A major distributor experiences difficulty in establishing an inventory replenishment methodology. Which segmentation approach is not possible with Replenishment Planning?

Options:

A.

to group items based on item attributes for the product and customer dimensions and then assign a replenishment policy to each group

B.

to group items based on user-defined attributes and then assign a replenishment policy to each group

C.

to group items based on similar global consumption levels and then assign a replenishment policy to each group

D.

to group items based on similar consumption levels by warehouse and then assign a replenishment policy to each group

Buy Now
Questions 5

Which two statements are true about the seeded (predefined) Contract Manufacturing roles? (Choose two.)

Options:

A.

Users with the Supply Chain Operations Manager role can access the Supply Chain Collaboration work area.

B.

Users with the Contract Manufacturer role can access the Supplier Portal to upload their production updates.

C.

Users with the Supplier Inventory Manager role don't need access to the Supplier Portal because they already have access to the Supply Chain Collaboration work area.

D.

Users with the Supply Chain Operations Manager role need access to the Supplier Portal to see their updates and what's in progress.

E.

Users with the Supplier Inventory Manager role can access the Supplier Portal.

Buy Now
Questions 6

Which two statements are true when using Measure catalogs? (Choose two.)

Options:

A.

The predefined measure catalog is not the system default.

B.

The measure catalog has a collection of measures that you can enable for use in a single plan in the Planning Central work area.

C.

You can restrict access to Measure Catalogs using Administer Data Security.

D.

You can add or remove measures from a measure catalog.

E.

Measure catalogs are defined in the system to improve the performance of the plan.

F.

You navigate to Configure Measure Catalogs to edit the Catalog.

Buy Now
Questions 7

You have created several infotiles based on the client requirements. You now want to group them together for display. How do you accomplish this?

Options:

A.

First build them into an info set in Manage Infosets. Then open the info set on the plan by going to Open (choose area) > Choose info set.

B.

No need to group them. Open them directly on the plan going to Open (choose area) > Choose Infotile.

C.

First build them into a tile set in Manage Table, Graphs, and Analysis Sets. Then open the tile set on the plan by going to Open (choose area) > Choose tile set.

D.

First build them into a planning group in Manage Planning Groups. Then open the planning group on the plan by going to Open (choose area) > Choose planning group.

E.

First build them into a planning measure in Manage Planning Measures. Then open the planning measure on the plan by going to Open (choose area) > Choose planning measure.

Buy Now
Questions 8

Planners are complaining about getting too many exception messages, some of which have minima value for evaluating plan health.

Which three solutions could reduce message clutter? (Choose three.)

Options:

A.

Go to Configure Exceptions, and specify a threshold for various messages.

B.

Go to Configure Exception Sets, and for the currently used exception set. specify a threshold for various messages.

C.

Go to Configure Exception Sets, duplicate the currently used exception set, remove the undesired messages from the duplicate set. then assign the duplicate set to all plans.

D.

Go to Configure Exception Sets, create a new set with only the messages the planners care about, and then, set all supply plans to use this new exception set.

Buy Now
Questions 9

Your Manufacturing Organization makes bicycles and ships 50% of its output directly to large chain retailer customers. Your organization also ships products to your Distribution Center so that it can fulfill many other smaller customers. Your Manufacturing Organizations uses Oracle SCM Planning Cloud, but your Distribution Center does not.

Which setups should you recommend to the Manufacturing Organization?

Options:

A.

In Edit Plan Options, ensure both organizations are included in plan scope, and select, 'include transfer orders'.

B.

Map the Distribution Center as a customer in Maintain Supply Network Model; Select 'include transfer orders' in Edit Plan Options.

C.

Map the Manufacturing Organization as a supplier in Maintain Supply Network Model; Select 'Include transfer orders' in Edit Plan Options.

D.

Select 'include transfer orders' in Edit Plan Options' advanced supply options.

Buy Now
Questions 10

Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.

How should they set this up for the easiest maintenance, going forward?

Options:

A.

Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.

B.

Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.

C.

Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.

D.

Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.

E.

Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.

Buy Now
Questions 11

You are a demand planner and you want to generate forecast for all laptop and desktop products in the US business unit. You are using standard enterprise and product hierarchy. You have created a demand plan and now you must define plan scope.

Identify three valid steps. (Choose three.)

Options:

A.

For plan parameters, select forecasting calendar as Gregorian and time level as week.

B.

For forecasting items, select hierarchy as product, level as category level 1, and laptop and desktop categories as level members.

C.

For plan parameters, select forecasting calendar as Gregorian and time level as month.

D.

For plan organizations, select hierarchy as enterprise, level as country, and US as level member.

E.

For forecasting items, select hierarchy as product, level as product, and all laptop and desktop products as level members.

F.

For plan organizations, select hierarchy as enterprise, level as business unit, and US and level member.

Buy Now
Questions 12

Which type of data in the Supply Network Model is not collected, but is accessed through a view used by Planning?

Options:

A.

Supplier data

B.

Customer data

C.

Organization data

D.

Carrier data

Buy Now
Questions 13

You want to understand what your inventory turns are for your organization. Where can you see this information in Planning Central?

Options:

A.

Manage Planning Analytics

B.

Manage Planning Measures

C.

View Planning Analytics

D.

Manage Metrics

E.

Plan Summary

Buy Now
Questions 14

Your company needs to implement project-driven supply planning, along with demand and supply netting based on the country of origin. Which setup task is needed for this?

Options:

A.

Manage Demand and Supply Netting Rules task

B.

Manage Attribute-Based Netting Rules task

C.

Manage Project Netting Rules task

D.

Manage Attribute and Project Netting Rules task

Buy Now
Questions 15

You want to be able to filter your data by the planner code attribute on the item. Where can you go to do this?

Options:

A.

Configure Planning Analytics > Levels and Attributes tab

B.

The process "Add Levels and Attributes" must be run to associate new attributes.

C.

The process "Associate Measure Catalog Attributes" must be run to associate new attributes.

D.

Enable planner code on Planning Analytics page.

E.

Configure Planning Analytics > Measure Catalog

Buy Now
Questions 16

Which statement is NOT true about item attributes?

Options:

A.

The "forecast control" item attribute must be assigned if configure-to-order (CTO) items are being planned.

B.

Many item attributes can be overridden as part of a simulation set that gets applied to a plan.

C.

Some item attributes can be overridden directly in the Items table for simulation purposes.

D.

Supply plans ignore items with the "planning method" attribute set to MPP.

Buy Now
Questions 17

A supply plan has just been run that contains a configured item. You notice that the sourcing rules of the base model were used instead of sourcing rules for the configured item. Why did this happen?

Options:

A.

No sourcing rules have been defined for the configured item.

B.

The sourcing rules of the base model overrode the sourcing rules of the configured item.

C.

It is not possible to create sourcing rules for the configured item; all configured items always use the same sourcing rules as the base model.

D.

The sourcing rules of the base model had a priority of 1, while the sourcing rules of the configured item had a priority of 2.

E.

No planning percentages were defined at the operation level within the work definition.

Buy Now
Questions 18

Your clients want to simulate how canceling demand may impact a plan. Which two steps must be done to simulate this change? (Choose two.)

Options:

A.

Run plan with 'Do not refresh with current data'

B.

Manage Plans > Edit Plan Options > Add simulation set

C.

Open plan > View Supplies and Demands > Firm the demand and set firm quantity to 0 > Save changes

D.

Open plan > View Supplies and Demands > Remove the sales order from the plan and firm demand > Save changes

E.

Run plan with 'Refresh with current data'

Buy Now
Questions 19

Which statement is correct regarding S&OP?

Options:

A.

S&OP supply requirements are based on Bills of Resources (BOR) if available; otherwise, the Work Definitions are used.

B.

Sourcing cannot be maintained directly in S&OP, but must be collected.

C.

S&OP supply requirements are only based on Bills of Resources (BOR).

D.

If Bills of Resources are used, the only way to make one available is via import using a dedicated template.

Buy Now
Questions 20

What is the maximum number of levels permitted in backlog management's allocation rules hierarchy?

Options:

A.

4

B.

3

C.

10

D.

5

Buy Now
Questions 21

Which list of parameters is available for selection when you run the Start Backlog Planning scheduled process?

Options:

A.

Priority Rule. Organization. Demand Class, Item. Customer

B.

Demand Priority Rule. Organization. Demand Class. Item. Customer

C.

Backlog Priority Rule. Organization. Category. Item. Customer

D.

Demand Priority Rule. Organization. Category. Item, Customer

Buy Now
Questions 22

Your client has a requirement to restrict Supply Plan data access. Identify three Data Access Set detail entities that can be used to restrict plan data access. (Choose three.)

Options:

A.

Supplier

B.

Item

C.

Transaction Type

D.

Customer

E.

Material Planner

F.

Demand Class

Buy Now
Questions 23

The supply plan is not very reliable. Components often arrive early or late. A team of planners, buyers, marketers, product engineers, and materials managers are tasked to investigate. They list several possibilities that could explain their plan’s poor results.

If you were a member of the investigation team, which step would you recommend to help troubleshoot this serious issue?

Options:

A.

For inaccurate quantity-on-hand issues, use the Planning Advisor to identify inventory accuracy improvement opportunities.

B.

For incomplete or unreliable demand schedules, use the Planning Advisor to identify forecast accuracy issues.

C.

For incorrect or incomplete bills of materials, use the Planning Advisor to identify bill of material anomalies.

D.

For incorrect or unreliable supplier lead times, use the Planning Advisor to determine lead time accuracy.

Buy Now
Questions 24

You analyzed your customer's shipment history data at item and organization level. You found that the customer has many new products with limited history.

Does Planning Central support forecasting products with limited history, and what is this process called?

Options:

A.

No, Planning Central does not support the Croston Method for Sparse Demand forecasting method.

B.

Yes, Planning Central supports the Regression for Sparse Demand forecasting method, typically used for new products.

C.

Yes, Planning Central supports the Holt Exponential Smoothing forecasting method used for newly introduced products.

D.

No, Planning Central does not support the Regression for Sparse Demand forecasting method.

E.

No, Planning Central does not support the Holt Exponential Smoothing forecasting method.

Buy Now
Questions 25

Which three statements are true about accounting?

Options:

A.

Landed Cost Management gives organizations visibility into their extended supply chain costs.

B.

Supply Chain Orchestration automatically selects the correct process based on user-defined subledger accounting rules when a supply creation is initiated.

C.

Receipt Accounting performs accrual accounting.

D.

Cost method can be assigned at the item level.

Buy Now
Questions 26

The five pre-configured review stages of a Sales and Operations Planning process are Product Review, Demand Review, Supply Review, Financial Review, and Executive Review.

If Product Review is NOT an integral part of your company’s S&OP process, how do you configure the system to ignore it?

Options:

A.

In Manage Planning Cycles, right-click the Product Review tab. and select Delete.

B.

It is not possible to ignore any of the 5 pre-configured review stages.

C.

In Manage Planning Cycles, do not add any participants or tasks for the Product Review stage.

D.

In Manage Planning Cycles, go to the Actions menu, select Configure Stages, and set Enabled for Product Review to No.

Buy Now
Questions 27

Each of your planners is responsible for a different geography and set of product lines, so each planner needs to see just their own set of data, analyses and dashboards.

How do you configure the application so each planner can have their own custom dashboard viewable only to themselves?

Options:

A.

Create public page layouts that are tailored to specific business needs.

B.

Create private page layouts that are tailored to specific business needs.

C.

You cannot create custom dashboards by user.

D.

Enable layout security checkbox in the Administer Planning Security

Buy Now
Questions 28

Your client manufactures consumer electronics and has all facilities live on Oracle Cloud. Their latest product has a very complicated manufacturing process and therefore can only be made at one facility (Organization ABC). However, it is ordered all over the world.

How should the Sourcing Rule be set up to accomplish this?

Options:

A.

A global sourcing rule for 50% make at ABC and 50% buy from ABC

B.

A local sourcing rule for 100% make at ABC; a global sourcing rule for 100% transfer from ABC

C.

A local sourcing rule for 100% make at ABC; a global sourcing rule for 100% buy from ABC

D.

A local sourcing rule for 100% buy from ABC; a global sourcing rule for 100% transfer from ABC

E.

A global sourcing rule for 100% make at ABC; a local sourcing rule for 100% transfer from ABC

Buy Now
Questions 29

What are two characteristics of an ‘Item’ organization? (Choose two.)

Options:

A.

It includes parameter definition, including lot. serial number, and item sourcing rules.

B.

It requires financial and accounting setups.

C.

It does not physically of financially track material storage or movement.

D.

It is ideal for deployments where inventory management may not be installed.

Buy Now
Questions 30

The marketing department of a company needs to analyze the forecast based on type of demand (large retailer versus specialty store) and item cost (low versus high).

After creating a segment group with demand class and product for segment granularity, what additional sequence of actions must they also perform to satisfy marketing?

Options:

A.

Define four segments based on demand type and item cost, define each segment's criteria, execute segmentation, and use the selector tool to create a new table or graph.

B.

Define four segmentation based on demand type and item cost, define each segment's criteria, execute segmentation, configure planning analytics to update the dimension catalog, and use the selector tool to create a new table or graph.

C.

Define four segments based on demand type and item cost, execute segmentation, and use the selector tool to create a new table or graph.

D.

Define two segments based on demand type and item cost, execute segmentation, and use the selector tool to create a new table or graph.

Buy Now
Questions 31

You want to check how many items have excess inventory. Which three choices will get you there? (Choose three.)

Options:

A.

Open Table, Graph, or Tile Set > Table: Item Exceptions Summary > Filter by Items with Excess Inventory

B.

Manage Plans > Edit Plan Options > Select Supply tab > Navigate to Item area > Filter by Items with Excess Inventory

C.

Open Table, Graph, or Tile Set > Table: Exceptions > Expand Supply Planning Exceptions > Select Items with Excess Inventory

D.

Open Table, Graph, or Tile Set > Table: Items with Exceptions > Filter by Items with Excess Inventory

E.

Open Table, Graph, Tile Set > Table: Items > Select any Item > Drill to: Item Exceptions > Expand Supply Planning Exceptions > Select Items with Excess Inventory > Refresh the search results

Buy Now
Questions 32

Which is the correct sequence of possible solutions that a constrained plan might consider when attempting to resolve a capacity or resource overload?

Options:

A.

First alternate resources, then substitute components, then alternate work definitions and item structures, and finally, alternate suppliers and source organizations.

B.

First alternate suppliers, then alternate resources, then substitute components, then alternate work definitions and item structures, and finally, alternate source organizations.

C.

First subscribe components, then alternate resources, then alternate work definitions and item structures, and finally, alternate suppliers and source organizations.

D.

First alternate item structures, and work definitions, then substitute components, then alternate resources, and finally, alternate suppliers and source organizations.

Buy Now
Questions 33

Your customer has loaded shipment history of 1/1/14 through 12/31/16 and wants to generate a monthly forecast of 1/1/17 through 12/31/17 based on two-year shipment history.

When creating a demand plan, which two plan scopes and demand plan options should your customer use? (Choose two.)

Options:

A.

For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/15, enter history end date as 12/31/15, and enter forecast start date as 1/1/17.

B.

For demand plan option, add forecast shipments as forecasting profile, and enter historical buckets as 24.

C.

For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/15, forecast start date as 1/1/17, and enter forecast end date as 12/31/17.

D.

For demand plan option, add forecast shipments as forecasting profile, enter historical buckets as 24, and enter forecast buckets as 12.

E.

For plan scope, select plan horizon days as 365, forecasting calendar as Gregorian, and forecasting time level as month.

F.

For plan scope, select plan horizon as 12 months, forecasting calendar as Gregorian, and forecasting time level as month.

Buy Now
Questions 34

Should value in Adjusted Shipments Forecast measure always be equal to the Final Shipments Forecast measure?

Options:

A.

Yes, if the adjustment is made below the aggregation level at which it is viewed.

B.

Yes,if the adjustment is made at the same aggregation level at which itis viewed, or below.

C.

No, both measures will always be different.

D.

Yes,if the demand plan is approved and values are locked.

E.

Yes,if the demand plan hasn't been run again after adjustment.

Buy Now
Questions 35

Which statement order is NOT true about how to effectively address demand at risk?

Options:

A.

Recommendations appear in one of these five categories (or tabs): Expedite Buy Orders. Expedite Planned Orders. Expedite Transfer Orders. Add Resource Availability, and Add Supplier Capacity.

B.

When you accept an expedite recommendation, the order is firmed by using the expedite date as the firm date. So when the plan is run after accepting the recommendation, the planning process assumes the supply is available on the firm date.

C.

Be aware that recommendations to expedite buy orders not only include purchase orders and requisitions, but also planned buy orders.

D.

To maximize effort, use the Recommendations Summary graph and aim for a low number of recommendations with the associated at-risk demand value substantial enough to make a difference in demand fulfillment percentage.

Buy Now
Questions 36

Segmentation was last run many months ago and the replenishment planner is concerned about losing track of items whose policies get changed due to the upcoming resegmentation. There are also a lot of manually assigned segments that must be preserved. Which two approaches for Execute Segmentation should you use in this planner?

Options:

A.

Save the last segmentation result should be selected.

B.

No other setting is needed.

C.

Auto-approve segmentation changes should not be selected.

D.

Retain segment overrides should be selected.

Buy Now
Questions 37

Segmentation was last run many months ago and the replenishment planner is concerned about losing track of items whose policies get changed due to the upcoming resegmentation. There are also a lot of manually assigned segments that must be preserved. Which two approaches for Execute Segmentation should you use in this planner?

Options:

A.

Save the last segmentation result should be selected.

B.

No other setting is needed.

C.

Auto-approve segmentation changes should not be selected.

D.

Retain segment overrides should be selected.

Buy Now
Questions 38

Which is not a potential source for a planning attribute?

Options:

A.

A standard attribute for purchase orders

B.

An extensible flexfield for sales orders

C.

A key flexfield for items

D.

A descriptive flexfield for purchase requisitions or work orders

Buy Now
Questions 39

Your client wants to utilize product categories on sourcing rules. They have created a new category for this and populated the items for it.

Where do they set up the category planning uses when evaluating sourcing rules?

Options:

A.

Manage Planning Profile Options

B.

Manage Plans

C.

Manage Sourcing Rules

D.

Manage Assignment Sets

E.

Manage Planning Source Systems

Buy Now
Questions 40

A sales order containing a back-to-back item has been created. However, when you ran the supply plan in Planning Central, the supply for the sales order was not released. Why was the supply not released?

Options:

A.

The supply plan should have been run in Supply Chain Orchestration, not Planning Central.

B.

Planning Central cannot create back-to-back supply, so the supply cannot be released.

C.

Only Global Order Promising and Supply Chain Orchestration can be used to release and create new supplies for back-to-back orders.

D.

The supply must first be created in Global Order Promising and then it can be released from Planning Central.

Buy Now
Exam Code: 1z0-1066-24
Exam Name: Oracle Planning and Collaboration Cloud 2024 Implementation Professional
Last Update: Jun 15, 2025
Questions: 138
1z0-1066-24 pdf

1z0-1066-24 PDF

$29.75  $84.99
1z0-1066-24 Engine

1z0-1066-24 Testing Engine

$35  $99.99
1z0-1066-24 PDF + Engine

1z0-1066-24 PDF + Testing Engine

$47.25  $134.99