A shared dashboard contains the Issue Statistics gadget.

Amanda complains that the gadget displays 23 issues when she views it while other team members report that they see 45 issues.

Select two reasons that explain why the numbers differ. (Choose two.)

Options:

A.

Some of the issues are hidden by issue security levels.

B.

She does not meet the currentUse() criteria in the saved filter.

C.

She does not have the Administer Projects permissions in some projects.

D.

She is not listed in the share settings on the saved filter.

Buy Now
Questions 5

You are the project administrator for a team based in the Middle East.

You need to change the Standard Working Days configuration on the board: from Sunday to Thursday instead of Monday to Friday.

What will be affected by this change?

Options:

A.

Velocity Chart

B.

sprint duration

C.

Average Age Report

D.

original estimates on issues

E.

Burndown Chart

Buy Now
Questions 6

A team needs a board that meets these requirements:

● All issues can be moved across the entire workflow on a single view of the board.

● Issues can be worked in a continuous flow without start and stop dates.

Which board configuration meets the requirements?

Options:

A.

Kanban board without backlog

B.

Scrum board without parallel sprints

C.

Scrum board with swimlanes

D.

Kanban board with backlog

Buy Now
Questions 7

You shared a URL to the dashboard with Bobby but when he looks at it, the gadgets return errors that state, "The filter configured for this gadget could not be retrieved."

What is the most likely problem with the filters?

Options:

A.

They return issues from team-managed projects.

B.

They return issues with hidden fields.

C.

They are not shared with Bobby.

D.

They contain corrupt JQL clauses.

Buy Now
Questions 8

Your team switched to using story points for estimation in the last 2 months and their sprints are 2 weeks long.

Which chart can definitely help you determine the average effort that the team can deliver during each sprint?

Options:

A.

Velocity Chart

B.

Cumulative Flow Diagram

C.

Burnup Chart

D.

Burndown Chart

Buy Now
Questions 9

The team requests that you configure their Kanban board in such a way that they can:

● see just particular subsets of issues based on values in a radio button field

● see all issues grouped by the epic they belong to

● distinguish cards visually based on their priority

Select three board configurations that when combined together, will satisfy these requirements. (Choose three.)

Options:

A.

card colors by priority

B.

board sub-filter based on radio button field

C.

swimlanes byepic

D.

card layout by priority

E.

quick filters based on radio button field

F.

quick filters based on epic

Buy Now
Questions 10

You are the project administrator of two Scrum projects, MOBI and TIS.

Team members find it difficult to switch between both projects to work on separate sprints.

They need the ability to work on issues from both projects in a single sprint.

Identify two ways that you can satisfy this requirement. (Choose two.)

Options:

A.

use the Filter Results dashboard gadget to show both MOBI and TIS issues

B.

add a quick filter to the board in MOBI to show issues from TIS

C.

create a new Scrum board that includes both MOBI and TIS issues

D.

base swimlanes on MOBI and TIS projects

E.

change the TIS project board filter to include issues from MOBI project

Buy Now
Questions 11

Service managers are tired of assigning issues manually.

Identify four ways that issue assignments can be done without manual effort (Choose four.)

Options:

A.

bulk operations

B.

project default assignment

C.

project permissions

D.

component lead assignment

E.

workflow

F.

automation rules

Buy Now
Questions 12

You want to configure a Kanban board so that issues disappear from the Done column as soon as they are dragged into it. But you need to see Done issues in reports.

How can you achieve this behavior?

Options:

A.

modify a quick filter

B.

modify the board filter

C.

modify workflow status names

D.

modify the unmapped statuses

E.

modify the board sub-filter

Buy Now
Questions 13

Users can add content to a paragraph field in a team-managed project, but they cannot @ mention other users.

Identify the cause.

Options:

A.

global permissions

B.

field settings

C.

issue-level security settings

D.

notification settings

E.

screen settings

F.

project permissions

Buy Now
Questions 14

A user wants to add the label VIP to an issue when any member of the Executives group adds a comment to it.

The configuration of the automation rule is shown.

The automation rule does not always execute as expected.

What is the cause of the problem?

Options:

A.

The label VIP is not available in the issue's project.

B.

User condition has to be the trigger.

C.

A condition is missing to check whether the label is already set.

D.

User condition does not account for who is commenting.

E.

Issue commented has to be the condition.

Buy Now
Questions 15

The rule shown is configured to run in your project.

The rule actor is missing a permission which is causing the rule to error.

Identify that permission.

Options:

A.

Transition Issues

B.

Modify Reporter

C.

Schedule Issues

D.

Assign Issues

E.

Resolve Issues

Buy Now
Questions 16

Vishnu is the Project Lead of the DEV project He can create new components inline while viewing DEV issues.

You should have the same ability as Vishnu. However, you can only select an existing component not create new ones inline.

Which change will definitely enable you to create new components inline?

Options:

A.

grant you the Administer Projects permission

B.

grant you the Edit Issues permission

C.

add you to the Administrators project role

D.

add you as another Project Lead of DEV

Buy Now
Exam Code: ACP-620
Exam Name: Managing Jira Projects for CloudExam
Last Update: May 3, 2025
Questions: 56
ACP-620 pdf

ACP-620 PDF

$25.5  $84.99
ACP-620 Engine

ACP-620 Testing Engine

$30  $99.99
ACP-620 PDF + Engine

ACP-620 PDF + Testing Engine

$40.5  $134.99