In the data collection stage, an assessment of what information is generally necessary?

Options:

A.

The type of RBI assessment that will be applied to the project

B.

The codes and standards in use for in-service inspection and evaluation

C.

What other types of risk assessment and mitigation have been applied to the equipment

D.

The risk thresholds that will be used to determine acceptable vs. unacceptable risks

Buy Now
Questions 5

In terms of mitigating risk, which of the following is an example of an integrity operating window process parameter?

Options:

A.

Materials of construction

B.

Fluid velocity

C.

Vibration frequency

D.

Heat transfer

Buy Now
Questions 6

In preparing for a future inspection, which of the following assessments can be used to determine what flaws would require repair or replacement?

Options:

A.

RBI

B.

FFS

C.

POF

D.

COF

Buy Now
Questions 7

How important is data quality in RBI assessment?

Options:

A.

Equally important for all types

B.

Most important for quantities

C.

Most important for qualitative RBI

D.

Not as important in qualitative RBI

Buy Now
Questions 8

What program is used when damage mechanisms are precipitated by short-term, event-driven operating changes?

Options:

A.

Integrity Operating Windows

B.

Process Hazards Analysis

C.

Process Safety Management

D.

Risk-Based Inspection

Buy Now
Questions 9

What is a risk driver?

Options:

A.

The primary contributor(s) responsible for a significant share of a risk value.

B.

The primary identifier(s) used to assist in the acceptance or mitigation of found damage.

C.

The primary element(s) to find, list, and characterize probability of failure.

D.

The primary element(s) to find, list, and characterize consequence of failure.

Buy Now
Questions 10

In RBI analysis, it is important to link the damage mechanism to the most likely resulting:

Options:

A.

failure mode.

B.

consequence.

C.

probability of failure.

D.

harmful event.

Buy Now
Questions 11

As indicated in API RP 580, one essential element of an RBI program includes:

Options:

A.

avoidance of catastrophic loss and fatalities.

B.

documented method of COF determination.

C.

consideration of all possible damage mechanisms.

D.

the reduction of risk associated with loss of containment.

Buy Now
Questions 12

What is one goal of a risk matrix or risk plot?

Options:

A.

To understand how consequence and probability of risk varies between different levels of risk

B.

To communicate the results of a risk assessment in a common format that a variety of people can understand

C.

To show ISO-risk lines and boxes on a matrix and determine which risks are acceptable and which are not

D.

To determine what level of risk is acceptable to management based on consequence and probability of failure

Buy Now
Questions 13

At the conclusion of the initial planning portion for the development of the RBI program, which of the following important issues should have been completed?

Options:

A.

Designation of needed team members

B.

Identification of the physical boundaries

C.

Collection of the necessary data to be analyzed during the assessment

D.

Request for resources to complete the analysis (not including implementation)

Buy Now
Questions 14

Which of the following has the most direct relation to the relative accuracy of the RBI analysis?

Options:

A.

Data precision

B.

Data quality

C.

Data sources

D.

Data validation

Buy Now
Questions 15

Which of the following statements is correct with regard to determining the probability of a specific consequence?

Options:

A.

The events leading to it should be considered.

B.

Other credible events that could lead to it need not be considered.

C.

It usually increases with the severity of the incident.

D.

It is independent of the probability of failure.

Buy Now
Questions 16

What method of mitigation is most likely to reduce the amount and rate of release?

Options:

A.

Substitute a less hazardous material

B.

Emergency depressuring capability

C.

Water spray and deluge systems

D.

Spill detectors and containment

Buy Now
Questions 17

When collecting data and information, which of the following describes the role of RBI data precision?

Options:

A.

It is considered synonymous with accuracy.

B.

It generally cannot be combined with other risk analysis.

C.

It must be the same for all RBI methods considered.

D.

It should be consistent with the type of RBI method used.

Buy Now
Questions 18

Which of the following is the act of mitigating a particular risk?

Options:

A.

Risk assessment

B.

Risk management

C.

Risk reduction

D.

Risk determination

Buy Now
Questions 19

During data collection, it is important to stress that the precision of the data collected should be consistent with what aspect of the RBI assessment?

Options:

A.

Accuracy

B.

Method

C.

Risk thresholds

D.

Sensitivity

Buy Now
Questions 20

In RBI analysis, dividing process units into groups of equipment that have common characteristics is:

Options:

A.

not permitted unless equipment is in identical service.

B.

useful only for common types of equipment.

C.

to be avoided because every equipment item is unique.

D.

useful as a means of screening together and saving time.

Buy Now
Questions 21

Which of the following statements is generally correct with regard to qualitative RBI analysis using a broad range of data?

Options:

A.

It generally results in lower accuracy analysis.

B.

It does not require a high level of accuracy and precision in the data.

C.

It is generally improved by utilizing numeric data.

D.

It requires a high-level of judgment, skill, and understanding.

Buy Now
Questions 22

RBI analysis requires a team approach primarily because:

Options:

A.

risk may be assessed differently for each equipment item.

B.

different levels of experience are essential to the process.

C.

maintenance and engineering must be involved in addition to inspection.

D.

one person typically does not have the background or skills to perform the entire analysis.

Buy Now
Questions 23

Which of the following are essential elements of an RBI program? (Select all that apply)

Options:

A.

Management system for personnel qualifications

B.

Documented method of determining failure probability and consequence

C.

Management system for maintaining documentation and analysis updates

D.

Process hazard analysis to verify the adequacy of process safety

Buy Now
Questions 24

Before decisions are made based on risk analysis results, what should be done first?

Options:

A.

The risk analysis should be validated

B.

The inspection plan should be completed

C.

A sensitivity analysis should be completed

D.

The inspector shall approve the results

Buy Now
Questions 25

When equipment has deteriorated to such an extent that the risk of failure cannot be managed and held to an acceptable level, often the only way to mitigate risk is to:

Options:

A.

repair/replace the equipment.

B.

perform a fitness-for-service analysis.

C.

shorten the inspection interval.

D.

rerate the equipment.

Buy Now
Questions 26

The continuum of RBI approaches is the:

Options:

A.

continuous improvement cycle involved in RBI reassessment.

B.

variance from low to high in detail of RBI analysis.

C.

range between data collection and risk mitigation for RBI.

D.

range between qualitative and quantitative RBI.

Buy Now
Questions 27

The fact that some jurisdictions may have some prescriptive time-based rules on inspection intervals does not preclude the user from gaining significant benefits from the application of RBI, as long as:

Options:

A.

local regulations do not specifically prohibit the use of RBI planning.

B.

the inspection intervals do not exceed half-life or 10 years maximum.

C.

the RBI process methodology is in accordance with API RP 581.

D.

the RBI process is implemented by an API 580 certified individual.

Buy Now
Exam Code: API-580
Exam Name: API 580 - Risk Based Inspection
Last Update: Jun 15, 2025
Questions: 90
API-580 pdf

API-580 PDF

$29.75  $84.99
API-580 Engine

API-580 Testing Engine

$35  $99.99
API-580 PDF + Engine

API-580 PDF + Testing Engine

$47.25  $134.99