Black Friday Madness- 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: fifty75ct

H35-581_V2.0 HCIP-5G-RNP&RNO Questions and Answers

Questions 4

Which parameter specifies the maximum number of consecutive out-of-synchronization indications that a UE receives from the lower layer on the PCell?

Options:

A.

N312

B.

N310

C.

N311

D.

T310

Buy Now
Questions 5

Which of the following link-budget parameters is unrelated to the frequency band?

Options:

A.

Rain and snow fading

B.

Penetration loss

C.

Shadow fading margin

D.

Interference margin

Buy Now
Questions 6

Which of the following physical-layer processing procedures is dedicated to the DFT-S-OFDM waveform?

Options:

A.

Modulation

B.

Scrambling

C.

Layer mapping

D.

Transformer precoding

Buy Now
Questions 7

Which of the following statements regarding throughput-related indicators is incorrect?

Options:

A.

The measurement result is more accurate if the last small packet of each data transmission burst and its transmission duration are added.

B.

The uplink/downlink average UE throughput is used to evaluate the user-perceived rate.

C.

The average throughput of a single UE is obtained by dividing the data volume transmitted or received by the UE by the actual data transmission time.

D.

The actual cell throughput can be obtained by dividing the total data transmission throughput within a measurement period by the time when data is transmitted in the cell.

Buy Now
Questions 8

Which of the following parameters are included in the measurement target IE of the 5G measurement configuration message?

Select All that Apply

Options:

A.

Cell frequency

B.

Serving cell offset

C.

SMTC

D.

SSB frequency

Buy Now
Questions 9

Which of the following messages includes the reselection timer used for 5G-to-4G reselection?

Options:

A.

SIB19

B.

SIB5

C.

SIB 24

D.

SIB7

Buy Now
Questions 10

After a UE has accessed an LTE network, which of the following conditions must be satisfied for the eNodeB to send 5G B1 measurement configuration messages?

Select All that Apply

Options:

A.

The core network does not forbid the NSA capability of the UE.

B.

The UE capabilities reported contain the Release 15 capability.

C.

The NSA DC switch and neighboring NR frequencies are correctly configured on the LTE side.

D.

The LTE main control board is a UMPTa.

Buy Now
Questions 11

How many consecutive symbols does each SSB occupy in the time domain?

Options:

A.

4

B.

2

C.

8

D.

1

Buy Now
Questions 12

Which of the following messages can carry NSSAI information?

Select All that Apply

Options:

A.

RPC Setup

B.

RPC Setup Request

C.

Registration Request

D.

RPC Setup Complete

Buy Now
Questions 13

For the formula used to calculate PUSCH power during initial access, which statement about path loss (PL) is correct?

Options:

A.

PL is an uplink path loss value estimated by a gNodeB.

B.

PL is an uplink path loss value estimated by a UE.

C.

PL is an uplink path loss value estimated by a UE.

D.

PL is an uplink path loss value estimated by the gNodeB.

Buy Now
Questions 14

Which of the following parameters determines the PRACH time-domain position?

Options:

A.

Logic root sequence

B.

Frequency offset

C.

Ncs

D.

PRACH config index

Buy Now
Questions 15

Which of the following slot configurations has a relatively large E2E delay?

Options:

A.

8:2 (5 ms single-period DDDDDDDSUU)

B.

7:3 (2.5 ms dual-period DDDSUDDSUU)

C.

4:1 (2.5 ms single-period DDDSU)

D.

3:1 (2 ms single-period DDSU)

Buy Now
Questions 16

If a cell covers a high-speed railway on which UEs travel at 250 km/h, which PRACH format should be selected for that cell?

Options:

A.

Format3

B.

Format2

C.

Format1

D.

Format0

Buy Now
Questions 17

For NR coverage optimization, the principle is to preferentially optimize SS-SINR and then SS-RSRP.

Options:

A.

True

B.

False

Buy Now
Questions 18

Which of the following parameters relate to open-loop power control for PUCCH power control?

Select All that Apply

Options:

A.

PUCCH SCS

B.

UCI format

C.

Number of RBs configured for the PUCCH

D.

PUCCH MCS

Buy Now
Exam Code: H35-581_V2.0
Exam Name: HCIP-5G-RNP&RNO
Last Update: Nov 14, 2026
Questions: 60
H35-581_V2.0 pdf

H35-581_V2.0 PDF

$22.5  $89.99
H35-581_V2.0 Engine

H35-581_V2.0 Testing Engine

$26.25  $104.99
H35-581_V2.0 PDF + Engine

H35-581_V2.0 PDF + Testing Engine

$35  $139.99