A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .
As we begin to describe the things occurring with our process through a Process Map we begin to see some steps that are NVA which stands for ____________.
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of supporting the Response Plan.
The Pareto Chart is a tool that displays data that typically follows what ratio?
To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of supporting the Response Plan in case a defect is noticed.
Measurement System Analysis is a procedure used to quantify variation of the method or system used for taking measurements and used to assure usable data is collected.
To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.
A Micro Process Map may map a process showing the entire activities of a department and can likely be broken into many Macro Process Maps showing numerous processes that comprise the activities of the department.
When we create a Process Map we use a __________ to show the direction of work flow.
Voice of the Business is a Lean Six Sigma technique to determine the needs and wants of the ______________ of the business.
As we begin to describe the things occurring with our process through a Process Map we begin to see some steps that are NVA which stands for ____________.
When a process has proven itself to function at a Six Sigma level this means there are less than ________ defects per million opportunities.
One of the primary deliverables from performing a SIPOC is to begin to understand which inputs have the greatest affect on the ____________ most valued outputs.
Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period in months (before money costs and taxes)?
Lean Six Sigma Yellow Belt Certification | CLSSYB Questions Answers | CLSSYB Test Prep | Certified Lean Six Sigma Yellow Belt Questions PDF | CLSSYB Online Exam | CLSSYB Practice Test | CLSSYB PDF | CLSSYB Test Questions | CLSSYB Study Material | CLSSYB Exam Preparation | CLSSYB Valid Dumps | CLSSYB Real Questions | Lean Six Sigma Yellow Belt Certification CLSSYB Exam Questions