1z0-1075-24 Oracle Manufacturing Cloud 2024 Implementation Professional Questions and Answers

Questions 4

You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.

Which setup task must you perform in the Manage Plant Parameters section to achieve this?

Options:

A.

Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.

B.

Set Default Transaction Mode to Work Definition.

C.

Set Default Transaction Mode to AIL

D.

Set Default Transaction Mode to Entered.

Buy Now
Questions 5

Which statement is NOT true about user-defined work order statuses?

Options:

A.

The system automatically updates user-defined work order statuses.

B.

They are displayed on work order reports.

C.

It is not recommended to update the name of the system status.

D.

All the new statuses are searchable so you can filter your job and manage the work order life cycle more easily.

Buy Now
Questions 6

A Manufacturing Engineer in a plant is creating an alternate manufacturing process for an item using its existing work definitions. After copying from the existing work definition, WD1, to the alternate work definition, WD2, the engineer finds that the operation items were not copied in the alternate manufacturing process WD2.

What is the reason for this?

Options:

A.

Production Priority was not populated in the new WD2 during creation.

B.

Item and Structure Name in the existing WD1 were retained in the new WD2 during creation.

C.

Item and Structure Name were changed in the new WD2 during creation.

D.

Start Date was not populated in the new WD2 during creation.

Buy Now
Questions 7

A Production Operator is executing a work order at your plant. After completing move transactions, they notice that they have performed some incorrect move operations, including incorrect scrap and reject transactions.

They must perform a reverse transaction to correct the errors. The operations are not count point-enabled and not auto-charged.

Which four transactions are required to correct this situation?

Options:

A.

Reverse material issued to a work order.

B.

Reverse at an operation.

C.

Reverse from Scrap to Ready.

D.

Reverse from Reject to Ready.

E.

Reverse the product at the last operation.

F.

Reverse resources charged to a work order.

Buy Now
Questions 8

Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?

Options:

A.

You can generate the Extensible Work Order Traveler report only from the Review Dispatch List and Manage Supplier Operations pages.

B.

It is a critical document that travels with the physical material during production.

C.

The production operator can invoke It from the Manage Work Orders, Review Dispatch ust. and Manage Supplier Operations pages.

D.

Operators can invoke it by using the Generate Extensible Work Order Traveler Report task.

E.

You use Page Composer to display only the required actions.

Buy Now
Questions 9

Which statement is NOT true about the Reservations tab?

Options:

A.

Demand details displayed are: Document Type (such as Sales Order), Customer Number and Name, Document Number, Due Date, and Quantity.

B.

Reservations are generally created when a Back-to-Back sales order or a Configured Items sales order Is reserved for the work order.

C.

A work order can be reserved against one or more sales orders.

D.

Manual reservations can be done for a work order in inventory.

E.

You can view the reservation details of a work order as a source of demand, and a sales order as supply.

Buy Now
Questions 10

Your client is planning to override the Plant Production Calendar with One or More Date-Effective Work Center Calendars. You need to explain the consideration when using the Override the Plant Production Calendar with One or More Date-Effective Work Center Calendars feature.

Which three statements are true when overriding the production calendar?

Options:

A.

The Work Execution Work Area Infolets and Manage Production Exceptions page are based on the plant calendar and not on work center calendars.

B.

While defining override calendars, you need to ensure that the date effective range for a work center calendar association can be overlapping and contiguous.

C.

Even if there are override calendars, the lead time calculation in days for an item remains based on the plant calendar and not on work center calendars.

D.

When the user executes search action in the Review Dispatch List page, if more than one work center are selected and if the start date or completion date is based on Shift-based search, then the operations are queried based on the shifts of the plant calendar only.

E.

Supplier operations used in outside processing use the work center calendar in work order scheduling.

Buy Now
Questions 11

Which three entities must you set up in Oracle Manufacturing Cloud to create a work definition for an item that will be manufactured in-house?

Options:

A.

Resources

B.

Operations

C.

Production line

D.

Operation items

E.

Manufacturing lead time

Buy Now
Questions 12

Which three are Cost accounting methods'

Options:

A.

Perpetual Average Cost

B.

Layer Cost, also known as "LIFO"

C.

Frozen Standard Cost

D.

Actual Cost, also known as "FIFO"

E.

Periodic Actual Cost

Buy Now
Questions 13

The pick release of a project work order creates movement requests with the project and the task from the work order.

Which statement is NOT true about this?

Options:

A.

The expenditure type, expenditure date, and expenditure organization are derived when the work-ln-process material issue or work-in-process material pick transactions are interfaced to Costing.

B.

The expenditure type for the item is derived based on the Default Expenditure Type attribute in Inventory Management. The picks for the work order ore grouped by project costing, project, and task using pick slip grouping rules.

C.

The expenditure type and the expenditure organization from the work order are referenced onto the shop floor movement requests.

D.

The expenditure type and the expenditure organization from the work order are not referenced onto the shop floor movement requests.

Buy Now
Questions 14

Which three actions can a supervisor perform to annul or correct mistakes in a completed work order, committed by a user while entering work order details?

Options:

A.

Reverse a Closed order to Open.

B.

Correct the Product entered at work order.

C.

Reverse from Scrap to Ready.

D.

Reverse at an operation.

E.

Reverse the product at the last operation.

Buy Now
Questions 15

A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2 available for day and night shift.

What is the correct sequence of steps to achieve this?

Options:

A.

Associate R2 with WC1 > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

B.

Associate R2 with WC1> Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

C.

Associate R2 with WCI > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 in the Day Shift column > Enter 2 in the Night Shift column.

D.

Associate R2 with WCI > Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 In the Day Shift column > Enter 2 In the Night Shift column.

Buy Now
Exam Code: 1z0-1075-24
Exam Name: Oracle Manufacturing Cloud 2024 Implementation Professional
Last Update: Jun 15, 2025
Questions: 50
1z0-1075-24 pdf

1z0-1075-24 PDF

$29.75  $84.99
1z0-1075-24 Engine

1z0-1075-24 Testing Engine

$35  $99.99
1z0-1075-24 PDF + Engine

1z0-1075-24 PDF + Testing Engine

$47.25  $134.99