A company has the requirement of ensuring that business-critical applications have the necessary network bandwidth to function optimally and maintain a consistent quality of service (QoS).
Which statement would be included in the logical design to support this requirement?
An architect is discussing the design of a vSphere solution with a customer. The following requirements have been defined for the solution:
The solution must provide data encryption at rest
The solution must provide the ability to reduce the amount of storage consumed from duplicate data
The solution must minimize the amount of resources consumed by the encryption process.
The architect has made a design decision that VM Encryption will be used to meet these requirements.
Which two implications should the architect include in the design in relation to this design decision? (Choose two.)
An architect is updating the design for a vSphere environment.
During a workshop focused on security, the following has been identified:
It has been determined that any configuration of ESXi hosts can only be completed via VMware vCenter
The Direct Console User Interface (DCUI) service must be disabled on ESXi hosts
The SSH service must be disabled on ESXi hosts
Based on the information from the workshop, which element does the architect need to include in the design?
Which two vSphere cluster-related design details would an architect document in a physical design? (Choose two.)
An architect is designing a solution for a customer to meet the following business objectives:
Pass compliance audits
Reuse compute hardware
Grow by 10% per year
Move to a subscription-based consumption model
Which business objective translates as a conceptual model constraint?
Refer to the exhibit.
An architect is assigned a new project to design a VMware hybrid cloud solution.
The project is following a proven design methodology following the V-Model of systems engineering and verification. The selected methodology follows these phases: Assess, Design, Deploy and Validate.
Which activity would be conducted during the Design phase?
Which is a benefit of using vSAN stretched clusters in VMware Cloud Foundation?
An architect is discussing recoverability considerations for a new vSphere solution as part of a requirements workshop. The customer has informed the architect that the company policy is to not perform backups of ESXi hosts due to their selected backup software not supporting the ESXi software. In the past, when hosts have experienced failures, the hosts have been reinstalled from the VMware provided ESXi image and manually configured by an administrator. The customer asks the architect to design a solution that will reduce the manual effort required by the administrator to return a failed host to service.
What could the architect include in the design to meet the customer's request?
An architect is reviewing the information provided by a customer for a new vSphere solution design. The customer has stated that some of the virtual machines (VMs) that will be hosted on the new solution handle credit card information from their users as part of an online payment application, and that some of the information will need to be stored temporarily to allow transactions to be completed. Therefore, the solution must be designed to be able to mask or hash the stored information as they will need to show compliance against common industry standards that contain references to the requirements for handling sensitive information.
Which design quality is being requested by the customer?
An architect is tasked with designing a solution to monitor the operational state of a VMware Cloud Foundation environment through ad-hoc reporting and custom dashboards, alerts, and notifications.
Using VMware Validated Solutions, which validated solution can the architect leverage to meet this requirement?
Which four factors should an architect consider when calculating the number of hosts required for a new multi-site vSphere-based solution that utilizes external storage? (Choose four.)
An architect is responsible for extending the hosting design for a customer. The customer has a mission-critical 3-node application which is load balanced in an active/active/passive configuration. The application administrator requests that the virtual infrastructure team be responsible for maintaining platform level availability. An organizational policy exists to mandate the highest possible availability for mission-critical applications.
Based on the resource requirements, the architect has made the following design decision:
The target vSphere cluster contains three VMware ESXi host servers
A combination of which additional four physical design decisions should the architect make to maximize availability of the application? (Choose four.)
An architect is designing a new vSphere solution. The following information has been gathered during the design workshops with the customer:
The solution will be deployed into two availability zones (AZs)
The solution will be configured as a single stretched cluster with shared storage across the two AZs
Production and Development workloads will run across both AZs
The cluster is configured as N + 1
The architect needs to ensure that, in the event of a host failure during maintenance of another host in the cluster, only the Production workloads are recovered.
What should the architect include in the design to meet this requirement?
An architect is designing the access management component of a vSphere-based solution. During a requirements gathering workshop, the customer states that the architecture must use a centralized user authentication solution.
The architect decides that an Open Lightweight Directory Access Protocol (OpenLDAP) solution would meet the requirement. The security team intervenes and requires that the solution use the corporate Active Directory Domain Services solution.
At which point did the architect's design become constrained?
An architect is responsible for designing a new vSphere-based solution to meet the following customer requirements:
The solution must support component-level redundancy.
The solution must support physical segregation of management and workload traffic.
Any traffic from virtual infrastructure-level operations (such as migrations of workloads between hosts within a cluster) must not impact any workload.
The solution should react to any substantial impact of physical network traffic to ensure workload traffic is unaffected.
In response to this requirement, the architect makes the following logical design decisions:
The solution will separate vSphere management traffic from all other network traffic.
The solution will ensure that all replication and vMotion traffic will be separated from all other traffic.
The solution will separate workload traffic from all other network traffic.
The customer has a hardware standard for physical VMware ESXi host servers that includes 6 x 10 GbE network.
Which three physical design decisions should the architect make to meet the requirements? (Choose three.)
An architect is tasked with an application migration to a new VMware Cloud platform. The application service owner assistance from the architect to identify the technical requirements of the application.
The following has been made available following initial discussions:
A VMware Aria Operations report containing current resource usage
The output from a planning session including a roadmap for planned service growth
A service dependency map from the company’s IT operations management tool
The desired consolidation ratio for the target platform is 10:1
The applications hosting budget is reducing by 10%
Which two contain the technical requirements of the application? (Choose two.)
An architect is updating an existing design to include a new vSphere cluster to meet the following customer requirements:
The solution must provide automatic load redistribution of workloads across all resources in the cluster
The solution must consider the usage patterns of workloads when performing load redistribution
The solution must provide capacity to reserve resources equal to two ESXi hosts for failover in the event of a host failure
The architect has also collected the following assumptions and constraints during the design workshops:
A001 - Budget is available for additional hardware and software if required to meet the solution requirements
A002 - Capacity is available to allow the deployment of additional tooling to manage the solution
C001 - All management workloads must be deployed to the existing vSphere management cluster
Which three design decisions should the architect include to meet the documented requirements? (Choose three.)
A company has a requirement that all production applications must have a maximum tolerable downtime (MTD) of one hour per month.
Which statement would be included in the conceptual design to support this requirement?
A company will be replacing the external storage array that is currently providing storage to the vSphere environment. The architect must design a storage architecture for existing and future workloads. Company policy required storage separation of workloads by departments.
Which design decision should the architect make to satisfy the requirement and scale for additional departments?
An architect is designing a new hosting platform for a healthcare provider with proposed locations in three regional areas.
The following set of requirements have been provided by key stakeholders:
REQ001 - The hosting platform must support long distance vMotion between the primary and secondary site.
REQ002 - The maximum RTT (round-trip time) latency between the primary site and the secondary site must be less than 150 milliseconds.
REQ003 - The hosting platform must be manageable from assets located in the third site.
REQ004 - Each location must scale to support a minimum of 35TB storage.
Which requirement would be classified as a technical (formerly non-functional) requirement for the new hosting platform?
An architect is responsible for the lifecycle management design for a brownfield vSphere-based solution.
The following information has been provided during initial meetings around the new solution:
Existing heterogeneous server hardware will be used to provide the hosting platform.
The available hardware is:
- 10 servers that contain 2 x 20-Core Intel Xeon processors and 512 GB RAM from Vendor A
- 10 servers that contain 2 x 24-Core Intel Xeon processors and 768 GB RAM from Vendor A
- 20 servers that contain 2 x 16-Core AMD EPYC processors and 512 GB RAM from Vendor B
- 10 servers that contain 1 x 24-Core AMD EPYC processors and 256 GB RAM from Vendor B
All of the hardware is currently listed on the VMware Hardware Compatibility List (HCL).
All existing server hardware has 36 months vendor support remaining.
The requirements from the customer are:
REQ001 - The solution must support the hosting of 5,000 workloads spread across two physical sites.
REQ002 - The solution should minimize the number of clusters.
REQ003 - The solution must ensure that there is no impact to service when completing upgrades.
Given the resource requirements needed for the solution, the architect has calculated that all of the existing servers will be required to provide sufficient resources for the new environment. The Intel-based (Vendor A) servers will be deployed to the primary site and both the Intel-based and AMD-based servers (Vendor B) will be deployed to the secondary site.
Which assumption should the architect make to support the lifecycle management of vSphere 8?
An architect is designing a new vSphere 8 environment and needs to plan the migration of virtual machines from the source vSphere 7 infrastructure.
The following has been captured about the source infrastructure and project:
All virtual machines operate supported versions of Microsoft Windows
All virtual machines have VMware Tools 11 or higher installed
vCenter Enhanced Linked Mode is configured
VMware PowerCLI is available in the environment
No budget is available for discovery tooling
The architect must capture and review active services from inside running virtual machines to inform the migration design.
Considering the information available, which method can the architect use to acquire the information required?
An architect is responsible for the following customer considerations in a hardware refresh:
Capacity planning will ensure that the environment does not exceed 70% of peak-average utilization on deployment.
CPU purchases will favor clock speed and last level cache over cores per socket.
Additional ESXi hosts will be added to the cluster when CPU or memory utilization exceeds 70% for 3 consecutive business days.
Path Selection policy will be set to round robin and set to switch paths with every SCSI command.
vCPU to pCPU ratio may not exceed 5:1.
What are three considerations when designing for performance? (Choose three.)