Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?
An Implementation Engineer attempts to add a FlashArray to a Fusion fleet but receives an error indicating the array cannot be added. The array appears healthy and is connected to Pure1.
What is the most likely cause of this issue?
A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack.
What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?
A customer's management network connectivity is NOT available at the time of array deployment. Which switch should an Implementation Engineer use to avoid those checks during puresetup flow?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?
During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct.
What is a likely cause of this failure?
After completing planned maintenance, what command should the Implementation Engineer run to verify connectivity to pure services?
Which command should the Implementation Engineer run to verify that Remote Assist is working properly?
An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS). What action should the Implementation Engineer perform?
Which command should an Implementation Engineer use to allow Support access to an array?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support. What action should the customer take?
The Pure Engagement Request (PER) specifies that iSCSI ports ETH2 and ETH3 should be set to 10 Gb/s. After configuring the ports and connecting them to the SAN, the Implementation Engineer observes that ETH2/3 are not negotiating and display 0 b/s. The SAN is operating at 40 Gb/s, with support for up to 100 Gb/s.
What should the Implementation Engineer do to resolve this issue and complete the install?
During a deployment, an Implementation Engineer attempts to name a FlashArray corporate Lab-0L, but the array rejects the name. What is the reason for the failure?
An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks.
After rebooting the controllers, which user account should the Implementation Engineer use to log in?
An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis.
What type of controller is required to complete the upgrade?
After performing a hardware upgrade from an //M20R2 to a //X20R3-EMEZZ, a customer wants to add a Direct Flash Modules data pack to replace the existing SAS Chassis Data Packs (2x 20TB DPs). What extra hardware is required?
When adding a data pack into a FlashArray chassis or a DFS shelf, the drives show "unrecognized" status when running List. What is the cause of this status on the newly inserted drives?
A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?
Which command should the Implementation Engineer run to remove a tunable from the primary controller?
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?
What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?
An Implementation Engineer is performing a FlashArray//X to FlashArray//XL HWNDU. After rebooting a controller, the new controller fails to reach a ready state. Which command should the Implementation Engineer run to resolve the issue?
At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?
For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity.
How will this affect the installation process?
Once the new Purity firmware has been installed using the pureinstall command, what step is required to commit the new version?
Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?
Which command should the Implementation Engineer run to set the maintenance tag?
Which Pure1 app functionality requires that a user is on their internal company network?
A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?
On a FlashArray//XR4, which port is enabled for the management service by default?
During a hardware NDU from FlashArray//XR2 or XR3 to an XR4 model, which default service on-board ports are NO longer present in the XR4 controller design?
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?
During a FlashArray//X to FlashArray//XL hardware upgrade, when should the Implementation Engineer insert the DFMd modules into the FlashArray//XL?
What command should the Implementation Engineer run to view NVRAM install and update status?
FlashArray//C and //E models use which flash storage architecture, identifiable by gray tabs on the DirectFlash Module carriers?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.
What action should the customer take?
An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Personality Mode).
What is the next step the Implementation Engineer should take to continue the upgrade?
An Implementation Engineer is onsite to add a new 91TB (10 x 9.1TB) data pack to a FlashArray that includes a DirectFlash Shelf. The chassis currently contains two write groups, one 45TB (10 x 4.5TB) and one 91TB (10 x 9.1TB). The shelf contains a single 45TB (10 x 4.5TB) write group. The customer requests that the new data pack be added as part of a wide write group. How should the Implementation Engineer meet this request?
When accessing the FlashArray GUI, which management IP address is recommended for use?
When adding a data pack into a FlashArray chassis or a DFS shelf, the drives show "unrecognized" status when running puredrive list.
What is the cause of this status on the newly inserted drives?
Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?
Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?
Which action should an Implementation Engineer take to confirm that all volumes connected to a host are automatically in a protection group?
When configuring File Services, which service type must be assigned to the virtual network interface in the purenetwork configuration?
By default, which network interface does FA File use to resolve and reach domain controllers?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.
What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?
During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?