Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

Note! Following HPE0-S50 Exam is Retired now. Please select the alternative replacement for your Exam Certification.

HPE0-S50 Integrating HPE Synergy Solutions Questions and Answers

Questions 4

A Synergy integrator has installed a new frame into a rack with two existing frames in the customer's environment.

Click where the integrator should verify that the cabling for the management ring was completed correctly.

Options:

Buy Now
Questions 5

A customer has the following HPE Synergy solution:

  • Three Synergy frame
  • two HPE Virtual SE 16Gb Channel modules in each frame
  • two HPE Virtual Connect interconnect Link Modules
  • Four HPE Synergy 10Gb Interconnect Link Modules

Click the menu option the Synergy integrator should use to add uplinks from HPE Virtual Connect SE 16Gb FC modules to SAN switches.

Options:

Buy Now
Questions 6

When should IP address be assigned using an IPv6 address pool in the Composer? (Select two.)

Options:

A.

when configuring management NICs in an operating system

B.

when booting to an iSCSI initiator with image Streamer

C.

when PXE booting from the deployment server

D.

when configuration Composer appliance

E.

when configuration interconnects modules

Buy Now
Questions 7

A customer is planning an HPE Synergy solution with 20 frames an needs to minimize the number of management ports that are required to connect the frames into the existing management network.

Which procedure should the Synergy into a integrator use to address the customer's concern?

Options:

A.

Connect FLMs from all frames into a management ring: Then connect the management ring to the customer's management network using two uplinks.

B.

Connect FLMs from all frames to two external switches for redundancy: Then connect the two uplinks from the two switches into the customer management network.

C.

Connect the RJ-45 front port of each frame to two external switches for redundancy: Then connect the uplink from the two switches into the customer's management network.

D.

Connect the RJ-45 front ports of each frame to an external switch. Then connect the uplink from the external switch into the customer management network.

Buy Now
Questions 8

A customer needs to incorporate the HPE Synergy D340 Compostable Storage Module into its environment:

Click the adapter associated with the fabric in which the customer should install the p542 controller.

Options:

Buy Now
Questions 9

A customer has a single frame with seven compute modules in bays 1-7. The customer has an HPE Synergy 12Gb SAS should Module in slot 1. The customer recently made a change require high availability for its storage.

Options:

A.

Install an additional Synergy integrator do to the customer to support bays 7-12

B.

Move the compute module from bay 7 to bay 12.

C.

Add another HPE Synergy 12GB SAS Connecttion module to bay 4.

D.

Move the mezzanine Card to slot 2 on each compute module.

Buy Now
Exam Code: HPE0-S50
Exam Name: Integrating HPE Synergy Solutions
Last Update: Apr 14, 2023
Questions: 60