You are the business analyst for your organization and you're working with Adam on business analysis processes. Adam is steeped in knowledge regarding the project's purpose. Of the following, what type of business analysis stakeholder is Adam?

Options:

A.

Project manager

B.

Domain subject matter expert

C.

Sponsor

D.

Regulator

Buy Now
Questions 5

What term is given to the collection of notes and diagrams used by the business analyst to develop the requirements during the requirements development process?

Options:

A.

Work product

B.

Deliverable

C.

Supporting requirements package detail

D.

Work package

Buy Now
Questions 6

A business analyst wants to host a brainstorming session with eight key stakeholders. In preparation for this event, the business analyst should designate which one of the following rules for the session?

Options:

A.

Create a goal for the number of ideas the group should generate.

B.

Allow any ideas for possible solutions even if they are not in the defined area of interest.

C.

Set a time limit for the session.

D.

Rate each idea that is generated.

Buy Now
Questions 7

According to the business analysis book 'A Guide to the Business Analysis Body of Knowledge', which your exam is largely based on, almost all methodologies fit somewhere along a spectrum between plan-driven and what other methodology?

Options:

A.

Risk-driven

B.

Cost-driven

C.

Change-driven

D.

Reward-driven

Buy Now
Questions 8

Which of the following defines all of the features and functions of the thing, solution, or service the project or organization will create?

Options:

A.

Requirements envisioning

B.

Project scope

C.

Requirements foundation

D.

Product scope

Buy Now
Questions 9

A business analyst has been assigned the task of developing a model of the current state of an organization. The business analyst doesn't understand why a current state may be needed. All of the following are good reasons to create a current state model of an organization except for which one?

Options:

A.

Analyzing the current state of the organization to look for opportunities for improvement

B.

Assessing the positive and negative risks that may exist within the current state

C.

Validating the solution scope with businesses and technical stakeholders

D.

Assisting stakeholders to understand the current state

Buy Now
Questions 10

Barry is a project stakeholder that is excited about the deliverable your project wants to create for the organization. He's helpful, provides information, and offers support whenever your project needs it. How would you classify Barry based on this information?

Options:

A.

Positive stakeholder

B.

Cheerleader

C.

Project sponsor

D.

Project team member

Buy Now
Questions 11

There are four methods to generate a business need in an organization. Which approach would an organization use when there's recognized competition in the marketplace?

Options:

A.

From the bottom up

B.

From external drivers

C.

From middle management

D.

From the top down

Buy Now
Questions 12

When you, a Business Analyst, work with your stakeholders, team, and experts to define the business analysis activities, what thing do you actually define?

Options:

A.

You define the requirements of the initiative.

B.

You define the roles and responsibilities.

C.

You define the communication needs.

D.

You define the business analysis approach.

Buy Now
Questions 13

High quality requirements have certain characteristics which distinguish them from low-quality requirements. Which characteristic of requirements demands that all requirements in a set or model support its overall purpose and scope?

Options:

A.

Complete

B.

Cohesive

C.

Correct

D.

Consistent

Buy Now
Questions 14

One of the techniques to assess capabilities in an organization is to use SWOT. What does SWOT accomplish?

Options:

A.

SWOT reviews your strengths, weaknesses, opportunities, and threats.

B.

It identifies how current capabilities match up against the influencing factors.

C.

It assesses the strength, weaknesses, opportunities, and threats.

D.

SWOT is a goal setting technique that means "Sweat Works Over Time."

Buy Now
Questions 15

Robert is the business analyst for his organization and is preparing to host a workshop for twenty stakeholders. The goal of this workshop is to comprehensively identify the requirements for newsoftware that will be created for Robert's organization. What must first be established in the workshop to ensure that the elicitation process moves smoothly?

Options:

A.

An understanding of the ground rules of the workshop

B.

An understanding of who are the most important stakeholders

C.

An understanding of the business opportunity

D.

An understanding of the requirements elicitation processes

Buy Now
Questions 16

A business analyst is meeting with the customer of the project. The customer tells the business analyst that she can only allow the budget of $575,000 for the project. This budget is best described as what type of constraint?

Options:

A.

Technical constraint

B.

Verified constraint

C.

Financial constraint

D.

Business constraint

Buy Now
Questions 17

Which stakeholder in the solution assessment task will provide information on technical constraints that could limit the solutions that may be implemented?

Options:

A.

Project manager

B.

Suppliers

C.

Sponsor

D.

Operational support

Buy Now
Questions 18

A business analyst (BA) is proposing design options and a number of opportunities are occurring that need to be understood further. One particular opportunity will prevent different stakeholders from performing the same function in distinctly different ways. What type of opportunity is this?

Options:

A.

Reduced barriers to entry

B.

improved access to information

C.

increased efficiency

D.

Additional capabilities

Buy Now
Questions 19

As part of a strategic initiative, a bank decides to expand operations to a new country where the most commonly used language is Spanish. The bank's current mobile application only supports English. The organization initiates a project to provide local language support for the app. From which level did the business need originate?

Options:

A.

Middle management

B.

External drivers

C.

Bottom up

D.

Top down

Buy Now
Questions 20

A stakeholder has requested an extremely detailed resolution to an issue during current state analysis that may consume about 20% of the estimated project effort. How should the business analyst (BA) handle the situation?

Options:

A.

Ask the project sponsor for additional funding

B.

Escalate the request to the project manager for reevaluation of the plan

C.

Spend the required effort to develop the detail

D.

Explain that the degree of effort may not be necessary at this stage

Buy Now
Questions 21

A business analyst (BA) has elicited the following requirement; "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

Options:

A.

Nonfunctional requirements

B.

Stakeholder requirements

C.

Transitional requirements

D.

functional requirements

Buy Now
Questions 22

A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?

Options:

A.

Consider business relevance while tracing requirements

B.

Choose appropriate format to communicate requirements

C.

Ensure test scenarios align to business requirements

D.

Facilitate a focus group with users to get feedback

Buy Now
Questions 23

A domain subject matter expert (SME) describes a scenario to the business analyst (BA) that may need to be considered for an impending change. The BA and domain SME sketch out the process model for this exception scenario for consideration. What action does the BA take?

Options:

A.

Capture and integrate this process model into other appropriate planned outcomes

B.

Plan an observation activity to gain a hands-on understanding of the situation

C.

Document the elicitation results then verify and validate in requirements review

D.

Review the issue with stakeholders during a follow-up session

Buy Now
Questions 24

The emergence of self-driving vehicles has disrupted the auto insurance industry. The Chief Information Officer (CIO) has asked the business analyst (BA) to modify the existing business model to include self-driving vehicles. Which of the following will be valuable information for the BA to use?

Options:

A.

Vision and mission statement

B.

Project charter

C.

Business architecture framework

D.

Organizational structure

Buy Now
Questions 25

The director of a furniture store manages a group of skilled carpenters who make furniture from locally available materials. The director decides to automate its inventory processes so that carpenters can place orders for raw materials themselves. A business analyst (BA) is engaged to define the requirements and propose options for commercial off-the-shelf (COTS) inventory management solutions. After meeting with the director, the BA needs to schedule a workshop with the carpenters to:

Options:

A.

investigate whether automation is a constant for the end user.

B.

demonstrate some of the proposed products to the end users.

C.

convey the benefits for the automation to the end users.

D.

present the proposed future state to the end users.

Buy Now
Questions 26

A government agency has initialed a project to implement a customer registry that will be shared across multiple agencies. Early estimates indicate there will be hundreds of requirements. While determining the requirements traceability approach, what factor takes precedence?

Options:

A.

Number of defects

B.

Cost of tracing

C.

Number of stakeholders

D.

Cost of testing

Buy Now
Questions 27

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

Options:

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Buy Now
Questions 28

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

Options:

A.

Decision modelling

B.

SWOT analysis

C.

Mind mapping

D.

Functional decomposition

Buy Now
Questions 29

A business owner has identified a high priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to perform an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Number of systems being affected by the requirement

B.

Original source of the requirement

C.

Method of requirement communication

D.

Selection of the elicitation for the requirement

Buy Now
Questions 30

A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?

Options:

A.

Organizational performance standards

B.

Information management approach

C.

Modelling notations standards

D.

Business analysis approach

Buy Now
Questions 31

System designers are working with a business analyst (BA) during the initial stages of a project to implement a new transaction-based system. The system designers would like to have a visual that illustrates the type of information that will be input in the system, the processes it will support, and the location where it will be stored. What type of diagram meets the designers' needs?

Options:

A.

Use Case

B.

Data flow

C.

Activity flow

D.

State Modelling

Buy Now
Questions 32

A business analyst (BA) has completed multiple workshops involving a number of stakeholders including the project manager however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

Options:

A.

The project manager should decide which requirement is relevant.

B.

The BA should select which requirements are correct.

C.

The project manager should model requirements in a review meeting.

D.

The BA should model the elicited requirements in a review meeting.

Buy Now
Questions 33

A business analyst (BA) develops a template to document the product feature requirements for an enterprise software solution. Within the template, the BA includes the following additional information: source, priority level, level of complexity, and last modified date. What does the additional information describe?

Options:

A.

Requirement analysis

B.

Requirement traceability

C.

Requirement attributes

D.

Requirement management

Buy Now
Questions 34

The following chart represents attendance of subject matter experts (SME) and the solution owner for a requirements review and approval meeting held weekly by a business analyst (BA).

The requirements package was approved by the solution owner during the May 30 meeting. After implementation of the solution, the BA learns that the users in SME-3 s area are not using the system. Which business analysis activity should the BA have monitored more closely to mitigate this situation?

Options:

A.

Business processes

B.

Requirements scope

C.

Solution performance

D.

Stakeholder engagement

Buy Now
Questions 35

A business analyst (BA) is working on a data-centric IT project. The business stakeholders develop the content but do not understand the technical aspects while the IT team believes that there is no need to understand the business issues. Which deliverable will facilitate understanding between IT and the business stakeholders?

Options:

A.

Data models

B.

Data dictionary

C.

Transition requirements

D.

Non-functional requirements

Buy Now
Questions 36

A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?

Options:

A.

Priority

B.

Complexity

C.

Necessary

D.

Source

Buy Now
Questions 37

A business analyst (BA) working with a large insurance corporation interviewed an industry thought leader who predicted that many of the regulations currently imposed by the government will change very soon. The BA communicated the observation to the leadership team of the organization because many on-going projects were triggered by those regulations. The leadership team unanimously decided to cancel the initiatives that were driven by the government regulations. What is the corporation's attitude towards risk?

Options:

A.

Risk Neutral

B.

Risk Averse

C.

Risk Tolerant

D.

Risk Seeking

Buy Now
Questions 38

An organization has identified a market opportunity that could result in significant business gains. A business analyst (BA) is asked to assist in building the new business model. The BA begins by analyzing the current state. What input is critical to the current state analysis?

Options:

A.

Goals and objectives

B.

Organizational culture

C.

Risks and assumptions

D.

Business needs

Buy Now
Questions 39

A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change. What previous task could assist the BA in performing the impact analysis?

Options:

A.

Update use case scenarios

B.

Perform a risk analysis

C.

Create requirement relationships

D.

Conduct a cost-benefit analysis

Buy Now
Questions 40

A company has bought a customizable software product and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?

Options:

A.

Develop a data model

B.

Create a process model

C.

Review data flow diagrams

D.

Observe the activity

Buy Now
Questions 41

A solution that was implemented several years ago has achieved its stated objective of consolidating data from multiple sources. However, end user feedback reveals problems and inefficiencies. What should the business analyst (BA) do first?

Options:

A.

Perform a root cause analysis

B.

Recommend corrective measures

C.

Identity any lessons learned

D.

Revise the business objectives

Buy Now
Questions 42

While gathering information during a requirements workshop, a subject matter expert states that it is likely that an organizational restructure will occur in one of the business departments that will be utilizing parts of the new system. As such, the business analyst (BA) should:

Options:

A.

ask the project sponsor to confirm whether and when the restructure will occur.

B.

record a risk that requirements may change and further explore the likelihood and impact of the risk.

C.

note the constraint that the solution must be flexible to accommodate different roles after implementation.

D.

proceed as if the business unit will not be restructured and wait for the organization to confirm otherwise.

Buy Now
Questions 43

A senior business analyst (BA) must review the requirements specification of a junior BA. The senior BA puts together a list of key evaluation criteria to guide the determination of a requirement's quality. Which of the criteria below is a characteristic of a quality requirement?

Options:

A.

Atomic

B.

Owned

C.

Mapped

D.

Allocated

Buy Now
Questions 44

Two stakeholders are arguing over which model to use for describing requirements. One insists that using an activity diagram is superior while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?

Options:

A.

Explain that the models are complementation to each other

B.

Allow both stakeholders to work on the models independently

C.

Introduce a third model type so that neither stakeholder prevails

D.

Suggest a fusion model that integrates activity and state diagrams

Buy Now
Questions 45

A new Chief Executive Officer (CEO) is appointed to revive a chain of well-recognized superstores. The CEO wants to increase sales by introducing on-line shopping. Most stores are understaffed and maintenance is a challenge. Which of the following would be

considered an asset?

Options:

A.

Store maintenance expenses

B.

Brand reputation

C.

Interest mounting on bank loan

D.

Online shopping website

Buy Now
Questions 46

A business analyst (BA) has spent the week conducting work sessions with a project's key stakeholders. Together, they have been reviewing user requirements and high-level design flowcharts to ensure that they have been correctly defined and documented. Which of the following describes the purpose of their work?

Options:

A.

Validating requirements

B.

Eliciting requirements

C.

Verifying requirements

D.

Approving requirements

Buy Now
Questions 47

A business analyst (BA) is negotiating and resolving conflict with stakeholders to ensure they participate in the required BA activities. Which element of stakeholder management is the BA performing?

Options:

A.

Plan stakeholder engagement

B.

Monitor stakeholder engagement

C.

Gain agreement on commitments

D.

Confirm elicitation results

Buy Now
Questions 48

An organization is planning to launch an exciting new service that has never been offered before. The expectations are that the service will be extremely popular with young families, but because the organization wants to keep it a secret until launch day, there is no way of knowing whether this is correct. Why should the business analyst (BA) suggest identifying high customer demand by young families as a risk?

Options:

A.

To manage the associated risks.

B.

To prove the idea is correct.

C.

To provide a benchmark against future change.

D.

To assess the costs and benefits accurately.

Buy Now
Questions 49

A business analyst (BA) is developing requirements for a project with a limited budget. The business owner will be prioritizing requirements so that low-value requirements can be de-scoped and the project remains within budget. Which of the following should the BA take into account to facilitate prioritization and ensure business objectives are met?

Options:

A.

Dependencies

B.

Data flow

C.

Functional decomposition

D.

Traceability

Buy Now
Questions 50

A business analyst (BA) has structured information so it is easy to find, does not conflict with other information, and is not duplicated unnecessarily. Which additional factor does the BA need to take into account when deciding how to structure the information?

Options:

A.

The number of stakeholders to be consulted

B.

The governance and engagement approach to be used

C.

The level of experience with the repository tool

D.

The size and complexity of the change

Buy Now
Questions 51

The business need is considered to be the most critical step in the business analysis effort. Why is the definition of the business need considered the most critical step?

Options:

A.

The business need defines the problem the business analyst is finding a solution for.

B.

The business need defines the solution for the business problem.

C.

The business need takes the longest time and costs most of the business analysis efforts.

D.

The definition of the business need determines future solutions, stakeholders, and approaches.

Buy Now
Questions 52

A Chief Information Officer (CIO) was discussing a solution approach for a technology project in a meeting where a business analyst (BA) was also present. Stakeholders were discussing advantages and disadvantages of each solution approach. What should be the top priority for the BA in assessing the solution approach?

Options:

A.

The strategic design options

B.

The trade-off and value to stakeholders

C.

The strategic alignment with the balanced scorecard

D.

The total cost of ownership of the project

Buy Now
Questions 53

A business analyst (BA) is identifying the functions and features required for a new enterprise software solution. The BA reviews historical documents about the current business processes and then interviews each stakeholder group individually, asking questions about current business processes. The BA compares the information during the stakeholder interviews with the information gathered from the historical documents. Which activity is the BA performing with this approach?

Options:

A.

Capture of elicitation outcomes

B.

Validation of requirements

C.

Confirmation of elicitation results

D.

Verification of requirements

Buy Now
Questions 54

A business analyst (BA) is working on a data-centric IT project. The business stakeholders develop the content but do not understand the technical aspects, while the IT team believes that there is no need to understand the business issues. Which deliverable will facilitate understanding between IT and the business stakeholders?

Options:

A.

Transition requirements

B.

Data models

C.

Data dictionary

D.

Non-functional requirements

Buy Now
Questions 55

A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise’s vision, mission, and goals. What element of 'SMART' goals would this objective refer to?

Options:

A.

Relevant

B.

Measurable

C.

Specialized

D.

Achievable

Buy Now
Questions 56

A business owner has identified a high-priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to conduct an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Selection of the elicitation techniques for the requirement.

B.

Number of systems being affected by the requirement.

C.

Original source of the requirement.

D.

Method of requirement communication.

Buy Now
Questions 57

A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?

Options:

A.

Business analysis approach

B.

Organizational performance standards

C.

Modeling notations standards

D.

Information management approach

Buy Now
Questions 58

For a new accounts payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

Options:

A.

"The solution will enable account holders to make account payments via a web form."

B.

"The solution will send payment notification to the account holder after successful processing."

C.

"The solution will report the average number of days an account payment is outstanding."

D.

"The solution will reduce the payment processing time from three days to two days."

Buy Now
Questions 59

A business analyst (BA) develops a template to document the product feature requirements for an enterprise software solution. Within the template, the BA includes the following additional information: source, priority level, level of complexity, and last modified date. What does the additional information describe?

Options:

A.

Requirement traceability

B.

Requirement attributes

C.

Requirement management

D.

Requirement analysis

Buy Now
Questions 60

A business analyst (BA) is logging end-user concerns and resolving these on a priority basis as mandated by the government. This project is a simple application, with no major strategic or financial impact on the organization. The BA strongly enforced end-to-end requirement traceability for this project. Why would the BA recommend this traceability approach?

Options:

A.

Complexity of the domain

B.

Organizational standards

C.

Costs and benefits

D.

Regulatory requirements

Buy Now
Questions 61

A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?

Options:

A.

Source

B.

Complexity

C.

Necessary

D.

Priority

Buy Now
Questions 62

System designers are working with a business analyst (BA) during the initial stages of a project to implement a new transaction-based system. The system designers would like to have a visual that illustrates the type of information that will be input into the system, the processes it will support, and the location where it will be stored. What type of diagram meets the designers' needs?

Options:

A.

Use Case

B.

State Modeling

C.

Data Flow

D.

Activity Flow

Buy Now
Questions 63

A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?

Options:

A.

Risk review

B.

Quality control checklist

C.

Decision analysis

D.

Communication plan

Buy Now
Questions 64

Several user groups are impacted by a proposed change to their daily workflow. How should the business analyst (BA) convey these changes so that the user groups understand the impact?

Options:

A.

Establish a communication plan

B.

Create business process models

C.

Develop a data model diagram

D.

Write functional requirements

Buy Now
Questions 65

A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change. What previous task could assist the BA in performing the impact analysis?

Options:

A.

Perform a risk analysis

B.

Conduct a cost-benefit analysis

C.

Create use case scenarios

D.

Create requirement relationships

Buy Now
Questions 66

When a business analyst is using alternative generation, what should she always include as an output?

Options:

A.

The cost of all requirements, some requirements, and a few core requirements

B.

The schedule of implementation for each solution

C.

The option of doing nothing

D.

The cost of each solution

Buy Now
Questions 67

You are a Business Analyst for your organization, and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Why is it important to complete the plan business analysis approach?

Options:

A.

This task describes the amount of time needed for the business analysis approach.

B.

This task describes the amount of budget needed for the requirements elicitation.

C.

This task describes how to select an approach for performing business analysis.

D.

This task describes the processes the business analyst will or will not do based on the time and budget available.

Buy Now
Questions 68

There are four methods to generate the business need in an organization. Which approach is described as the need to achieve a strategic goal?

Options:

A.

From the bottom up

B.

From external drivers

C.

From the top down

D.

From middle management

Buy Now
Questions 69

There are three inputs for stakeholder analysis. Which input describes the organizational units that exist and their interactions with one another?

Options:

A.

Business need

B.

Enterprise architecture

C.

Matrix structure

D.

Organizational process asset

Buy Now
Questions 70

You are the business analyst for a smaller project where there are few requirements. Management would still like you to create a method to trace the few requirements for this project. What type of matrix would be best in this instance?

Options:

A.

Coverage matrix

B.

Requirements trace matrix

C.

Roles and responsibility matrix

D.

RACI matrix

Buy Now
Questions 71

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which of the following are primary inputs of planning the business analysis approach?

Each correct answer represents a complete solution.

Options:

A.

Organizational process assets

B.

Penalty of not seizing the opportunity

C.

Expert Judgement

D.

Business need

Buy Now
Questions 72

Mark is a business analyst for his organization. A business need has been identified; therefore, Mark immediately sets out to identify the stakeholders. How long will stakeholder analysis need to continue?

Options:

A.

It will continue until all of the stakeholders have been identified.

B.

It will continue until the requirements have been approved.

C.

It will continue as long as business analysis continues.

D.

It will continue until the project charter is signed.

Buy Now
Questions 73

You are the business analyst for your organization and your requirements for the endeavor have recently been approved. Your organization creates a baseline for the requirements based on the approval of the requirements. What must happen in your business analysis activities if the requirements for your endeavor need to be changed?

Options:

A.

You'll need to create new baselines.

B.

You'll need to implement configuration management.

C.

You'll need to use a change control system.

D.

You'll need to create requirements versioning.

Buy Now
Questions 74

Which stakeholder map shows the relative influence, impact, and relation of stakeholders by plotting them closer to or farther away from the solution?

Options:

A.

RACI Matrix

B.

Onion diagram

C.

Control chart

D.

Tornado diagram

Buy Now
Questions 75

You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor. Which of these stakeholders will be responsible for writing the project scope?

Options:

A.

Business analyst

B.

Project manager

C.

Domain subject matter expert

D.

Sponsor

Buy Now
Questions 76

You need to identify assumptions as part of the assessment of capability gaps. Which of the following is an example of an assumption?

Options:

A.

The project manager believes that her project team members can program in COBOL.

B.

The software must be compatible with the current operating system.

C.

The risk in the project must be quantified.

D.

All vendors must have security clearance.

Buy Now
Questions 77

You are the business analyst for your organization. You are currently working with Susan on creating a model as part of the specify and model requirements process. Susan doesn't understand why you need a model. You explain to Susan that a model is just a simplified representation of a complex reality that is useful for understanding that reality and making decisions regarding it. In fact, you tell Susan, model can do all of the following except one option. Choose the option that model cannot do?

Options:

A.

Define the resources that will be needed on the project team

B.

Define boundaries for the business domain

C.

Describe a situation or problem

D.

Describe thought processes and action flows

Buy Now
Questions 78

You are the business analyst for your organization and you've identified a business need. In order to satisfy this business need, you believe that your organization will need to hire three electrical engineers, purchase equipment, and likely provide training to existing resources. What process is being described in this scenario?

Options:

A.

Communication needs

B.

Assessment of capability gaps

C.

Resource allocation

D.

Resource procurement

Buy Now
Questions 79

You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements. The following are the three categories of risk tolerance associated with the stakeholders except for which one?

Options:

A.

Neutrality

B.

Mitigation

C.

Risk-seeking

D.

Risk-aversion

Buy Now
Questions 80

In order to have high quality in requirements, all of the following characteristics should exist in the requirements except for which one?

Options:

A.

Cohesive

B.

Consistent

C.

Complete

D.

Constrained

Buy Now
Questions 81

You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year. What does the $300,000 represent?

Options:

A.

Budget

B.

Constraint

C.

Solution cost

D.

Requirements

Buy Now
Questions 82

There are five tasks and six inputs to requirements management and communication. As a business analyst, you'll need to gather all of the following inputs for this knowledge area except for which one?

Options:

A.

Requirement Management Plan

B.

Work breakdown structure

C.

Business Analysis (BA) communication plan

D.

Solution scope

Buy Now
Questions 83

You are a Business Analyst for your organization, and you're preparing to elicit requirements from stakeholders. You've gathered several inputs to help with the elicitation process. Which input will you use to ensure that you understand the type of information that should be elicited from stakeholders?

Options:

A.

Roles and Responsibilities

B.

Stakeholder List

C.

Business Need

D.

Risk Assessment

Buy Now
Questions 84

You are the business analyst for your organization and you're working with the key stakeholders to validate the requirements. In your review, you have determined the business value of each requirement and you've discovered three requirements that do not deliver direct or indirect value to the stakeholders. What should you do with these requirements?

Options:

A.

Determine their purpose in the requirements set.

B.

Justify their existence.

C.

See if the requirements are integrated with other requirements.

D.

Remove them from the requirements set.

Buy Now
Questions 85

You are the business analyst for your organization. You've believed that your solution can actually be purchased from outside vendor rather than trying to create the solution internally. You decide to ask the vendor to provide a fee for their services based on the statement of work. What document will you give the vendor along with the statement of work?

Options:

A.

Request for quote

B.

Contract terms

C.

Request for proposal

D.

Purchase order

Buy Now
Questions 86

Tracy is a business analyst for her organization and she's gathered and identified the needed requirements for the solution scope. What must Tracy do before she can begin managing the requirements? Choose the best answer.

Options:

A.

Tracy must decompose the requirements in WBS.

B.

Tracy must create cost-benefits analysis of each requirement to manage the benefits first.

C.

Tracy must identify roles, responsibilities, and owners of the requirements to fully manage the requirements.

D.

Tracy must communicate the requirements to the stakeholders for their consent and approval.

Buy Now
Questions 87

According to 'A Guide to the Business Analysis Body of Knowledge', when should the business analyst and an organization actually start requirements allocation?

Options:

A.

As soon as a budget has been created

B.

After approval of the requirements

C.

After the project charter

D.

As soon as the solution approach is determined

Buy Now
Questions 88

A business analyst is studying the cost of the endeavor in relation to the projected income the endeavor will bring once the project is completed. What financial valuation technique can the business analyst use to determine the breakeven point for the project?

Options:

A.

Payback period

B.

Average rate of return

C.

Cost-benefit analysis

D.

Discounted cash flow

Buy Now
Questions 89

Henry is the business analyst for the UUH Organization. Currently Henry is working on several work products as part of the requirements development process. He may need to share these work products with the stakeholders. Which of the following is not an example of a work product?

Options:

A.

Interview Questions and notes

B.

Presentation slides

C.

Meeting agendas and minutes

D.

Requirements documentation

Buy Now
Questions 90

In order to begin defining the solution scope, you'll need four inputs. Which one of the following is actually a task that will use the solution scope and is not an input?

Options:

A.

Required capability

B.

Assumptions and constraints

C.

Business need

D.

Allocation of requirements

Buy Now
Questions 91

A business analyst must consider the business value a solution brings in relation to the cost of implementing the desired solution. Suppliers will often be limited in the amount of requirements they can implement based on the allocated resources. If there are not enough resources to implement all of the solutions, what can the business analyst create to justify the additional funds for the implementation?

Options:

A.

Business case

B.

Cost analysis

C.

Risk assessment with positive risk analysis

D.

Benefits-cost ratio

Buy Now
Questions 92

Enterprise analysis creates just five outputs. Which one of the following is an output of the enterprise analysis tasks?

Options:

A.

Stakeholder concerns

B.

Solution approach

C.

Solution performance assessment

D.

Assumptions and constraints

Buy Now
Questions 93

There are three business analysis planning techniques that a business analyst can use to help plan business analysis processes. Which one of the following is not one of the three techniques?

Options:

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Buy Now
Questions 94

A company wants to increase its market share in the industry and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

Options:

A.

Redefine the business requirements associated with each implementation

B.

Recommend a reduction in the project scope

C.

Allocate requirements to different releases

D.

Ensure all requirements are traceable using a matrix

Buy Now
Questions 95

A business analyst (BA) is tasked with designing a method of ensuring that the requirements captured during the elicitation sessions satisfy the needs and expectations of the customer experience, within an initiative. The BA identifies a way that the stakeholder requirements can be structured to ensure realization of the desired customer experience. Which viewpoint describes the approach taken by the BA to structure the requirements?

Options:

A.

User interactions

B.

Business model

C.

Audit and security

D.

Business process model

Buy Now
Questions 96

A business analyst (BA) is working on a project involving the purchase of a commercial off-the-shelf (COTS) product. All internal risks have been identified and assessed. What is the BA's next course of action?

Options:

A.

Review the business objectives

B.

Consult the business case

C.

Assess external risks

D.

Perform an environmental scan

Buy Now
Questions 97

Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?

Options:

A.

Benefit

B.

Dependency

C.

Stability

D.

Risk

Buy Now
Questions 98

A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?

Options:

A.

Substantial

B.

Granular

C.

Prioritized

D.

Unambiguous

Buy Now
Questions 99

A business analyst (BA) is validating requirements and has found that the design cannot be validated to support the requirements. Which of the following is creating this situation?

Options:

A.

Incorrect assumptions.

B.

Lack of requirements traceability.

C.

Missing requirements.

D.

Substandard solution design.

Buy Now
Questions 100

A business analyst (BA) is conducting a workshop with the purpose of analyzing a business process. Stakeholders of different business units are in attendance. Each stakeholder is able to explain their unit's contribution to the process, however, there is no end to end process owner who can provide a consolidated view. Which technique should the BA use to compare the stakeholder's inputs against each other in order to check for consistency and omissions?

Options:

A.

Schedule a follow-up workshop to give more time for additional input

B.

Create a use case scenario that describes the process step by step

C.

Develop a process model with swimlanes to highlight the handoff points

D.

Create a logical data model with the information elicited

Buy Now
Questions 101

Verification of requirements on the projects have highlighted an issue regarding misunderstanding of design models among key stakeholders. A major reason cited for the misunderstanding was the technical jargon and models used in the documentation. What must the business analyst (BA) do to improve the understanding?

Options:

A.

Ensure completeness within the models used

B.

Verify that elements within the models are used consistently

C.

Represent design models using common terminology

D.

Check for compliance with organization standards

Buy Now
Questions 102

A business analyst (BA) has documented the components of an information technology (IT) library, in preparation for establishing a consolidated catalogue of IT services. When interviewed, several of the IT managers indicated they already have a catalogue, and have no additional information to provide. What activity is necessary to support the project?

Options:

A.

Analyze existing catalogues

B.

Confirm the project objectives

C.

Expand the interview list

D.

Conduct a focus group

Buy Now
Questions 103

Due to a change in regulation, a solution being implemented has a new compliance requirement that must be evaluated. The requirements change strategy focuses on total cost of change as the primary driver for decisions. The business analyst (BA) compiled the following impact assessment of the proposed change based on the new compliance requirement.

What recommendation should the BA make to the stakeholders based on the above information?

Options:

A.

Approve the requirement

B.

Request additional information

C.

Defer the requirement

D.

Reject the requirement

Buy Now
Questions 104

A business analyst (BA) was asked to send the requirement details to the project manager (PM), director, vice president (VP), and Chief Information Officer (CIO). The BA shares the complete set of requirements to the PM and director, while creating a summarized version for the VP and CIO. Which aspect of requirement specification and modeling was the BA performing?

Options:

A.

Perform stakeholder analysis

B.

Organize requirements categories

C.

Determine approval authority

D.

Implement appropriate level of abstraction

Buy Now
Questions 105

A business analyst (BA) has elicited requirements for a new system. A subset of these requirements refers to judging the performance of the system, such as efficiency, capacity, security, and scalability. What technique is used to examine and group these requirements?

Options:

A.

Functional decomposition

B.

Scope model

C.

Trace requirements

D.

Non-functional requirements analysis

Buy Now
Questions 106

A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?

Options:

A.

Performed decision analysis

B.

Identified assumptions

C.

Prepared activity diagrams

D.

Analyzed completeness

Buy Now
Questions 107

The business analyst (BA) recommended a new application be rolled out in phases. After reviewing alternatives, the project sponsor agreed. What does the BA expect to achieve by this approach?

Options:

A.

Increase stakeholder engagement

B.

Maximize allocation

C.

Maximize benefits

D.

Increase process validation

Buy Now
Questions 108

During a requirements elicitation workshop, a stakeholder raises an issue that is outside of the project's scope. The business analyst (BA) facilitating the workshop should:

Options:

A.

note the issue in the Issue Register to be considered by the Project Manager.

B.

ignore the stakeholder's comment and proceed with the agenda.

C.

consider the issue's impact on the project and gain agreement with stakeholders on the next step.

D.

request the stakeholder to explain the issue further so that possible solutions can be discussed.

Buy Now
Questions 109

A business analyst (BA) has been spending the majority of the past week cataloguing the new, removed, and modified components of an upcoming project. What is the main purpose of the BA performing this work?

Options:

A.

To establish the key performance indicators

B.

To define the future state

C.

To identify the domain subject matter expert

D.

To document the current state

Buy Now
Questions 110

A business analyst (BA) was asked by the vice president (VP) to evaluate the organization's claims processing capability and recommend improvements. The VP agreed to the BA's recommended solution approach and identified an external vendor to develop the modernized claims processing system. Before contracting with the external vendor, the BA realized that the budget should be approved by the Chief Financial Officer. What was missed by the BA when performing stakeholder analysis?

Options:

A.

Attitude

B.

Roles

C.

Decision making authority

D.

Level of influence

Buy Now
Questions 111

A business analyst (BA) begins to suspect that the ongoing elicitation activities with stakeholders are not delivering the quality of business analysis information required due to a lack of stakeholder participation. What type of technique can the BA adopt to resolve this type of issue?

Options:

A.

Stakeholder Engagement

B.

Roles and Permissions Matrix

C.

Requirements Validation

D.

Risk Analysis and Management

Buy Now
Questions 112

A business analyst (BA) is developing the requirements for an inventory management system. Some current accounting processes are automated but other departments like purchasing, marketing, sales and distribution departments work in isolation and have a manual process. They extensively use spreadsheets to maintain the transactions and at the end of the day the department managers manually verify and reconcile transactions before supplying the information to the accounting department. In order to verify and validate the elicited requirements, the BA will need to prepare a:

Options:

A.

single process model on automation for all stakeholders.

B.

database structure in the viewpoint of the selected stakeholders

C.

list of requirements in a spreadsheet for all stakeholders.

D.

set of process models in the viewpoint of the selected stakeholders.

Buy Now
Questions 113

The business analyst (BA) has documented the requirements for a new system and is preparing the requirements for approval. Which of the following helps ensure that requirements are fully understood and traceable?

Options:

A.

Requirements are extracted for review

B.

Requirements are properly classified

C.

Requirements are validated

D.

Requirements meet regulatory standards

Buy Now
Questions 114

A one-location restaurant has been a huge success and the owner wants to expand into more markets. The owner wants to ensure that the quality of the food and pleasing atmosphere is maintained without introducing new variables. Working with the key members of the organization, the owner determines that training and standard processes must be defined. The owner engages a business analyst (BA) to create training materials and operating procedures based on the existing processes at the original restaurant. During this documentation, the BA identifies some opportunities for improvement. How must the BA proceed?

Options:

A.

Schedule time with the owner to review any opportunities to improve existing processes and obtainpermission to include changes before documenting

B.

Create documentation based on the observed processes because improvements are outside of the scope of the project

C.

Provide documentation of improved procedures based on the observed opportunities for then new location

D.

Perform benchmarking and market analysis to determine whether there are standard procedures in the restaurant industry that support the opportunities identified

Buy Now
Questions 115

A business analyst (BA) identifies a design option that enhances the performance of the business by automating repetitive tasks that require multiple staff touchpoints to complete a single task. Which type of improvement opportunity is identified by the BA?

Options:

A.

Identify additional capabilities

B.

Increase efficiencies

C.

Reduce costs

D.

Improve access to information

Buy Now
Questions 116

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicate whether or not the solution is contributing to the desired value. What is the recommended next step?

Options:

A.

Replace the solution as soon as possible

B.

Identify and collect more measurements

C.

Increase the efficiency of the solution

D.

Reduce the business' expectations of value

Buy Now
Questions 117

The business analyst (BA) assigned to support a legacy system has developed a customer survey to assess its usability. Before distributing the survey, what should the BA do?

Options:

A.

Validate the survey with the project sponsor

B.

Observe customer interaction with the system

C.

Review the risk register with the project sponsor

D.

Update the project plan to include the survey

Buy Now
Questions 118

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

Options:

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Buy Now
Questions 119

The business analysis (BA) team is evaluating a new commercial off-the-shelf (COTS) application that will be implemented in the coming months. The company has over 20 legacy systems deployed. The Chief Information Officer (CIO) is worried about the need for integration and that some key linkages are missing.

What is the BA team evaluating?

Options:

A.

Technology and infrastructure

B.

Industry standard architecture

C.

Service oriented architecture

D.

Business architecture

Buy Now
Questions 120

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

Options:

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Buy Now
Questions 121

A business analyst (BA) is informing stakeholders about the importance of quality when eliciting requirements. What characteristic describes a quality requirement?

Options:

A.

Simplistic

B.

Consistent

C.

Critical

D.

Functional

Buy Now
Questions 122

An organization prefers to execute projects using an adaptive approach. However, the new project is much more complex than previously executed projects. What will the business analyst (BA) recommend?

Options:

A.

Select an extreme programming approach

B.

Review current approach with key stakeholders

C.

Follow a predictive approach

D.

Choose an agile programming approach

Buy Now
Questions 123

A business analyst (BA) creates the following diagram as part of current state analysis activities.

What does a diagram of this type help users to understand?

Options:

A.

Decision-making

B.

Regulatory compliance

C.

Business capability

D.

Process improvement

Buy Now
Questions 124

A business analyst (BA) has decided to use a passive/unnoticeable job shadowing elicitation approach. What is an advantage of using this technique?

Options:

A.

Experiencing the performance of the task in a hands-on approach

B.

Obtaining the opinions of the performers without management interfering

C.

Gaining clarity in the process by asking Questions of the performer as it is being performed

D.

Identifying instances of informally performed tasks as well as any workarounds

Buy Now
Questions 125

A large online retailer is introducing new technology to upgrade its aging ordering process. The business analyst (BA) has drawn a stakeholder matrix showing information on how to engage with the stakeholders throughout the project.

Using the stakeholder matrix as a guide, how should the BA engage the suppliers?

Options:

A.

Meet with the suppliers to discuss their needs

B.

Ensure the suppliers are kept informed by showing interest in their needs

C.

Communicate changes to the suppliers by general communication

D.

Focus efforts to engage with the suppliers regularly

Buy Now
Questions 126

A business analyst (BA) is planning the requirements attributes. The BA received a long list of requirements that must be implemented in different phases. Which requirements attribute can the BA include to allocate the requirements to the proper phase?

Options:

A.

Status

B.

Author

C.

Priority

D.

Source

Buy Now
Questions 127

A business analyst (BA) working with a large insurance corporation interviewed an industry thought leader who predicted that many of the regulations currently imposed by the government will change very soon. The BA carefully documented all these inputs from the thought leader because it will impact many of the strategic initiatives of the insurance company. What specific element of requirement validation is being executed by the BA?

Options:

A.

Identify constraints

B.

Define measurable evaluation criteria

C.

Identify assumptions

D.

Evaluate alignment with solution scope

Buy Now
Questions 128

During the analysis, synthesis, and refinement of elicitation results the business analyst (BA) has discovered that some information is missing. Which course of action would resolve the situation?

Options:

A.

Verify the requirements results

B.

Conduct elicitation activities

C.

Conduct traceability analysis

D.

Validate the requirements

Buy Now
Questions 129

A global organization is implementing a new Knowledge Management System and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?

Options:

A.

Repository

B.

Document management

C.

Email

D.

Individual collaboration

Buy Now
Questions 130

A new payments system was recently implemented to replace an old legacy system. The system users have lodged a complaint that the new system is slower than the old system but system performance statistics show more efficiency. How does the business analyst (BA) demonstrate to users how the new system is performing?

Options:

A.

Collect system metrics and communicate results in an understandable format

B.

Identify the dependencies of the system with other applications

C.

Analyze the feasibility of including additional hardware resources to the system

D.

Evaluate the payments process to identify areas of improvement in the system

Buy Now
Questions 131

A business analyst (BA) is in the process of eliciting requirements. It has been determined that not all requirements can be implemented by the project deadline due to complexity. What must the BA do to ensure maximum benefit for the stakeholders?

Options:

A.

Ensure users are trained based on requirements

B.

Apply quality control on requirements

C.

Utilize requirements documentation template

D.

Maintain requirements based on priority

Buy Now
Questions 132

Before beginning requirements elicitation, a business analyst (BA) has planned the necessary activities, identified needed stakeholders, and documented this in the Business Analysis Plan. Which approach will help the BA ensure that stakeholders are available when required?

Options:

A.

Talk to the stakeholders' managers to ensure the resources will be available

B.

Send meeting invitations well in advance so stakeholders can plan in time

C.

Conduct a review of the plan with the stakeholders and adjust according to the feedback received

D.

Request an introduction letter from the business sponsor highlighting the importance of the initiative

Buy Now
Questions 133

Market studies projected a 28% year over year growth for five (5) years for commercial vehicle loans. A company that provides lending for commercial vehicles wanted to keep up with industry demand; however, their applications were not capable of scaling to the increased demand for loan processing and billing. The company is deploying a new system to meet the demand. The project started five (5) years ago and cost S2 million USD. The project metrics are to be evaluated after five (5) years. The return on investment (ROI) for the project is calculated at 11%. The project sponsors are upset that the desired ROI for the project was not met. The actual demand for commercial vehicle loans for the past five (5) years is as follows:

Options:

A.

Risk planning

B.

flowed assumptions

C.

Demand forecasting

D.

Capability planning

Buy Now
Questions 134

Project work is taking place to evaluate whether a system's requirements can be met via creating internally, purchasing from others, or a combination of the two. What goal is addressed by this analysis?

Options:

A.

Developing the project plan

B.

Outlining the change control strategy

C.

Defining the solution approach

D.

Validating the requirements

Buy Now
Questions 135

For a new account payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

Options:

A.

“The solution will send payment notification to the account holder after successful processing

B.

“The solution will report the average number of days an account payment is outstanding”

C.

“The solution will reduce the payment processing time from three days to two days”

D.

“The solution will enable account holders to make account payments via a web form”

Buy Now
Questions 136

As a business analyst, you must identify activities in your business analysis approach. Which one of the following is useful for identifying activities?

Options:

A.

Project management input

B.

BABOK

C.

A list of deliverables

D.

WBS

Buy Now
Questions 137

There are four inputs to the plan business analysis activities. Which one of the following is not an input to the plan business analysis activities process?

Options:

A.

Stakeholder list, roles, and responsibilities

B.

Organizational process assets

C.

Business analysis approach

D.

List of identified risks

Buy Now
Questions 138

Stakeholders must be able to determine the audit and approval history of requirements and designs. Which of the following provides a means to document traceability and change?

Options:

A.

Risk analysis and management

B.

legal and regulatory information

C.

Requirements management tools

D.

Acceptance and evaluation criteria

Buy Now
Questions 139

An organization's board of directors has funded a new mobile application to support external customers. The business case was developed with emphasis on objectives to broaden the organization's brand and increase customer engagement. The business analyst (BA) is reviewing a group of user stories with the product owner. One of these user stories is: "As a customer service representative, I need to enter my time on the mobile application so that I can leave work to pick up my sick daughter from school". The product owner wants to take advantage of this opportunity to provide the staff a way to enter their time away from the office and create an interface to the Payroll application. How must the BA evaluate alignment with the existing scope?

Options:

A.

Add me functionality to the list of requirements

B.

Suggest that the story be included with a change to solution scope or be removed

C.

Ask product owner to rank this user story against the existing product backlog

D.

Review business objectives and determine potential value

Buy Now
Questions 140

Which of the following defines all of the required work to satisfy the requirements of the project?

Options:

A.

Project scope

B.

Requirements envisioning

C.

Requirements foundation

D.

Product scope

Buy Now
Questions 141

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

Options:

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Buy Now
Questions 142

What tool is best described as a spreadsheet to use when there's a relatively low amount of requirements that need to be traced?

Options:

A.

Roles and responsibilities chart

B.

Quantitative matrix

C.

Coverage matrix

D.

RACI Chart

Buy Now
Questions 143

The business analysis deliverables went through a formal performance review process. The performance report stated that changes to the business analysis approach must be made in order to maximize the project's chances of success. Who must be consulted regarding these changes before they are implemented in this project?

Options:

A.

The project manager

B.

The lead developer

C.

The enterprise architect

D.

The subject matter expert

Buy Now
Questions 144

In a project meeting, stakeholders presented conflicting views on how the business analysis process should be conducted, leading to the sponsor becoming very upset. If a similar situation arises in the future, what can the business analyst (BA) do to avoid the situation?

Options:

A.

Communicate with each stakeholder individually

B.

Obtain stakeholder signoff on the approach

C.

Develop a cleaner RACI matrix

D.

Obtain approval for the business case

Buy Now
Questions 145

A change is desired in a project after the requirements are signed off and after technical design has started. The stakeholders want an additional product to be developed as part of the project. What tool can be used by the business analyst (BA) to assess the impact of the change?

Options:

A.

Concept modelling

B.

Requirements architecture

C.

Backlog management

D.

Balanced scorecard

Buy Now
Questions 146

A business analyst in her organization has identified all of the terminology of the solution, the acronyms the organization will use, and the nomenclature of her department where the endeavor will take place. Where should all of this information actually be stored?

Options:

A.

WBS

B.

Business analysis register

C.

Terminology register

D.

Data dictionary

Buy Now
Questions 147

Complete this sentence. If a requirement cannot be verified, it cannot be successfully.

Options:

A.

Scheduled

B.

Estimated

C.

Assigned

D.

Implemented

Buy Now
Questions 148

The project plan called for deliverables to be handed over at the end of the project. Although the client's business team was satisfied, the client's technical team was extremely resistant to this approach. What could the business analyst (BA) do to mitigate the technical team’s resistance?

Options:

A.

Escalate to project sponsor

B.

Meet with technical team

C.

Reassess the project objectives

D.

Email the business team

Buy Now
Questions 149

You are the business analyst for your organization and you've been working with several stakeholders to

gather requirements for approval.

The requirements have been approved with the exception of a conflict on one requirement. What must you and the stakeholders do in regard to this conflict before the business analysis endeavor may continue?

Options:

A.

The requirement with the conflict should be excluded from the approved set of requirements and must be resolved before it can be joined to the approved set of requirements.

B.

The conflict must be documented as a risk.

C.

The conflict must be resolved before the set of requirements may be approved.

D.

The conflict must be documented in an issues log, assigned to an issue owner, and then the endeavor may continue.

Buy Now
Questions 150

All of the following statements are true regarding a brainstorming session during requirements elicitation except for which one?

Options:

A.

All ideas should be visibly recorded.

B.

The number of ideas should not be limited.

C.

The ideas should be generated with a cost or time estimate.

D.

All ideas should be shared without any discussion, criticism, or evaluation.

Buy Now
Questions 151

Which approach is used to focus on minimizing up-front uncertainty?

Options:

A.

Class-driven approach

B.

Change driven approach

C.

Solution-driven approach

D.

Plan-driven approach

Buy Now
Questions 152

You are the business analyst for your organization and you're creating a business analysis communication management plan. In your plan, you want to address the different locales and culture and the communication needs that may affect the business analysis approach. Which one of the following elements should not be included in the cultural analysis of the plan?

Options:

A.

Relationship to task completion

B.

Relationship to authority

C.

Relationship to religion

D.

Relationship to time

Buy Now
Questions 153

A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise's vision, mission and goals. What element of ‘SMART’ goals would this objective refer to?

Options:

A.

Relevant

B.

Measureable

C.

Specialized

D.

Achievable

Buy Now
Questions 154

Ralph is a business analyst for his organization and he's using the plan-driven approach for business analysis. Ralph has captured the requirements of the project, but what must happen before he can begin capturing and defining the requirements at a deeper level of detail?

Options:

A.

The initial requirements must be tested for time, cost, quality, and risk.

B.

The initial requirements must undergo a feasibility study.

C.

The initial requirements must be formally approved by the stakeholders.

D.

The initial requirements must pass through the Delphi Technique.

Buy Now
Questions 155

You are the business analyst for an organization and you're managing your stakeholders through the requirements validation activities. Your stakeholders are categorized by executives, functional managers, directors, end users, and customers. Which of these stakeholders are involved in the requirements validation

activities?

Options:

A.

All of the stakeholders

B.

Functional management

C.

Executives

D.

Customers

Buy Now
Questions 156

According to the book 'A Guide to the Business Analysis Body of Knowledge', effective business analysis practices can do what to the amount of change to requirements in a stable business environment?

Options:

A.

Reduce the amount of change, but not eliminate entirely.

B.

Document the changes to requirements.

C.

Control the frequency of the change.

D.

Eliminate the change entirely.

Buy Now
Questions 157

Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?

Options:

A.

Brainstorm the business need.

B.

Create a data diagram for the service.

C.

Define the business need.

D.

Elicit the requirements of the proposal.

Buy Now
Questions 158

The creative thinking process has three values to determine the effectiveness of the process. Which one of the following is not a measurement of effective creative thinking?

Options:

A.

Willingness of stakeholders to accept new approaches

B.

Generation of a pre-determined number of new ideas for a business solution

C.

Application of new ideas to resolve existing problems

D.

The successful generation and productive consideration of new ideas

Buy Now
Questions 159

As a business analyst, you need to define when the activities of the business analysis approach will take place. This includes all of the following business analysis approach activities except for which one?

Options:

A.

Requirements analysis

B.

Solution assessment

C.

Business analysis governance

D.

Enterprise analysis

Buy Now
Questions 160

Which one of the following statements best describes requirements prioritization?

Options:

A.

It is only used with the plan-driven approach to business analysis.

B.

It is only used with the change-driven approach to business analysis.

C.

It determines how requirements will be prioritized based on the most important stakeholders to the least important stakeholders.

D.

It determines how requirements will be prioritized and how those priorities will be used to define the solution scope.

Buy Now
Questions 161

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex. What thing adds to the level of complexity among requirements?

Options:

A.

Relationships among the requirements

B.

Management in the project

C.

Cost and schedule constraints

D.

Stakeholders in the project

Buy Now
Questions 162

Anne is the business analyst for her organization and she's creating a textual requirement for her analysis. As part of the textual requirements, there are specific rules that Anne should follow. Textual requirements must always address what three things in regard to the requirements?

Options:

A.

Textual requirements must define the capabilities of the solution, conditions that must exist for the requirements to operate, and any constraints that may hinder the solution.

B.

Textual requirements must define the cost of the solution, organizational conditions that must exist for the requirements to operate, and any risks that may hinder the solution.

C.

Textual requirements must define the stakeholders' influence on the solution, relationships between opposing stakeholders, and any organizational constraints that may hinder the solution.

D.

Textual requirements must define the deliverables created by the solution, the conditions that must exist for the requirements to be completed, and the time and cost constraints that may hinder the solution's implementation.

Buy Now
Questions 163

Linda works as a project manager for an IT project. She is getting new developers for completing her project. Which of the following processes is she involved in?

Options:

A.

Manage Project Team

B.

Develop Project Team

C.

Acquire Project Team

D.

Human Resource Planning

Buy Now
Questions 164

You are the business analyst for your organization and you're creating a data flow diagram to show how

information is input, processed, stored, and output from a system. Which element of a data flow diagram represents a process that transforms data by combining it with other data?

Options:

A.

Data flow

B.

External entities

C.

Data process

D.

Concatenation

Buy Now
Questions 165

You are the business analyst for your organization. Management has asked that you create a method to store the project requirements including those under development, under review, and the requirements which have been approved. What is management asking you to create?

Options:

A.

A change management system

B.

A repository

C.

Requirements register

D.

A project scope statement

Buy Now
Questions 166

By which of the following is the performance of all requirements management and communication activities governed?

Options:

A.

Business analysis plans

B.

Business analyst

C.

Project manager

D.

Project sponsor

Buy Now
Questions 167

Complete this sentence in regard to the level of abstraction. Requirements need to sayneeds to be done, notto do it.

Options:

A.

What, when

B.

Requirements, who needs

C.

What, how

D.

Requirements, how much

Buy Now
Questions 168

A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company's needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?

Options:

A.

Negative Impact to value

B.

Positive Evaluation Results

C.

Risk Tolerance

D.

Issue Management

Buy Now
Questions 169

A deployed loan product was funded with the expectation of prepayment risk reduction. Initially key performance indicators would be to take similar loan prepayment rates over the previous 10-year period and compare it with the new product. After implementation, the business analyst (BA) determines that the decade old housing market is vastly different. Which of the following should the BA consider for validity of performance measures?

Options:

A.

Currency

B.

Timing

C.

Sample size

D.

Frequency

Buy Now
Questions 170

A business analyst (BA) has been tasked with examining and analyzing the relationship between a set of requirements by verifying that they are unambiguous. What will the BA be looking for?

Options:

A.

That the relationship is necessary for understanding the requirements holistically.

B.

That relationships are described in the same way, using the same set of standard descriptions.

C.

That there is a genuine relationship and that the type of relationship is described.

D.

That there are no relationships that link elements in two different and conflicting ways.

Buy Now
Questions 171

A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?

Options:

A.

Substantial

B.

Prioritized

C.

Unambiguous

D.

Granular

Buy Now
Questions 172

A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?

Options:

A.

Facilitate a focus group with users to get feedback

B.

Choose an appropriate format to communicate requirements

C.

Consider business relevance while tracing requirements

D.

Ensure test scenarios align to business requirements

Buy Now
Questions 173

A company wants to increase its market share in the industry, and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off, and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

Options:

A.

Allocate requirements to different releases

B.

Recommend a reduction in the project scope

C.

Ensure all requirements are traceable using a matrix

D.

Redefine the business requirements associated with each implementation

Buy Now
Questions 174

An organization has identified a market opportunity that could result in significant business gains. A business analyst (BA) is asked to assist in building the new business model. The BA begins by analyzing the current state. What input is critical to the current state analysis?

Options:

A.

Organizational culture

B.

Risks and assumptions

C.

Goals and objectives

D.

Business needs

Buy Now
Questions 175

A new regulation results in organizations needing to change online contractual wording. A business analyst (BA) has elicited the requirements and documented them in a change control request. Where will the BA find out which stakeholder has the authority to approve, deny, or defer the change request?

Options:

A.

Information management

B.

Business analysis approach

C.

Governance approach

D.

Stakeholder engagement approach

Buy Now
Questions 176

A project manager (PM) is planning the project timelines along with a business analyst (BA), and they come across the task of requirement allocation. The PM wants to know what the dependencies are before the requirement allocation task is initiated and seeks the BA's advice. Which of the following is a dependency that the BA will highlight as a prerequisite for requirement allocation?

Options:

A.

Design options are available

B.

Solution approach has been determined

C.

Requirements architecture is approved

D.

Stakeholders are identified

Buy Now
Questions 177

A business analyst (BA) has completed multiple workshops involving a number of stakeholders, including the project manager; however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

Options:

A.

The BA should model the elicited requirements in a review meeting.

B.

The project manager should decide which requirement is relevant.

C.

The project manager should model the elicited requirements in a review meeting.

D.

The BA should select which requirements are correct.

Buy Now
Questions 178

A business analyst (BA) is working on a project to revise the way a company bills its customers. At the end of the project, the BA creates the following matrix:

Options:

A.

Stakeholder analysis

B.

Root cause analysis

C.

Business capability analysis

D.

Strategy analysis

Buy Now
Questions 179

The business analyst (BA) is investigating techniques that would be appropriate for determining how and who uses data across the identified processes. Which technique should the BA select?

Options:

A.

CRUD (Create, Read, Update, and Delete) matrix

B.

Stakeholder list, map, or personas

C.

Data dictionary

D.

Decision model

Buy Now
Questions 180

The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?

Options:

A.

Demonstrate the functionality of the new CRM

B.

Create merged viewpoints of the requirements

C.

Ensure all regulatory requirements are documented

D.

Reuse requirements models from each company

Buy Now
Questions 181

A business analyst (BA) is working on a project to implement a commercial off-the-shelf (COTS) application for tracking customers. In an observation session with a domain subject matter expert (SME), the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

Options:

A.

Potential to provide future value supported by the system

B.

Ability to provide greater amounts of information to staff

C.

Elimination of duplicate tasks performed by staff

D.

Automation to increase consistency of behavior

Buy Now
Questions 182

The director of a furniture store manages a group of skilled carpenters who make furniture from locally available materials. The director decides to automate its inventory processes so that the carpenters can place orders for raw materials themselves. A business analyst (BA) is engaged to define the requirements and propose options for commercial off-the-shelf (COTS) inventory management solutions. After meeting with the director, the BA needs to schedule a workshop with the carpenters to:

Options:

A.

Investigate whether automation is a constraint for the end users.

B.

Demonstrate some of the proposed solutions to end users.

C.

Convey the benefits of the automation to the end users.

D.

Present the proposed future state to the end users.

Buy Now
Questions 183

After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?

Options:

A.

Adaptive development process

B.

Crystal clear development process

C.

Kanban development process

D.

Predictive development process

Buy Now
Questions 184

A business analyst (BA) plans to organize a focus group to bring all the interested parties together and discuss the issues and possible risks for the new initiative. Due to the geographical differences of each participant, a videoconferencing service will be used to satisfy stakeholder preferences. Which approach is the BA defining?

Options:

A.

Issue management

B.

Release planning

C.

Stakeholder collaboration

D.

Stakeholder analysis

Buy Now
Questions 185

A project is being initiated to enhance an online product because sales have declined for over a year. The company leaders are confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase, and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

Options:

A.

Identifying the stakeholders

B.

Implementing a suitable solution

C.

Documenting the requirements

D.

Evaluating the business need

Buy Now
Questions 186

A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company's risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors. What is the company's attitude toward risk, as assessed by the BA?

Options:

A.

Risk-optimizing

B.

Risk-neutral

C.

Risk-averse

D.

Risk-seeking

Buy Now
Questions 187

A business analyst (BA) is given an additional requirement near the end of the development phase that needs to be incorporated into the system as part of the same release. In this situation, the first activity the BA performs to understand the effect of the proposed change is to:

Options:

A.

Check with the project manager for timeline and budget metrics.

B.

Determine whether stakeholders are available for further elicitation.

C.

Determine whether the additional requirement is traceable to a need.

D.

Consult with the technical team for technical feasibility.

Buy Now
Questions 188

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) update in the stakeholder requirements?

Options:

A.

Requirement attribute values

B.

Scope model

C.

Requirement description

D.

Requirement performance measures

Buy Now
Questions 189

A company has bought a customizable software product, and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?

Options:

A.

Create a process model

B.

Review data flow diagrams

C.

Develop a data model

D.

Observe the activity

Buy Now
Questions 190

A new product that is tablet-enabled is being considered to replace an older product to process orders. The data captured is sent to existing downstream applications, which are not being updated. What is the first thing that a business analyst (BA) should consider?

Options:

A.

Developing process and data models

B.

Performing an interface analysis

C.

Conducting a vendor assessment

D.

Identifying constraints and dependencies

Buy Now
Questions 191

Management comes to you and asks you to complete some specifications and models about the current state of the organization.

Management wants you to complete this business analysis activity as soon as possible and report back to them with your findings. What is the primary purpose of the specify and model requirements process?

Options:

A.

To analyze the roles and responsibilities of users within the organization to determine how the processes may be improved.

B.

To analyze the utility function within the organization to determine how risk tolerance may allow for new opportunities.

C.

To analyze the functioning of an organization and to provide an insight into opportunities for improvement.

D.

To analyze the processes of an organization to determine what processes can be improved, removed, or added.

Buy Now
Exam Code: CCBA
Exam Name: Certification of Capability in Business Analysis (CCBA)
Last Update: Apr 30, 2025
Questions: 638
CCBA pdf

CCBA PDF

$25.5  $84.99
CCBA Engine

CCBA Testing Engine

$30  $99.99
CCBA PDF + Engine

CCBA PDF + Testing Engine

$40.5  $134.99