NCSE-Level-1 Nutanix Certified Systems Engineer (NCSE): Level 1 Questions and Answers

Questions 4

An SE builds a Sizer scenario for SQL server running on Cisco C240 M4 servers.

Using only the Sizer BOM, which two actions can be performed? (Choose two)

Options:

A.

Reference the HCL for additional SKU’s relevant to the configuration.

B.

Review budgetary pricing.

C.

Review workload sizing details.

D.

Build a complete BOM in Cisco commerce Workspace (CCW)

Buy Now
Questions 5

A prospects storage administrator is concerned about deploying Nutanix for their vSphere server virtualization environment due to anticipated increase to the data retention for compliance purpose and associated costs.

Which Nutanix feature should an SE discuss to convince the prospect to move forward?

Options:

A.

Linear scalability by adding more nodes.

B.

Acropolis Block Services.

C.

Adding storage only nodes.

D.

Extending storage container with existing SAN storage.

Buy Now
Questions 6

A prospect is planning to refresh hundreds of remote locations. Each location has the following configuration:

• 2x HPE DL360 servers running vSphere, each using its own local storage

• 3-4 Windows VMs with no plans to expand

Scheduling the initial meeting to discuss the opportunity has been challenging as the prospect believes a Nutanix solution would be overpriced for their remote site needs.

What are two Nutanix capabilities the SE should highlight to address solution cost concerns? (Choose two.)

Options:

A.

1 -Node and 2-Node Clusters

B.

Xi DRaaS

C.

Foundation

D.

AHV

Buy Now
Questions 7

An SE is using the output from RVTools to size the storage capacity for a Nutanix Cluster.

Which value most closely resembles the minimum required storage capacity that should be entered for the aggregate workload in sizer?

Options:

A.

15 TB.

B.

24 TB

C.

37 TB

D.

39 TB

Buy Now
Questions 8

During an initial meeting with a prospect the storage administrator learns that Nutanix does not use RAID for application data. The prospect's storage array is configured with RAID 10 and the full capacity of the array is required. As a result no hot spares have been allocated. The storage administrator must respond immediately to any disk failures, even outside standard business hours.

Which aspect of Nutanix replication factor (RF) will reduce the storage administrator's break/fix burden?

Options:

A.

Automatic data re-protection using available cluster capacity

B.

Distribution of multiple copies of data across various nodes in a cluster

C.

Checksumming for data integrity

D.

Block awareness

Buy Now
Questions 9

Refer to the exhibit.

Based on the Sizing scenario, what level of resiliency can be inferred about the configuration?

Options:

A.

RF3

B.

N+1

C.

N+0

D.

N+2

Buy Now
Questions 10

AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three

solutions in their datacenter simultaneously over the course of 4 days.

The customer schedules all necessary personnel to be available during this time.

Which two network planning items should the SE determine prior to allocation hardware for the POC? (Choose two)

Options:

A.

VLAN tags

B.

CVM and hypervisor IP address

C.

TOR switch redundancy configuration

D.

Switch port type

E.

Source and number of cables

Buy Now
Questions 11

A prospect indicates a requirement to replicate data offsite for a production workload.

Which three questions the SE ask about the prospect's requirement?

(Choose three.)

Options:

A.

What are the retention requirements?

B.

How much data needs to be replicated?

C.

What OS will be deployed on the server VMs?

D.

What is the WAN speed and latency between source and target sites?

E.

Will Prism Pro be licensed for each cluster?

Buy Now
Questions 12

A prospect facing an upcoming Vmware ELA renewal has a management directive to move to the public cloud due to perceived cost savings. Their virtualization team is currently struggling with refactoring applications for AWS. As a result, the virtualization team is pushing to evaluate VXRail and renew their VMware ELA.

Which two aspects of Nutanix shoud the SE Highlight? (Choose two)

Options:

A.

Nutanix AHV

B.

Cloud Connect

C.

Nutanix Calm

D.

Multi-cluster Management

5. Multi-hypervisor Support

Buy Now
Exam Code: NCSE-Level-1
Exam Name: Nutanix Certified Systems Engineer (NCSE): Level 1
Last Update: May 12, 2024
Questions: 83
NCSE-Level-1 pdf

NCSE-Level-1 PDF

$28  $80
NCSE-Level-1 Engine

NCSE-Level-1 Testing Engine

$33.25  $95
NCSE-Level-1 PDF + Engine

NCSE-Level-1 PDF + Testing Engine

$45.5  $130