Questions 4

The Maximum distance of WIFI coverage for WIFI converter is ( )m.

Options:

A.

20

B.

30

C.

40

D.

50

Buy Now
Questions 5

When load rate is low and stable, partial power modules of UPS could enter into hibernation, the remaining power modules undertake the larger loads, which improves system efficiency.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 6

The BCB-BOX provides overload and short-circuit protection as well as remote trip control.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 7

ECC800 can provide () functions.

Options:

A.

Querying alarms

B.

Exporting historical data

C.

Managing users

D.

Setting alarm notification

Buy Now
Questions 8

For NetCol5000-A installation, the required time of preserving positive pressure is ( ) hours.

Options:

A.

8

B.

12

C.

24

D.

16

Buy Now
Questions 9

First time powering on UPS5000-E, make sure that the UPS main input switch, bypass switch, output switch, maintenance bypass switch and battery switch are all OFF

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 10

On the NetEco, the door name can’t be modified.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 11

Users can modify the login password on the ( ) menu of the ECC800 WebUI.

Options:

A.

Version

B.

E-label

C.

User management

D.

Software upgrade

Buy Now
Questions 12

Where is the recommended installation location for the Smart ETH socket?

Options:

A.

Control skylight

B.

Inside the network cabinet

C.

Inside the threshold

D.

Side of the cable trough on the top of the cabinet

Buy Now
Questions 13

In the FusionModule1000, all surface-mounted fire control cables are rounded through metal hoses to prevent damage in case of fire.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 14

The ATS/MCCB input unit of an integrated UPS is used to ( ).

Options:

A.

Provide the branch output of the mains supply

B.

Provide dual or single input for cabinets.

C.

Provide the branch output of the UPS supply

D.

Monitor the running status.

Buy Now
Questions 15

Users can monitor devices such as UPS and air conditioner on ECC800.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 16

During Nitrogen injecting, a pressure relief valve must be installed on the nitrogen cylinder.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 17

In direct ventilation mode, the direct ventilation system exchanges heat between outdoor cool air and indoor hot air.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 18

If a fire occurs in the FusionModule1000, the gas release indicator will display “DON’T ENTER WHILE RELEASING GAS”

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 19

When doing maintenance of UPS5000-E, make sure loads continue to powered, we should first perform EPO and then turn the maintenance bypass switch.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 20

When the temperature detector or smoke detector in the FusionModule1000 generates an alarm, ( ) emits a continuous beeping sound to remind you to take measures as soon as possible to avoid a major accident.

Options:

A.

Electricity or voltage ratio setting error

B.

The corresponding voltage collection line is abnormal.

C.

Corresponding current transformer failure

D.

Intelligent power meter failure

Buy Now
Questions 21

2.4G antenna of ECC800 should be connected to ( ).

Options:

A.

RF_ZA line interface

B.

3G/4G antenna interface

C.

RS485 port

D.

DO output dry contact

Buy Now
Questions 22

The preset password of UPS2000-G-(6-20 kVA) panel is ()

Options:

A.

Changeme

B.

Changeme123 C. 000001

C.

neteco

Buy Now
Questions 23

To avoid voltage unbalance between batteries, batteries need to do ( ) in period.

Options:

A.

Float Charging

B.

Self Discharge

C.

Equalized Charging

D.

Charging Test

Buy Now
Questions 24

When a backfeed occurs in main or bypass, the backfeed protection card can send signals to trip the input circuit breaker.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 25

The compressor suction pressure of NetCol5000-A25kW is low. It is possible that ().

Options:

A.

The electric heater is burnt out

B.

The refrigerant is insufficient.

C.

There is water vapor in the pipe

D.

The condensing pressure is low.

Buy Now
Questions 26

The preset battery equalized charging voltage of UPS2000-G-(6-20K) is () V/cell.

Options:

A.

2.25

B.

2.35

C.

2.45

D.

2.15

Buy Now
Questions 27

Which component does not support wireless networking?

Options:

A.

Access actuator

B.

AC Actuator

C.

ETH converter

D.

XXX

Buy Now
Questions 28

Historical data can be exported from the ECC800.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 29

When a short circuit occurs in a battery, the charging voltage of the faulty battery is ().

Options:

A.

Higher

B.

Unchanged

C.

Lower

D.

Unbalance

Buy Now
Questions 30

NetCol5000-A eliminate partial hot spots by in-row cooling.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 31

The Ibat2.0, optional component of the UPS5000-E, can detect () of each battery.

Options:

A.

Frequency

B.

Voltage

C.

Internal resistance

D.

Battery poles temperature

Buy Now
Questions 32

The ( ) is used to convert PoE signals into WIFI signals.

Options:

A.

AC actuator

B.

WIFI converter

C.

VCN

D.

Skylight actuator

Buy Now
Questions 33

To shut down one UPS in UPS2000-G-20kVA parallel system, you must ().

Options:

A.

Perform “shut down operation” on the UPS twice.

B.

Perform “shut down operation” on the UPS only once

C.

Turn off the input circuit breaker of the UPS

D.

Perform “shut down operation” on all UPS

Buy Now
Questions 34

On the NetEco, users can viewed detailed camera information such as the camera name, code, IP address.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 35

Backup time of battery depends on discharge current of battery.

Options:

A.

TRUE

B.

FALSE

Buy Now
Questions 36

NetEco can’t manage the data center facilities in different places.

Options:

A.

TRUE

B.

FALSE

Buy Now
Exam Code: H12-425
Exam Name: HCIP-Data Center Facility Deployment
Last Update: May 13, 2025
Questions: 240