A client has come to a designer with a set of documents outlining a prototype design for retail stores. The client wants to build two new stores and has hired the designer to implement the design. What should the designer issue to the contractor?

Options:

A.

Original prototype package as received from the client

B.

Project/site-specific modified prototype construction documents

C.

Project/site-specific specifications along with the original prototype drawings

D.

Prototype package as received from the client with the new site address on the cover sheet

Buy Now
Questions 5

What is the PRIMARY function of an order acknowledgement?

Options:

A.

Secure written agreement before proceeding with the work

B.

Allow review and correction before an order is manufactured

C.

Prescribe the processes for tracking invoices and accounts receivable

D.

Establish the discount structure to be used for purchases related to a particular project

Buy Now
Questions 6

In new construction, when would be the appropriate time to schedule an on-site review of wall blocking for an artwork package?

Options:

A.

when the artwork arrives on site

B.

before gypsum board is installed

C.

during a preconstruction meeting

D.

before electrical systems are installed

Buy Now
Questions 7

A post-occupancy evaluation indicates that occupants are cold during winter months due to the building’s HVAC system not performing according to design. What would have prevented this situation?

Options:

A.

commissioning

B.

additional diffusers

C.

a punch (deficiency) list

D.

an underfloor distribution system

Buy Now
Questions 8

When estimating the total FF&E costs for installation, maintenance, and replacement, which of the following is being completed?

Options:

A.

Actual costs

B.

Planned value

C.

Life-cycle costing

D.

Cost-benefit analysis

Buy Now
Questions 9

Which drawings and information would be presented during the design development phase?

Options:

A.

Preliminary floor plan, elevations, and details

B.

Bubble diagrams, scale models, and finish schedule

C.

Finalized floor plans, 3-D drawings, and finish samples

D.

Criteria matrix, orthographic drawings, and blocking diagrams

Buy Now
Questions 10

Prior to the contract document phase, a designer should meet with a client for what purpose?

Options:

A.

Having the client understand and approve the finalized drawing layout

B.

Determining what the client’s overall budget is for non-fixed furnishings

C.

Reviewing and giving the client the written proposals for all items to be purchased

D.

Submitting copies of the furniture specifications the designer will be sending to vendors

Buy Now
Questions 11

What is the MOST important consideration when specifying light fixtures for a retail store?

Options:

A.

Wattage

B.

Indirect glare

C.

Reflected glare

D.

Color rendering index

Buy Now
Questions 12

When the owner/contractor agreement is executed, which documents specifically form the contract documents?

Options:

A.

drawings, specifications, instruction to bidders

B.

drawings, specifications, addenda

C.

specifications, addenda, bid (tender) solicitation

D.

addenda, bid (tender) solicitation, instruction to bidders

Buy Now
Questions 13

What are the PRIMARY components of sustainability?

Options:

A.

global, wellness, and universal

B.

LEED, SMaRT, and Green Globes

C.

eco-friendly, non-toxic, and organic

D.

environmental, social, and economic

Buy Now
Questions 14

A residential client wants to build an addition that would occupy the entire side-yard. What is the interior designer responsible for checking before proceeding?

Options:

A.

soils report

B.

access route

C.

setback requirement

D.

neighborhood agreement

Buy Now
Questions 15

A project is utilizing existing millwork with new custom countertops. Who is responsible to field verify the existing conditions to generate shop drawings for the new countertops?

Options:

A.

owner

B.

installer

C.

designer

Buy Now
Questions 16

An office client tells the designer they would like their staff break room to be visible from the reception area to convey a relaxed environment. This request reflects the client’s

Options:

A.

Site

B.

Culture

C.

Budget

D.

Program

Buy Now
Questions 17

What is the MOST critical aspect of an existing building to check before locating library shelving and densely packed filing cabinets?

Options:

A.

Location of sprinkler lines and heads

B.

Location of columns and bearing walls

C.

Load-bearing capacity of the building’s floor system

D.

Access route from loading dock to the final location

Buy Now
Questions 18

A storage area has been approved as an accessory occupancy within a retail store. The means of egress requirements are based on which occupancy type?

Options:

A.

Storage (S)

B.

Business (B)

C.

Mercantile (M)

Buy Now
Questions 19

In an existing non-sprinklered multi-tenant building, a client will be converting a suite from a bank into a restaurant serving more than 49 persons. What fire rating is REQUIRED between the new tenant and the existing adjacent insurance office?

Options:

A.

0

B.

1

C.

2

D.

3

Buy Now
Questions 20

What are the three parts of a Construction Specification Institute (CSI) specification?

Options:

A.

general, products, execution

B.

allowance, alternate, application

C.

information, purchasing, installing

D.

requirements, finishes, construction

Buy Now
Questions 21

Which scheduling method BEST shows the interrelationships of tasks?

Options:

A.

work plan

B.

Gantt chart

C.

critical path

D.

milestone chart

Buy Now
Questions 22

What is the allowable reach range for an obstructed side reach over a kitchen counter?

Options:

A.

34" [914 mm] to 46" [1168 mm]

B.

15" [381 mm] to 48" [1219 mm]

C.

18" [457 mm] to 48" [1219 mm]

Buy Now
Questions 23

In which type of space would occupant load be calculated using net square footage?

Options:

A.

exercise room

B.

airport terminal

C.

museum exhibit

Buy Now
Questions 24

Changes made to the contract documents during the bid (tender) process are documented in a(n)

Options:

A.

Bulletin

B.

Addendum

C.

Change order

Buy Now
Questions 25

What core information should be captured in the design contract to demonstrate a clear understanding of the physical parameters of the project?

Options:

A.

Property address, usable square footage [m²], and projected use

B.

Room name, client, and occupant load

C.

Room measurements, drawing references, and furniture requirements

D.

Occupant load, circulation ratio, and building classification

Buy Now
Questions 26

Which of the following would allow for ease of reconfiguration of power and data for open office environments?

Options:

A.

access flooring

B.

poke-through system

C.

cellular floor systems

D.

underfloor steel ducts

Buy Now
Questions 27

Which type of mechanical heating system uses pipes or tubing embedded within the ceiling, floor, or wall construction?

Options:

A.

electric

B.

radiant

C.

hot-water

D.

forced-air

Buy Now
Questions 28

A conflict on the job site impacts the location of a wall sconce, requiring an adjustment. The BEST way to communicate this change is for the

Options:

A.

interior designer to request the electrical engineer issue a change order

B.

interior designer to provide a sketch as part of a supplemental instruction

C.

general contractor to request a change directive prior to making a change

D.

electrical engineer to issue an addenda as part of the contract documents

Buy Now
Questions 29

What is the MINIMUM distance a vending machine can be located on the push side of a door with a closer and latch in an employee breakroom?

Options:

A.

12" [305 mm]

B.

18" [457 mm]

C.

24" [610 mm]

Buy Now
Questions 30

Which wall assembly would produce the highest STC rating?

Options:

A.

2x4 studs at 16" [406 mm] OC, 2 layers of 5/8" [15 mm] gypsum board on each side, full batt insulation

B.

2-1/2" [64 mm] metal studs at 16" [406 mm] OC, 1/2" [13 mm] gypsum board on each side, full batt insulation

C.

3-1/2" [89 mm] metal studs at 16" [406 mm] OC, 5/8" [15 mm] gypsum board on each side, full batt insulation

Buy Now
Questions 31

What is the required clear floor space at an accessible lavatory in a public restroom (washroom)?

Options:

A.

24" x 42" [610 mm x 1067 mm]

B.

24" x 48" [610 mm x 1219 mm]

C.

30" x 36" [762 mm x 914 mm]

D.

30" x 48" [762 mm x 1219 mm]

Buy Now
Questions 32

A designer has been hired to design millwork for a school library. During installation, there is a conflict between existing field conditions and shop drawing dimensions. Who is responsible for the discrepancy?

Options:

A.

Installer

B.

Manufacturer

C.

Interior designer

D.

General contractor

Buy Now
Questions 33

A client wants to convert a 10,000 sf [929 m²] retail facility into an office space. What is the MOST important activity to do as a part of programming?

Options:

A.

Identify building codes

B.

Prepare record (as-built) drawings

C.

Calculate the number of parking spaces

D.

Determine which consultants are required

Buy Now
Questions 34

What deliverables are the responsibility of the interior designer in the design development phase?

Options:

A.

Power and data plans, floor plans with partition types

B.

Floor plans, reflected ceiling plans with HVAC ductwork layout

C.

Reflected ceiling plans with fixture types, floor plans with partition types

D.

Power and data plans, reflected ceiling plans with sprinkler head locations

Buy Now
Questions 35

How are the actual riser and tread dimensions for a set of stairs determined?

Options:

A.

Divide floor opening by desired tread dimension

B.

Divide floor opening by desired riser dimension

C.

Divide floor-to-floor height by minimum riser dimension

D.

Divide floor-to-floor height by maximum riser dimension

Buy Now
Questions 36

In a large project, what is the BEST reason to enter into a joint venture?

Options:

A.

Increase the firm’s profit margins

B.

Maximize hiring of short-term staff

C.

Allocate staff resources to one project

D.

Gain experience in a new type of work

Buy Now
Questions 37

What would be included as part of a fire separation (fire assembly)?

Options:

A.

Dampers

B.

Operable window

C.

Low flame-spread rating

D.

Flame retardant wallcovering

Buy Now
Questions 38

Which statement about change orders is MOST accurate?

Options:

A.

They are written permissions or instructions that modify construction documents

B.

They are notices to the client advising of changes to the construction documents

C.

They are changes made to the contract documents during the bid (tender) phase

D.

They are written instructions issued by the designer to the subtrades once the initial construction has begun

Buy Now
Questions 39

During demolition, the contractor discovers dry rot in some existing walls that are to remain. After reaching an agreement with the client and contractor on a solution, what should be issued before construction continues?

Options:

A.

a bulletin

B.

an addendum

C.

a change order

D.

a change directive

Buy Now
Questions 40

When developing a design, which BEST unifies the project and provides specific direction for the design?

Options:

A.

Feasibility studies

B.

Concept statement

C.

Space allocation studies

D.

Programming and research

Buy Now
Questions 41

A designer is working on a joint venture project with a local engineering firm for a large university project. What drawing system will BEST incorporate coordination of project information?

Options:

A.

Facility condition index (FCI)

B.

Building information modeling (BIM)

C.

Project life cycle management (PLM)

D.

Virtual design and construction project manager (VDC)

Buy Now
Questions 42

Who conducts post-occupancy evaluation interviews?

Options:

A.

Building owner

B.

General contractor

C.

Design professional

D.

Furniture manufacturer

Buy Now
Questions 43

Which person is MOST responsible for ensuring that the construction drawings are code-compliant?

Options:

A.

Developer

B.

Building owner

C.

Interior designer

D.

Building inspector

Buy Now
Questions 44

After completion of a project, the client spills coffee on their new lobby sofa. Where would the client look for information on how to remove the stain?

Options:

A.

product data sheet

B.

warranty information

C.

maintenance manual

D.

furniture specification

Buy Now
Questions 45

During construction of a project in another city, what is a common and efficient way for a small firm to manage the progress?

Options:

A.

visit the location of the project on a weekly basis

B.

joint-venture with a design firm local to the project

C.

partner with a prominent company local to the designer

D.

hire one employee that will remain in the city of the project

Buy Now
Questions 46

Which of the following should be installed at regular intervals to avoid cracking of a GWB ceiling from building structural movement?

Options:

A.

J mold

B.

U channel

C.

Control joint

D.

Elastic sealant

Buy Now
Questions 47

Which consultant should be contacted to correct omissions on the drawing shown below?

Options:

A.

Electrical

B.

Plumbing

C.

Structural

D.

Fire protection

Buy Now
Questions 48

What rating is used to determine a material’s sound absorption?

Options:

A.

CAC

B.

STC

C.

NRC

D.

UL (CSA)

Buy Now
Questions 49

A contractor has notified the designer that the existing paint in a space tests positive for lead. What is the correct course of action?

Options:

A.

The lead paint should be encapsulated with oil-based paint

B.

The designer should notify the Environmental Protection Agency (EPA)

C.

A professional licensed contractor should perform lead-paint abatement

D.

A custodian should vacuum with a high-efficiency particulate air (HEPA) filter vacuum

Buy Now
Questions 50

What is the MAXIMUM occupant load of a business occupancy with one exit?

Options:

A.

49

B.

50

C.

69

D.

70

Buy Now
Questions 51

What is one way to reduce indoor air pollutants?

Options:

A.

increase humidity levels

B.

install operable windows

C.

use materials with high VOCs

D.

decrease building temperature

Buy Now
Questions 52

Why is corrective work completed post-occupancy often MORE costly for the contractor?

Options:

A.

The warranty has expired

B.

Progress payments are not included

C.

The work must be performed after hours

D.

Revisions are billed on a cost-plus basis

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: Apr 30, 2025
Questions: 175
IDPX pdf

IDPX PDF

$25.5  $84.99
IDPX Engine

IDPX Testing Engine

$30  $99.99
IDPX PDF + Engine

IDPX PDF + Testing Engine

$40.5  $134.99