to create a production order. What methods can you use?

Note: There are 2 correct answers to this question.

Options:

A.

Create by order release

B.

Convert a purchase requisition

C.

Create in Kanban process

D.

Create without material

Buy Now
Questions 14

Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

Options:

A.

Move Time

B.

Pick/pack time

C.

Setup time

D.

Float before production

E.

Queue time

Buy Now
Questions 15

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

Options:

A.

Scheduling agreement schedule line

B.

Purchase Order

C.

Planned Order

D.

Production Order

Buy Now
Questions 16

When you create a sales order

When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?

Options:

A.

When MRP creates a dependent requirement

B.

When MRP creates a planned order

C.

When you create a sales order

D.

When MRP creates a planned order

Buy Now
Questions 17

For a production version to be valid and consistent, what requirements must be fulfilled? Note:There are 3 correct answers to this question.

Options:

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing

B.

The lot size range must be within the lot size range of the assigned routing.

C.

The assigned routing and bill of material (BOM) must be valid in the entirevalidity period.

D.

The assigned routing must be a rate routing.

E.

The assigned routing must NOT have alternative sequences

Buy Now
Questions 18

You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

Options:

A.

Specify a negative planning horizon.

B.

Specify a positive planning horizon.

C.

Specify a positive offset time.

D.

Specify a negative offset time.

Buy Now
Questions 19

What is the purpose of a reporting point confirmation in repetitive manufacturing?

Note: There are 2 Correct answers to this question?

Options:

A.

To determine the work in progress along the production line

B.

To provide timely updates of inventory management for the staged components

C.

To reduce the total production lead time for a long production line

D.

To stage different components for a production line simultaneously

Buy Now
Questions 20

You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?

Options:

A.

Insert operation

B.

Squeeze in

C.

Schedule in working time only

D.

Find Slot

Buy Now
Questions 21

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection?

Options:

A.

When multiple production versions are maintained for one product

B.

When multiple operations are maintained for one product

C.

When alternative resources are used within one operation

D.

When multiple planned orders exist on one resource

Buy Now
Questions 22

In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

Options:

A.

MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.

B.

MRP assigns the capacity requirements automatically after the last scheduled order on a work center.

C.

MRP creates the capacity requirements without checking the work center capacities.

D.

MRP creates the capacity requirements only if the work center has sufficient capacity.

Buy Now
Questions 23

Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

Options:

A.

Make-to-stock production (10)

B.

Planning with final assembly (40)

C.

Make-to-stock production (20)

D.

Planning without final assembly (50)

Buy Now
Questions 24

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

Options:

A.

Kanban

B.

Material requirements planning

C.

Backflushing

D.

Production order release

Buy Now
Exam Code: C_TS422_2022
Exam Name: SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
Last Update: May 16, 2024
Questions: 80