Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

H12-425_V2.0 HCIP-Data Center Facility Deployment V2.0 Questions and Answers

Questions 4

Which of the following are components of NetCol8000-E220? (Choose three.)

Options:

A.

Indirect heat exchange system

B.

Mechanical auxiliary cooling system

C.

Spray system

D.

Electric control system

Buy Now
Questions 5

Three UPS5000-E-400Ks from a 2+1 parallel system. Which of the following statements about the parallel system are true?

Options:

A.

The parallel system capacity displayed on the LCD is 1200 kVA.

B.

The networkingmode is set to one-to-multiple for one UPS, and set to one-to-one for the other two UPSs.

C.

If the load is 420 kW, each of two UPSs carries 210 kW load, and the other one is standby and does not carry load.

D.

If the load is 420 kW, each of the three UPSs carries 140kW load.

Buy Now
Questions 6

If the battery charge current limit coefficient of the UPS5000-E is set to 0.1C10, which of the following statements about this parameter is true?

Options:

A.

The maximum batten/ charge current is 0.1C10.

B.

The batten/ charge current is always 0.1C10.

C.

The battery float charge current is 0.1C10.

D.

The maximum battery charge current is 0.1C10.

Buy Now
Questions 7

The UPS5000-E-200K works in normal mode. If two ECMs are faulty, how does the UPS work?

Options:

A.

The UPS has no output.

B.

The UPS transfers to bypass mode.

C.

The LCD is off, but the UPS still works in normal mode.

D.

The UPS switches to battery mode.

Buy Now
Questions 8

The ECC800-Pro is the core component for FusionModule2000 local management. Southbound components can be using the PoE bus.

Options:

A.

True

B.

False

Buy Now
Questions 9

Which of the following statements is true about UPS5000 power modules and bypass modules?

Options:

A.

The UPSS000-E-200K and UPS5000-E-400K use the same power module and provide the same capacity of 50 kVA but have different numbers of power modules.

B.

For UPSs of the same model but in different power segments, their bypass module capacity is the same.

C.

The power module capacity of both the UPS5000-S and UPS5000-E is 50 kVA. Therefore, the two types of UPS can be used together.

D.

The power modules used in the UPSS000-S-1200K are the same as those used in the UPS5000-E-200K.

Buy Now
Questions 10

After all historical alarms of the NetCol5000-A are deleted, the deletion operation is not logged.

Options:

A.

True

B.

False

Buy Now
Questions 11

The UPS can generate large leakage currents. A circuit breaker equipped with a residual current device (RCD) is not recommended. If leakage protection is required, consider the leakage current of the UPS and downstream devices.

Options:

A.

True

B.

False

Buy Now
Questions 12

Which features of Huawei integrated UPS can reduce the footprint?

Options:

A.

Intelligent alternating hibernation technology

B.

High power density design

C.

Hot swap

D.

Installation against a wall

Buy Now
Questions 13

In the water-side free cooling solution, cold water cannot be transported directly from the cooling tower to chilled conditioner?

Options:

A.

True

B.

False

Buy Now
Questions 14

Which of the following devices can be powered by the PDU8000 integrated PDF in the FusionModule2000?

Options:

A.

indoor unit of an air-cooled precision air conditioner

B.

indoor unit of a water-cooled precision air conditioner

C.

IT load

D.

Chiller

Buy Now
Questions 15

In the FusionModule2000, if a device port complies with the Modbus RTU protocol, which device is used to connect to smart ETH gateway?

Options:

A.

ETH converter

B.

Access actuator

C.

Skylight actuator

D.

AC actuator

Buy Now
Questions 16

In operant conditioning, the subject is free to make responses at any time, So conditioning is measured by the rate of responding. In most other Ways, however, their forms of learning are essentially the same.

Options:

A.

When UPSs are connected in parallel, connect loads to the pL terminal.

B.

When a single UPS works and loads are of the same importance, connect all loads to the sL terminal.

C.

When a single UPS works and loads are divided into two levels, connect the primary load to the sL terminal and thesecondary load to the pl_ terminal.

D.

When the UPS is overloaded, the loads connected to the sL terminal will be powered off first to ensure continuous power supply to the loads connected to the pj_ terminal.

Buy Now
Exam Code: H12-425_V2.0
Exam Name: HCIP-Data Center Facility Deployment V2.0
Last Update: Apr 28, 2024
Questions: 55
H12-425_V2.0 pdf

H12-425_V2.0 PDF

$28  $80
H12-425_V2.0 Engine

H12-425_V2.0 Testing Engine

$33.25  $95
H12-425_V2.0 PDF + Engine

H12-425_V2.0 PDF + Testing Engine

$45.5  $130