Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

3V0-21.23 VMware vSphere 8.x Advanced Design Questions and Answers

Questions 4

A company has the requirement of ensuring that business-critical applications have the necessary network bandwidth to function optimally and maintain a consistent quality of service (QoS).

Which statement would be included in the logical design to support this requirement?

Options:

A.

The network infrastructure must ensure secure communications and efficiently use available bandwidth.

B.

Network resource pool named "bca-pool-02" is given a reservation quota of 5 Gbit/sec.

C.

The distributed switch will use a minimum of 25 Gbps Ethernet.

D.

A distributed virtual switch will be created and Network I/O Control will be enabled.

Buy Now
Questions 5

An architect is discussing the design of a vSphere solution with a customer. The following requirements have been defined for the solution:

The solution must provide data encryption at rest

The solution must provide the ability to reduce the amount of storage consumed from duplicate data

The solution must minimize the amount of resources consumed by the encryption process.

The architect has made a design decision that VM Encryption will be used to meet these requirements.

Which two implications should the architect include in the design in relation to this design decision? (Choose two.)

Options:

A.

Encryption is a CPU-intensive feature. Resource Pools should be used to assign shares to the encrypted VMs.

B.

When data is encrypted by the storage device, the effectiveness of de-duplication on the storage will be unaffected.

C.

Encryption is a CPU-intensive feature. The ESXi hosts should use the AES-NI BIOS setting to improve the performance of encryption and reduce CPU utilization.

D.

Encryption is a memory-intensive feature. The ESXi hosts should use the AES-NI BIOS setting to improve the performance of encryption and reduce memory utilization.

E.

When data is encrypted by the ESXi host, the effectiveness of de-duplication on the storage may be reduced.

Buy Now
Questions 6

An architect is updating the design for a vSphere environment.

During a workshop focused on security, the following has been identified:

It has been determined that any configuration of ESXi hosts can only be completed via VMware vCenter

The Direct Console User Interface (DCUI) service must be disabled on ESXi hosts

The SSH service must be disabled on ESXi hosts

Based on the information from the workshop, which element does the architect need to include in the design?

Options:

A.

Strict Lockdown Mode

B.

Normal Lockdown Mode

C.

Normal Lockdown Mode with a defined Exception User list

D.

Strict Lockdown Mode with a defined Exception User list

Buy Now
Questions 7

Which two vSphere cluster-related design details would an architect document in a physical design? (Choose two.)

Options:

A.

The solution will set the isolation.tools.diskshrink,disable advanced setting to true.

B.

The solution will set the das.isolationaddress advanced setting to 192.168.100.2.

C.

The solution will deploy a dedicated VMware Management Cluster into the primary site.

D.

The solution will configure vSphere High Availability (HA).

E.

The solution will set the das.usedefaultisolationaddress advanced setting to true.

Buy Now
Questions 8

An architect is designing a solution for a customer to meet the following business objectives:

Pass compliance audits

Reuse compute hardware

Grow by 10% per year

Move to a subscription-based consumption model

Which business objective translates as a conceptual model constraint?

Options:

A.

Pass compliance audits

B.

Reuse compute hardware

C.

Move to a subscription-based consumption model

D.

Grow by 10% per year

Buy Now
Questions 9

Refer to the exhibit.

An architect is assigned a new project to design a VMware hybrid cloud solution.

The project is following a proven design methodology following the V-Model of systems engineering and verification. The selected methodology follows these phases: Assess, Design, Deploy and Validate.

Which activity would be conducted during the Design phase?

Options:

A.

The architect conducts a series of group interviews with stakeholders

B.

The architect helps stakeholders learn the mechanics of the solution

C.

The architect resolves configuration issues and addresses concerns

D.

The architect defines the scope of the project

Buy Now
Questions 10

Which is a benefit of using vSAN stretched clusters in VMware Cloud Foundation?

Options:

A.

To enable high availability of virtual machines across different availability zones

B.

To reduce the cost by eliminating the need for additional hardware and software components

C.

To simplify physical network configurations by automatically configuring the required network components

D.

To improve application performance by reducing network latency between availability zones

Buy Now
Questions 11

An architect is discussing recoverability considerations for a new vSphere solution as part of a requirements workshop. The customer has informed the architect that the company policy is to not perform backups of ESXi hosts due to their selected backup software not supporting the ESXi software. In the past, when hosts have experienced failures, the hosts have been reinstalled from the VMware provided ESXi image and manually configured by an administrator. The customer asks the architect to design a solution that will reduce the manual effort required by the administrator to return a failed host to service.

What could the architect include in the design to meet the customer's request?

Options:

A.

Use the ESXi command line to perform backups of the ESXi hosts to a central location

B.

Configure a host profile per cluster

C.

Create a custom iso image of ESXi and update it each time VMware releases a new update

D.

Configure ESXi hosts with RAID1 boot volumes

Buy Now
Questions 12

An architect is reviewing the information provided by a customer for a new vSphere solution design. The customer has stated that some of the virtual machines (VMs) that will be hosted on the new solution handle credit card information from their users as part of an online payment application, and that some of the information will need to be stored temporarily to allow transactions to be completed. Therefore, the solution must be designed to be able to mask or hash the stored information as they will need to show compliance against common industry standards that contain references to the requirements for handling sensitive information.

Which design quality is being requested by the customer?

Options:

A.

Manageability

B.

Performance

C.

Security

D.

Recoverability

Buy Now
Questions 13

What is an example of a performance design quality?

Options:

A.

The solution must scale to meet spikes in CPU demand.

B.

The solution must provide 40 physical CPU cores and 20 TB of physical memory.

C.

The solution must support applications with a maximum tolerable downtime (MTD) of four hours.

D.

The solution must support applications with 1,000 transactions per second (TPS).

Buy Now
Questions 14

An architect is tasked with designing a solution to monitor the operational state of a VMware Cloud Foundation environment through ad-hoc reporting and custom dashboards, alerts, and notifications.

Using VMware Validated Solutions, which validated solution can the architect leverage to meet this requirement?

Options:

A.

Private Cloud Automation for VMware Cloud Foundation

B.

Intelligent Operations Management for VMware Cloud Foundation

C.

VMware Validated Design for VMware Cloud Foundation

D.

Heath Reporting and Monitoring for VMware Cloud Foundation

Buy Now
Questions 15

Which four factors should an architect consider when calculating the number of hosts required for a new multi-site vSphere-based solution that utilizes external storage? (Choose four.)

Options:

A.

The workload profile (CPU and memory) of each workload

B.

The amount of resources required for virtual machine (VM) swap and VM snapshots

C.

The number of existinq workloads that will be decommissioned prior to the completion of project

D.

The number of existinq workloads that will be miqrated onto the new solution

E.

The number of network connections per physical host server

F.

The future physical location of any workloads

G.

The hardware specification of the underlying infrastructure

Buy Now
Questions 16

An architect is responsible for extending the hosting design for a customer. The customer has a mission-critical 3-node application which is load balanced in an active/active/passive configuration. The application administrator requests that the virtual infrastructure team be responsible for maintaining platform level availability. An organizational policy exists to mandate the highest possible availability for mission-critical applications.

Based on the resource requirements, the architect has made the following design decision:

The target vSphere cluster contains three VMware ESXi host servers

A combination of which additional four physical design decisions should the architect make to maximize availability of the application? (Choose four.)

Options:

A.

The solution will create a VM-Host Affinity rule that specifies that workloads must run on hosts in a group.

B.

The solution will enable vSphere High Availability (HA) with restart priority set to "Highest" for the application virtual machines.

C.

The solution will create a VM-VM Affinity rule to keep virtual machines separate.

D.

The solution will create a host DRS group containing all hosts within the cluster.

E.

The solution will enable vSphere Fault Tolerance with vSphere High Availability (HA) virtual machine component failure enabled.

F.

The solution will create a virtual machine DRS group that contains all of the critical application workloads.

G.

The solution will create a VM-VM Affinity rule to keep virtual machines together.

Buy Now
Questions 17

An architect is designing a new vSphere solution. The following information has been gathered during the design workshops with the customer:

The solution will be deployed into two availability zones (AZs)

The solution will be configured as a single stretched cluster with shared storage across the two AZs

Production and Development workloads will run across both AZs

The cluster is configured as N + 1

The architect needs to ensure that, in the event of a host failure during maintenance of another host in the cluster, only the Production workloads are recovered.

What should the architect include in the design to meet this requirement?

Options:

A.

Configure vSphere HA VM Monitoring to VM and Application MonitoringSet the VM monitoring sensitivity to Custom

B.

Configure vSphere HA VM Monitoring to VM Monitoring onlySet the VM monitoring sensitivity to Preset of High

C.

Configure vSphere HA Host Failure Response to Restart VMsSet the Development VMs to Disabled as the Restart Priority

D.

Configure vSphere HA Host Failure Response to Restart VMsSet the cluster default Restart VM Restart Priority to Highest

Buy Now
Questions 18

An architect is designing the access management component of a vSphere-based solution. During a requirements gathering workshop, the customer states that the architecture must use a centralized user authentication solution.

The architect decides that an Open Lightweight Directory Access Protocol (OpenLDAP) solution would meet the requirement. The security team intervenes and requires that the solution use the corporate Active Directory Domain Services solution.

At which point did the architect's design become constrained?

Options:

A.

When the customer provided the requirement for the use a centralized user authentication solution.

B.

When the architect made the design decision to use an OpenLDAP solution for user authentication.

C.

When the architect finished documenting all of the requirements.

D.

When the customer required the use of the corporate Active Directory Domain Services solution.

Buy Now
Questions 19

An architect is responsible for designing a new vSphere-based solution to meet the following customer requirements:

The solution must support component-level redundancy.

The solution must support physical segregation of management and workload traffic.

Any traffic from virtual infrastructure-level operations (such as migrations of workloads between hosts within a cluster) must not impact any workload.

The solution should react to any substantial impact of physical network traffic to ensure workload traffic is unaffected.

In response to this requirement, the architect makes the following logical design decisions:

The solution will separate vSphere management traffic from all other network traffic.

The solution will ensure that all replication and vMotion traffic will be separated from all other traffic.

The solution will separate workload traffic from all other network traffic.

The customer has a hardware standard for physical VMware ESXi host servers that includes 6 x 10 GbE network.

Which three physical design decisions should the architect make to meet the requirements? (Choose three.)

Options:

A.

The solution will configure the Route Based on Source MAC Hash load balancing method.

B.

The solution will deploy three (3) vSphere standard switches each with a single uplink port group.

C.

The solution will configure the six (6) available network connections into load balanced pairs.

D.

The solution will deploy a vSphere distributed switch with three (3) uplink port groups.

E.

The solution will configure the six (6) available network connections into a single load balanced group.

F.

The solution will configure the Route Based on Physical NIC Load load balancing method.

Buy Now
Questions 20

An architect is tasked with an application migration to a new VMware Cloud platform. The application service owner assistance from the architect to identify the technical requirements of the application.

The following has been made available following initial discussions:

A VMware Aria Operations report containing current resource usage

The output from a planning session including a roadmap for planned service growth

A service dependency map from the company’s IT operations management tool

The desired consolidation ratio for the target platform is 10:1

The applications hosting budget is reducing by 10%

Which two contain the technical requirements of the application? (Choose two.)

Options:

A.

The output from a planning session including a roadmap for planned service growth

B.

The desired consolidation ratio for the target platform is 10:1

C.

A VMware Aria Operations report containing current resource usage

D.

The applications hosting budget is reducing by 10%

E.

A service dependency map from the company's IT operations management tool

Buy Now
Questions 21

An architect is updating an existing design to include a new vSphere cluster to meet the following customer requirements:

The solution must provide automatic load redistribution of workloads across all resources in the cluster

The solution must consider the usage patterns of workloads when performing load redistribution

The solution must provide capacity to reserve resources equal to two ESXi hosts for failover in the event of a host failure

The architect has also collected the following assumptions and constraints during the design workshops:

A001 - Budget is available for additional hardware and software if required to meet the solution requirements

A002 - Capacity is available to allow the deployment of additional tooling to manage the solution

C001 - All management workloads must be deployed to the existing vSphere management cluster

Which three design decisions should the architect include to meet the documented requirements? (Choose three.)

Options:

A.

The solution will enable the Predictive DRS option to avoid host over-commitment.

B.

The solution will enable the Memory Metric for Load Balancing option to avoid host over-commitment.

C.

The solution will deploy VMware Aria Operations to monitor the vSphere environment.

D.

The solution will enable the VM Distribution option to avoid host over-commitment.

E.

The solution will deploy a Distributed Resource Scheduler (DRS) enabled cluster with sufficient capacity to meet the workload demands.

F.

The solution will deploy a vSphere Distributed Power Management (DPM) enabled cluster with sufficient capacity to meet the workload demands.

Buy Now
Questions 22

A company has a requirement that all production applications must have a maximum tolerable downtime (MTD) of one hour per month.

Which statement would be included in the conceptual design to support this requirement?

Options:

A.

Production applications will run in a dedicated Tier 2 cluster.

B.

Server hardware has been allocated for the production applications.

C.

vSphere Fault Tolerance (FT) will not be enabled for the production applications.

D.

vSphere HA Host Failure Response will be set to Restart VMs.

Buy Now
Questions 23

A company will be replacing the external storage array that is currently providing storage to the vSphere environment. The architect must design a storage architecture for existing and future workloads. Company policy required storage separation of workloads by departments.

Which design decision should the architect make to satisfy the requirement and scale for additional departments?

Options:

A.

Use storage volumes based on applications.

B.

Use one storage volume per department and create new volumes for new departments.

C.

Use one storage volume per existing department and extend current volumes for new departments.

D.

Use N + 1 storage volumes for current and future workloads.

Buy Now
Questions 24

An architect is designing a new hosting platform for a healthcare provider with proposed locations in three regional areas.

The following set of requirements have been provided by key stakeholders:

REQ001 - The hosting platform must support long distance vMotion between the primary and secondary site.

REQ002 - The maximum RTT (round-trip time) latency between the primary site and the secondary site must be less than 150 milliseconds.

REQ003 - The hosting platform must be manageable from assets located in the third site.

REQ004 - Each location must scale to support a minimum of 35TB storage.

Which requirement would be classified as a technical (formerly non-functional) requirement for the new hosting platform?

Options:

A.

Each location must scale to support a minimum of 35TB storaqe.

B.

The maximum RTT (round-trip time) latency between the primary and secondary site must be less than 150 milliseconds.

C.

The hosting platform must be manageable from assets located in the third site.

D.

The hosting platform must support long distance vMotion between the primary and secondary site.

Buy Now
Questions 25

An architect is responsible for the lifecycle management design for a brownfield vSphere-based solution.

The following information has been provided during initial meetings around the new solution:

Existing heterogeneous server hardware will be used to provide the hosting platform.

The available hardware is:

- 10 servers that contain 2 x 20-Core Intel Xeon processors and 512 GB RAM from Vendor A

- 10 servers that contain 2 x 24-Core Intel Xeon processors and 768 GB RAM from Vendor A

- 20 servers that contain 2 x 16-Core AMD EPYC processors and 512 GB RAM from Vendor B

- 10 servers that contain 1 x 24-Core AMD EPYC processors and 256 GB RAM from Vendor B

All of the hardware is currently listed on the VMware Hardware Compatibility List (HCL).

All existing server hardware has 36 months vendor support remaining.

The requirements from the customer are:

REQ001 - The solution must support the hosting of 5,000 workloads spread across two physical sites.

REQ002 - The solution should minimize the number of clusters.

REQ003 - The solution must ensure that there is no impact to service when completing upgrades.

Given the resource requirements needed for the solution, the architect has calculated that all of the existing servers will be required to provide sufficient resources for the new environment. The Intel-based (Vendor A) servers will be deployed to the primary site and both the Intel-based and AMD-based servers (Vendor B) will be deployed to the secondary site.

Which assumption should the architect make to support the lifecycle management of vSphere 8?

Options:

A.

The different processor architectures across both sites will remediate against a shared vSphere Lifecycle Manager baseline.

B.

The different processor architectures will be located in the same cluster to support vSphere Lifecycle Manager image-based remediation.

C.

The different processor architecture within a single site will remediate against a single vSphere Lifecycle Manager image.

D.

The different processor architectures across both sites will remediate against a single vSphere Lifecycle Manager image.

Buy Now
Questions 26

An architect is designing a new vSphere 8 environment and needs to plan the migration of virtual machines from the source vSphere 7 infrastructure.

The following has been captured about the source infrastructure and project:

All virtual machines operate supported versions of Microsoft Windows

All virtual machines have VMware Tools 11 or higher installed

vCenter Enhanced Linked Mode is configured

VMware PowerCLI is available in the environment

No budget is available for discovery tooling

The architect must capture and review active services from inside running virtual machines to inform the migration design.

Considering the information available, which method can the architect use to acquire the information required?

Options:

A.

Request and review the information via VMware vCenter

B.

Deploy and review the service information from VMware Aria Operations

C.

Deploy and review the service information from VMware Aria Operations for Applications

D.

Request and review the information via VMware Tools and VMware PowerCLI

Buy Now
Questions 27

An architect is responsible for the following customer considerations in a hardware refresh:

Capacity planning will ensure that the environment does not exceed 70% of peak-average utilization on deployment.

CPU purchases will favor clock speed and last level cache over cores per socket.

Additional ESXi hosts will be added to the cluster when CPU or memory utilization exceeds 70% for 3 consecutive business days.

Path Selection policy will be set to round robin and set to switch paths with every SCSI command.

vCPU to pCPU ratio may not exceed 5:1.

What are three considerations when designing for performance? (Choose three.)

Options:

A.

Path Selection policy will be set to round robin and set to switch paths with every SCSI command.

B.

vCPU to pCPU ratio may not exceed 5:1.

C.

Capacity planning will ensure that the environment does not exceed 70% of peak-average utilization on deployment.

D.

All ESXi hosts must have four paths to the storage array.

E.

CPU purchases will favor clock speed and last level cache over cores per socket.

F.

Additional ESXi hosts will be added to the cluster when CPU or memory utilization exceeds 70% for 3 consecutive business days.

Buy Now
Exam Code: 3V0-21.23
Exam Name: VMware vSphere 8.x Advanced Design
Last Update: Aug 17, 2025
Questions: 92
3V0-21.23 pdf

3V0-21.23 PDF

$29.75  $84.99
3V0-21.23 Engine

3V0-21.23 Testing Engine

$35  $99.99
3V0-21.23 PDF + Engine

3V0-21.23 PDF + Testing Engine

$47.25  $134.99