Month End Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

D-VXR-DS-00 Dell VxRail Design Questions and Answers

Questions 4

What are two valid node configurations for a vSAN ESA cluster? (Choose two.)

Options:

A.

P670N with 6 NVMe SSDs and 10 GbE networking

B.

VP-760 with 6 SAS SSDs and 25 GbE networking

C.

VD-4510 with 3 NVMe SSDs and 25 GbE networking

D.

E660N with 3 NVMe SSDs and 10 GbE networking

Buy Now
Questions 5

An architect for a new VxRail cluster plans to use predefined network profile for vSphere Distributed Switch.

Which three configurations are available in predefined profile? (Choose three.)

Options:

A.

2x10 GbE (Integrated NIC)

B.

2x25 GbE (PCIe NICs)

C.

4x1 GbE (Integrated NIC)

D.

4x10 GbE (Integrated NIC)

E.

4x25 GbE (Integrated NICs)

Buy Now
Questions 6

Which document from the VxRail Configuration Portal can be used to validate site readiness before a deployment?

Options:

A.

Getting Started Guide

B.

Pre-deployment Checklist

C.

Deployment Planning Guide

D.

Configuration Report

Buy Now
Questions 7

A VxRail architect must design a new VxRail cluster using the VxRail Sizing Tool. The new cluster will replace an existing 3 tier infrastructure and must support Hadoop and Tableau workloads.

Which purpose and use case should be selected in the VxRail sizing tool?

Options:

A.

Purpose: Greenfield

Use Case: In Memory database

B.

Purpose: Datacenter Consolidation

Use Case: Relational database

C.

Purpose: Greenfield

Use Case: Big data

D.

Purpose: VxRail Technology Refresh

Use Case: Big data

Buy Now
Questions 8

An architect is designing a VxRail solution for a customer who needs vCenter HA.

Which vCenter Server platform options supports this requirement?

Options:

A.

Use an existing VxRail-managed vCenter server

B.

Use an existing Customer-supplied vCenter server

C.

Use an existing Customer-supplied vCenter server

D.

Use a new VxRail-managed vCenter server

Buy Now
Questions 9

When using an existing customer-managed vCenter what setting need to be preconfigured before deployment?

Options:

A.

VM Folder

B.

Datacenter Object

C.

Cluster Object

D.

Storage Folder

Buy Now
Questions 10

When planning for a VxRail 2-node cluster, which two separate networks are required to be configured for vSAN witness virtual appliance? (Choose two.)

Options:

A.

Management network

B.

VxRail network

C.

vCenter network

D.

vSAN witness network

Buy Now
Questions 11

What are the two types of port groups of vSphere Distributed Switches? (Choose two.)

Options:

A.

Virtual machine port groups

B.

Uplink port groups

C.

VMkernel port groups

D.

[Distributed port groups

Buy Now
Questions 12

A VxRail architect is planning to deploy a new cluster. The servers equipped with two network cards with different uplink speeds between the two cards.

What vSphere Distributed Switch design should be used to ensure the highest performance and security?

Options:

A.

Guest VM traffic assigned only to a single top of rack switch

B.

Resource-intense networks like vSAN assigned to higher speed uplinks

C.

A predefined network profile with 4x10 Gb or 4x25 Gb interface speed

D.

Maximum Transmission Unit set to 9000

E.

Two new vSphere Distributed Switches

Buy Now
Exam Code: D-VXR-DS-00
Exam Name: Dell VxRail Design
Last Update: Aug 28, 2025
Questions: 40
D-VXR-DS-00 pdf

D-VXR-DS-00 PDF

$25.5  $84.99
D-VXR-DS-00 Engine

D-VXR-DS-00 Testing Engine

$30  $99.99
D-VXR-DS-00 PDF + Engine

D-VXR-DS-00 PDF + Testing Engine

$40.5  $134.99